Skip to content
B73 Apartments Residensiële Gebou by Starh - Svetoslav Stanislavov

B73 Apartments Residensiële Gebou by Starh - Svetoslav Stanislavov is a highly esteemed winner of the very prestigious 2022 A' Design Award in Brons in Argitektuur-, Gebou- en Struktuurontwerp Competition Category.


BronsArgitektuur· 2022

B73 Apartments Residensiële Gebou

by Starh - Svetoslav Stanislavov

Client: Starh

A' Design Award in Brons Winner in Argitektuur Category

Colors

The Design

About B73 Apartments Residensiële Gebou

B73 is ingebed in die konteks met sy innoverende voorkoms, met hoë-end materiaalgebruik en kwaliteit in uitvoering. Elke verdieping bestaan ​​uit 'n enkelwoonstel. B73 is een van die min geboue in die land wat soliede oppervlakmateriaal en termovorming vir komplekse 3D-vorms gebruik. Die fasade se morfologie begin vanaf 'n oppervlak wat gespan is met strategies geplaasde snitte. 'n Onderbreking vind plaas wat die vorm van 'n slukvoël skep. 'n Ligte kunsinstallasie word in die voorportaal op die grondvloer geplaas.

The Recognition

About the A' Design Award in Brons

B73 Apartments Residensiële Gebou is 'n wenner van die A' Design Award in Brons, 'n hoogs prestigieuse erkenning wat toegeken word aan uitstaande ontwerpe wat gekenmerk word deur kreatiwiteit, vindingrykheid en skerpsinnigheid. Wenners in Brons is ruimskoots vaardige en opvallend kreatiewe artefakte wat die groot ervaring, verbeelding en vindingrykheid van hul ontwerpers bevestig. Daar word verwag dat B73 Apartments Residensiële Gebou 'n hoog aangeskrewe, bewonderde en gekoesterde voorwerp is wat merkwaardig professioneel en innoverend is. Hierdie ontwerp wat die A' Design Award in Brons gewen het, inkorporeer die beste praktyke in kuns, wetenskap, ontwerp en tegnologie en is uitstekend vanweë sy aandag aan detail. B73 Apartments Residensiële Gebou bevredig behoeftes pragtig, raak aan begeertes, bekoor gevoelens en spreek die nuuskierigheid aan.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
B73 stands out in the urban context with its innovative and impactful look, having high-end material usage and exceptional quality in execution. Each residential floor comprises of just a single apartment.

B73 is one of the very few buildings in Bulgaria using solid surface material and thermoforming for complex 3D shapes. The concept of the facade starts from a simple surface that is stretched with strategically placed cuts. A discontinuation occurs creating the shape of a swallow bird.

The building's lobby hosts a uniquely designed light art installation specially for this space, being one of a kind in Eastern Europe.
Dimensions & Packaging
26-meters high, the building has 6 floors over ground and 2 underground ones. Total built-up area is 2,100 sqm.
Tags
Thermoforming, Solid Surface, Innovation, Technology, Residential, 3D, Premium, Facade, Light Installation
Production Technology
The complete building envelope and facade design are achieved through using acrylic stone material and thermoforming. It was needed to work with three different softwares in order to achieve the 3D bending of most of the elements, so they could be molded afterwards.
The building lobby hosts a uniquely designed light art installation specially for the space, being one of a kind in Eastern Europe.
Design Challenge
The biggest challenge was to meet all investor's expectations for high quality execution. The whole process required precision on every step together with well managed synchronization between contractors.
Research
Having a busy boulevard, difference of heights and public and private buildings in the area, plus, non-homogeneous architectural language, makes inserting a new addition difficult. Instead, the approach was to elevate the quality of design and materials of the existing context, by inserting a well-executed gem.
Inspiration
The strongest motivation for this project came with the investor themselves and their will to create an outstanding building that has no compromises on every level. This provided us with almost limitless creative freedom. Afterwards, we succeeded to fully realize our design by using our previous experience with the innovative solid surface material. Organic forms and an overall white look come natural for us in our design.
Project Duration
The design phase of the project started in 2018 and the building was completed in April 2021.
Operation Flow
The interaction with the building fitting in the context is immediate. The diverse surrounding of materials, colors, heights, building state and shapes makes B73 pop out. Laying out a distinctive architectural line in the context benefits the neighborhood while changing the urban mood and perception.
Patents
Copyrights belong to STARH, 2021
Team Members
Svetoslav Stanislavov - Leading architect
Dimitar Katsarov
Iva Kostova
Radostina Petkova
Petar Nikolov
Hristo Dushev
Borislav Stanchev
Zhenia Atanasova
Georgi Pasev
Ivan Kovachev
Vladimir Kavaev
Debora Dimitrova
Sanya Kovacheva
Desislava Georgieva
Image Credits
Photographer Dian Stanchev

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate