Termalija Family Wellness Hovuzlar by Enota is a highly esteemed winner of the very prestigious 2020 A' Design Award Qızıl Mükafatı in Memarlıq, Bina və Struktur Dizaynı Competition Category.
QızılMemarlıq· 2020
Termalija Family Wellness Hovuzlar
by Enota
Client: Terme Olimia
A' Design Award Qızıl Mükafatı Winner in Memarlıq Category
Verified Award Winner
Verify Award Status for #92232The Design
About Termalija Family Wellness Hovuzlar
Termalija Family Wellness, Enota'nın son on beş ildə Terme Olimia’da inşa etdiyi və spa kompleksinin tamamilə çevrilməsini başa vurduğu bir sıra layihələr arasındadır. Uzaqdan baxıldıqda, tetraedral həcmlərin yeni çoxluqlu quruluşunun forması, rəngi və miqyası ətrafdakı kənd binalarının vizual şəkildə uzanan çoxluqlarının davamıdır. Yeni dam böyük yay kölgəsi kimi çıxış edir və qiymətli xarici məkanı ələ keçirmir.
The Recognition
About the A' Design Award Qızıl Mükafatı
Termalija Family Wellness Hovuzlar A' Design Award Qızıl Mükafatının qalibidir; bu, birinci dərəcəli, möhtəşəm və görkəmli dizaynlara verilən son dərəcə nüfuzlu tanınmadır. Qızıl qaliblər dizaynerlərinin dahiliyini, müdrikliyini və məharətini əks etdirən son dərəcə yenilikçi, baxışlı və parıltısı göz qamaşdıran yaradıcılıq nümunələridir. Gözlənilir ki, Termalija Family Wellness Hovuzlar misilsiz dəyər təqdim edən, çox tərif olunan, tendensiya yaradan və monumental ixtira olacaq. A' Design Award Qızıl Mükafatını qazanmış bu dizayn sənətin, elmin, dizaynın və texnologiyanın sərhədlərini genişləndirən və böyük fayda verən möhtəşəm, hörmət edilən layihədir. Termalija Family Wellness Hovuzlar güclü istək hissləri yaradır, ehtiras oyadır, yaradıcılığı həvəsləndirir və bizi heyran edir.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The seemingly complex geometry gives the new roof static strength, allowing the entire pool space to be covered virtually without supports. In this way, the new roof floats above the pool platform, which is designed as an exterior space. Numerous skylights in the roof, together with the ability to fully open all the facade glass surfaces, enable the guests to seamlessly pass through the interior of the building. Despite its size and the space it occupies, the new roof simply acts as a big summertime sunshade and does not usurp any of the precious exterior space.
- Dimensions & Packaging
- Size: 8.780 m2
Site: 10.200 m2
Footprint: 3.930 m2 - Tags
- Wellness, swimming pools, family spa, wood, natural, parametric, roof, architecture, rural, green
- Production Technology
- Fabrication techniques :
- combination of concrete and steel, building mostly underground with structural glazing and double cladding facade,
- large span roof construction from light steel framework,
- supporting tethraedical domes made of laminated wooden panels,
- structural glazed facade with large scale pivoting windows,
- pool plaza, designed in the same manner for outdoor and indoor pools – concrete base, cladded with Pebbletech finish, enabling complicated organic shapes. - Inspiration
- Termalija Family Wellness is the latest in the series of projects which we have built at Terme Olimia in the last fifteen years and concludes the complete transformation of the spa complex. A lot of effort was invested into designing the buildings in such a way that they don't fill the space but connect it even more with the surrounding nature. The volume of necessary space required siting of a larger structure which couldn´t simply be buried below the grade like in our previous projects on the site. No longer being able to reference only the surrounding natural landscape, the solution was found in scale and form of surrounding vernacular structures. Large roof above water area was divided into sets of smaller segments to prevent its scale from overwhelming the surroundings. Viewed from a distance, the shape, colour, and scale of new clustered structure of tetrahedral volumes is a continuation of the cluster of surrounding rural buildings, which visually extends into the heart of the complex.
- Project Duration
- The project started in 2016 and was constructed in May 2018 in Podčetrtek, Slovenia.
- Team Members
- Dean Lah
Milan Tomac
Peter Sovinc
Nuša Završnik Šilec
Polona Ruparčič
Peter Karba
Carlos Cuenca Solana
Jurij Ličen
Tjaž Bauer
Sara Mežik
Eva Tomac
Jakob Kajzer
Maja Majerič
Goran Djokić - Image Credits
- Image #1: Photographer Miran Kambič
Image #2: Photographer Miran Kambič
Image #3: Photographer Miran Kambič
Image #4: Photographer Miran Kambič
Image #5: Photographer Miran Kambič
Video Credits: Miran Kambič
PDF images: Photographer Miran Kambič
PDF plans: ENOTA
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.