Dizajn Heito 1909 Urbani Park od dizajnera ECG International Landscape Consultants je visoko cijenjeni dobitnik prestižne nagrade 2021 Srebrna nagrada A' Design Award u kategoriji Urbanističko Planiranje i Urbani Dizajn.
SrebroUrbanističko Planiranje· 2021
Heito 1909 Urbani Park
autor ECG International Landscape Consultants
Klijent: Pingtung County Government, Pan Men-an
Dobitnik nagrade Srebrna nagrada A' Design Award u kategoriji Urbanističko Planiranje
Verificirani dobitnik nagrade
Verificirajte status nagrade za #122644Dizajn
O dizajnu Heito 1909 Urbani Park
Zgrade i zemljište su se stalno uklanjali i obnavljali u ovo doba, svaki projekat je pomalo „Tabula Rasa“. Transformacija Heito 1909 je rijedak projekt adaptivne ponovne upotrebe, umjesto da bude opsjednut kultnim zgradama, sve u parku je dizajnirano iznutra prema van kao produžetak ruševina. Jedinstveni dizajn kreativno ugrađuje ruševine i oštećene strukture u urbane objekte koje građani mogu iskusiti. Značajno je da park pruža mjesto ljudima da se uključe u kvalitetno prirodno okruženje unutar metropolitanskog grada.
Priznanje
O nagradi Srebrna nagrada A' Design Award
Heito 1909 Urbani Park je pobjednik Srebrne nagrade A' Design Award, izuzetno prestižnog priznanja koje se dodjeljuje vrhunskim, veličanstvenim i impresivnim dizajnima. Srebrni pobjednici iznimno su briljantna i vrlo kreativna djela koja ilustriraju izuzetnu stručnost, talent i oštroumnost svojih dizajnera. Očekuje se da Heito 1909 Urbani Park bude divno, reprezentativno djelo koje je izuzetno profesionalno i duboko inovativno. Ovaj dizajn koji je osvojio Srebrnu nagradu A' Design Award vrlo je zapažen, nadaleko cijenjen izum koji koristi i pomjera granice umjetnosti, nauke, dizajna i tehnologije. Heito 1909 Urbani Park je kreacija kojoj se mnogi dive i zavide, koja budi želje, donosi pozitivne osjećaje i raspiruje čuđenje i divljenje.
Iza dizajna
Press komplet
Zasluge, članovi tima i tehnički detalji koje je dostavio dizajner.
- Jedinstvena svojstva
- Heito 1909 is an urban park base on an abandon factory, the ruins of factories can trace back few important era, colonists era, world II, post war industrial era. The park is a first industrial landscape, adaptive reuse project in Taiwan. The project transforms an abandoned industrial ruin into an urban recreation space, also reform industrial polluted river, into natural habitat.
- Oznake
- Taiwan, Pingtung, Landscape, Historical, Urban Design , cultural, waterfront
- Tehnologija proizvodnje
- In the excavation we use "point cloud laser scanning" for precise mapping of historical remains, point cloud produce precise data for historical documentation and precise 3D drawing. For the historical remains we build pavilions in parametric design, and use (Rhino ,Grasshopper, sketchup ,Vectorwork ) for construction drawing, it helps with create gradual sequence. And Ecotect Environment analysis for urban planning.
- Dizajnerski izazov
- The ideal of historic preserved of an industrial park, is not popular for the public and public sector. Since it's old and ugly, lack of commercial value and highly maintained. So it took a while to come out with a scheme to be acceptable. Because what's left is all underground, it's difficult to anticipate every detail before excavation, so its constant revise the design solution, and experiment different approach of construction methods.
- Istraživanje
- During the excavation we discover the project had a rich history, but it was kept secret for a century, so a lot of research needed. The variety of historical research from US Nay WW2 record, and Japan colonist archives, industrial sugar factory documents. Just to find out the function of the historical remains, the stories had happened here. The story of this place gives us design a starting point, a way to juxtapose with the city that has become, and continue the story for the future.
- Inspiracija
- During the excavation of the historical remains, stories of the place been reviled, we realize there is gaps in our history that’s being erased. Because historical building can’t be capitalized, so majority always been demolished. What was destroyed not just a building, but also multiple period of history, and that we were merely one tiny portion of this era that made this decision.
- Trajanje projekta
- The project is based in Pingtung, Taiwan. And had two phases of design and construction, first started in June 2018 finished in 2020 January, excavation and landscape infrastructure. The second are the historical site reuse, from 2020 July finished in 2021 January.
- Tok rada
- The project had an expected date to be finished, due to the uncertainty of what's underneath. It's difficult to finish in date with normal process. So it's Design and historical research while excavation, it's an overlap process constant modify the outcome.
- Članovi tima
- Lead Architect: Ju-Yii Joseph Lee, David Chen
Designer: Chen Yen Hsu, Sih-ci Yueh, Kai ting Hu, Po-Wei Wu
Interns:Xuan Yi Wang, Pin Rong Lai
Architect:Szu&Yu Design and Research Office
Researcher:Chih-Chieh Wang, Takamoto Yukikazu, Li-Yun Hsu
Consultants: J.A. Brennan Associates
Construction Management: Hsiehchang civil engineering consulting company
Site Management: Chen-Shuo Chang
General Contractor: Ping Nan Construction Co.,Ltd, Yao-Ching Construction Co.,Ltd
Steel Production: Xin Yi Sheng Steel CO.,Ltd.
Wood Supplier: Bolin Timber Structure Co.,Ltd. - Autorstvo slika
- Image #1: Yi-Hsien Lee and Associates
Image #2: Yi-Hsien Lee and Associates
Image #3: Yi-Hsien Lee and Associates
Image #4: Yi-Hsien Lee and Associates
Image #5: Yi-Hsien Lee and Associates
Sponzorisano
Istražite izvan Designers.org
Otkrijte proizvode, usluge i prilike od naših oglašivačkih partnera.
Još za istraživanje
Srodni dizajni
Istražite više nagrađenih dizajna iz iste kategorije, odabranih prema zaslugama.