Jobcenter Berlin Gedung Administrasi naébbu Elisabeth Ruthnick iyanaritu pammènangngé iya temmaka riéloinna ri 2022 A' Design Award Bessi ri Katégori Kompétisi Desain Arsitektur, Bangunan, dan Struktur.
BessiArsitektur· 2022
Jobcenter Berlin Gedung Administrasi
Pammènangngé A' Design Award Bessi ri Katégori Arsitektur
Pammènangngé Anugérah Naparessoi
Paressoi Status Anugérah untu #138576ᨉᨙᨔᨕᨗᨊᨙ
ᨄᨙᨑᨗᨖᨒ Jobcenter Berlin Gedung Administrasi
Jobcenter Berlin iyanaritu gedung administrasi ri Berlin, Jerman, iya rijadikengngi nasaba ripaleceng’i Bornemann High-rise, iyanaritu paccappurengeng balai kota ri taung 1960-an. Gedung iya matarimai daftar mabbenniki ripabbaru situru’ standar struktur, energi, sibawa pengamanang api iya makkekkuang, sibawa denah lantai’na ripasitinaja lao ri paralluang pangguna baru. Papan beton iya risessa sibawa unsur tellongeng ripabbaru situru’ desain aslinna, situru’ pasitujuang sibawa otoritas pelindungeng monumeng. Renring bata iya taniyya tarongkong ri seddéna lorong ripaddupai sibawa ripaccucii. Konsep warna baru mappimpingngi daerah umum sibawa lorong-lorong.
ᨄᨂᨑᨁᨙ
ᨄᨙᨑᨗᨖᨒ A' Design Award Bessi
Jobcenter Berlin Gedung Administrasi iyanaritu pakoro A' Design Award Bessi, pakalebbi iya malebbi iya ripabbere ri desain makessing iya mappabbura persyaratan profesional sibawa industri iya ripakkirangngi pole ri ciptaan iya makessing ripikkiri. Pakoro Bessi mappakita keterampilan malompo, spesialisasi dalleng, pemahaman ahli sibawa kapasitas kreatif tau mabbuat. Jobcenter Berlin Gedung Administrasi ripakkirangngi mancaji ciptaan iya ripakalebbi, ripuji sibawa rirennu iya praktis sibawa inovatif. Desain pakoro A' Design Award Bessi iyae mappasilaong praktik tepat industri sibawa napaitai karakteristik teknis iya kompeten iya sipulung sibawa pengetahuan sibawa bakat. Nasaba ketelitiannna, Jobcenter Berlin Gedung Administrasi mappoleang pakalebbi sibawa ripikkiri mappabbere perbaikan kualitas laleng iya ritulung mappadeceng lino mancaji tempe makessing.
ᨑᨗ ᨆᨘᨋᨗᨊᨙ ᨉᨙᨔᨕᨗ
ᨀᨗ ᨄᨙᨑᨙ
ᨀᨑᨙᨉᨗ, ᨕᨂᨚᨈ ᨈᨗᨆ ᨔᨗᨅᨓ ᨑᨗᨏᨗ ᨈᨙᨀᨊᨗ ᨊᨄᨓᨙᨑᨙ ᨑᨗ ᨉᨙᨔᨕᨗᨊᨑᨙ.
- Sipa Khas
- Conversion of the Bornemann High-rise into Jobcenter Berlin:
The extension of the town hall from the 1960s in Berlin was converted and technically as well as energetically updated to the latest technological standards. A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann. The conversion and interior renovation has created a striking example of preserving a building from the post-war modern era. - Ukurang & Kemasang
- GFA: 8,908 square meter
GBV: 33,198 cubic meter - Tag
- High-rise, Post-war modern era, Refurbishment
- Téknologi Produksi
- When renewing the washed concrete slabs, the existing light parapets and the dark opaque outer wall surfaces of the window bands were designed as smoothly cleaned surfaces, in consultation with the monument protection authority. For reasons of carrying capacity of the existing structure and economy, this intervention had to be made in the protected facade.
- Tantangeng Désain
- A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann.
- Panélitiang
- The ensemble today is a significant example of modern post-war architecture and is a listed building. The judgment of the jury in 1955 was: "The urban development in the large green area south of the old town hall is excellent."
- Inspirasi
- Taking into account the 1960s Bornemann design, SSP Rüthnick Architekten adapted the energetic upgrade of the facades, the modernization of the building technology and the fire protection, as well as the floor plan structure to the space requirements of the new users. Structurally and in terms of energy efficiency, the 50yearold building complex no longer met the current requirements and had to be extensively repaired and rebuilt for its new use as a job center and vocational information center.
- Wettu Proyék
- Realization: 2013-2018
Location: Berlin, Germany - Alur Opérasi
- The window elements, taking into account today's energy and building physics requirements, were completely renewed, according to the original model.
Inside the building, all walls made of exposed masonry remained in the hallways. They were repaired and cleaned in the course of the construction work. A new color concept is the basis of the design of public areas and corridors. - Anggota Tim
- Frank Anacker, Sylvia Wallau, Sabine Hadrossek
- Krédit Gambar
- Andreas Meichsner, Berlin
Kevin Fuchs, Berlin
Sponsori
Jélajahi Lampéi ri Designers.org
Sappai produk, layanan sibawa kasempatan polé ri mitra iklang idi.
ᨒᨕᨙᨅᨗ ᨍᨒᨍᨒᨗ
ᨉᨙᨔᨕᨗ ᨔᨗᨄᨉᨙ
ᨍᨒᨍᨒᨗ ᨒᨕᨙᨅᨗ ᨉᨙᨔᨕᨗ ᨆᨊ ᨄᨂᨑᨁ ᨄᨉ ᨀᨈᨙᨁᨚᨑᨗ ᨔᨗᨄᨉᨙ, ᨊᨄᨗᨒᨙ ᨄᨉ ᨀᨘᨕᨒᨗᨈᨔ.