Skip to content
Kwsa Kinetic nga Bungbong by Leva Engineering
Kwsa Kinetic nga Bungbong by Leva Engineering
Kwsa Kinetic nga Bungbong by Leva Engineering
Kwsa Kinetic nga Bungbong by Leva Engineering
Kwsa Kinetic nga Bungbong by Leva Engineering

Pilak Instalasyon · 2025

Kwsa Kinetic nga Bungbong

by Leva Engineering

  • A' Design Award nga Pilak 2025 in Instalasyon
  • CLIENT: Leva Engineering
  • Estimated Number of Design Views: 29,817
  • Verification code 0DC74ADF9D · Verify this award
Email this page

Colors

About Kwsa Kinetic nga Bungbong

Ang Kwsa usa ka kinetic nga instalasyon sa bungbong nga nahimutang sa Aramco Innovation Center sa Riyadh. Ang buhat naglangkob og 209 ka kwadrado metros ug gilangkuban og unom ka modular nga bungbong, ang matag usa 6000 mm ang gilapdon ug 7000 mm ang gitas-on. Ang paglihok gipatungha sa 20,000 ka stepper motors nga nagpadagan sa usa ka custom nga lead screw ug lever nga sistema nga adunay katukma nga 0.1 mm. Ang mga komponente nga hinimo sa self-lubricating nga technopolymers wala magkinahanglan og lubrikasyon ug nagtugot og pag-access gikan sa atubangan alang sa maintenance. Ang mga choreographed nga han-ay gimugna gikan sa grayscale nga video, diin ang mga bili sa kahayag mao ang nagtino sa ang-ang sa paglihok.

About the A' Design Award nga Pilak

Kwsa Kinetic nga Bungbong usa ka mananaog sa A' Design Award nga Pilak, usa ka talagsaon kaayo nga prestihiyoso nga pag-ila nga gihatag sa labing taas nga lebel, matahom, ug makadani nga mga disenyo. Ang mga mananaog sa Pilak labihan ka hayag ug mamugnaon nga mga buhat nga nagpakita sa bantogan nga kahanas, talento, ug kamatngon sa ilang mga tigdesinyo. Gilauman nga ang Kwsa Kinetic nga Bungbong mahimong talagsaon nga buhat nga ipasigarbo, dako ang pagkapropesyonal ug lawom ang kabag-ohan. Kini nga disenyo nga nakadaog og A' Design Award nga Pilak usa ka labihan ka mamatikdan, gihangaan nga imbento nga mapuslanon ug nagpalapad sa mga utlanan sa arte, siyensya, disenyo, ug teknolohiya. Kwsa Kinetic nga Bungbong usa ka paglalang nga giinggit sa daghan, nga nagpukaw og mga tinguha, nagdala og positibo nga mga pagbati, ug nagsiga sa katingala ug paghangyo.

Press Kit

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.

Related Designs

View All

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate