Hours on the Slope Funzione Primaria: Fabbrica, Edifiziu per Uffizii by T.E and C Architects Associates is a highly esteemed winner of the very prestigious 2021 A' Design Award di Bronzu in Disignu d'Architettura Competition Category.
BronzuArchitettura· 2021
Hours on the Slope Funzione Primaria: Fabbrica, Edifiziu per Uffizii
by T.E and C Architects Associates
Client: T.E and C Architects Associates
A' Design Award di Bronzu Winner in Architettura Category
Verified Award Winner
Verify Award Status for #106869The Design
About Hours on the Slope Funzione Primaria: Fabbrica, Edifiziu per Uffizii
Testu di u Libru: Hours on the Slope hè un cumplessu di fabbrica è uffizii situatu in Taichung, Taiwan. U situ hè divisu in trè edifizii dispositi secondu l'ambiente è l'orientazione. Da u latu ovest, duve l'esposizione à u sole hè più forte, finestrini scuri è una superficia di vetru ridotta rinfurzanu u sensu di vulume. U granitu è un sistema di rivestimentu verde coprenu i mura esterni. Un mosaicu di petra naturale hè statu sceltu per a superficia curva di l'edifiziu di l'uffizii. Un sistema di tubi interrati guida l'aria fresca esterna dentru à l'impiantu, mentre i pannelli solari nant'à u tettu facenu ombra à a zona di parcheghju à l'ultimu pianu.
The Recognition
About the A' Design Award di Bronzu
Hours on the Slope Funzione Primaria: Fabbrica, Edifiziu per Uffizii hè un vincitore di u premiu A' Design Award di Bronzu, una ricunniscenza assai prestigiosa attribuita à i disegni eccellenti chì si distinguenu per a creatività, l'ingegnu è l'acutezza. I vincitori di Bronzu sò artefatti largamente abili è sorprendentemente creativi chì autenticanu a vasta sperienza, l'imaginazione è l'ingegnosità di i so disegnatori. Si aspetta chì Hours on the Slope Funzione Primaria: Fabbrica, Edifiziu per Uffizii sia un oggettu assai apprezzatu, ammiratu è caru, rimarchevulemente prufessiunale è innuvatore. Stu disegnu vincitore di u premiu A' Design Award di Bronzu incorpora e migliori pratiche di l'arte, di a scienza, di u disegnu è di a tecnulugia è hè eccellente per l'attinzione à i detaglii. Hours on the Slope Funzione Primaria: Fabbrica, Edifiziu per Uffizii suddisfa splendidamente i bisogni, tocca i disideri, incanta i sentimenti è chjama a curiusità.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
- Dimensions & Packaging
- The project is 63767 square meter.
- Tags
- Architecture, Factory, Office, Plant, Building
- Production Technology
- The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
- Design Challenge
- This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
- Research
- A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
- Inspiration
- The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
- Project Duration
- The project finished in December 2018 in Taichung, Taiwan.
- Operation Flow
- The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
- Team Members
- Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang - Image Credits
- Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.