Jobcenter Berlin Edifiziu Amministrativu by Elisabeth Ruthnick is a highly esteemed winner of the very prestigious 2022 A' Design Award di Ferru in Disignu d'Architettura Competition Category.
FerruArchitettura· 2022
Jobcenter Berlin Edifiziu Amministrativu
A' Design Award di Ferru Winner in Architettura Category
Verified Award Winner
Verify Award Status for #138576The Design
About Jobcenter Berlin Edifiziu Amministrativu
U Jobcenter di Berlinu hè un edifiziu amministrativu in Berlinu, Germania, creatu trasfurmendu u Bornemann High-rise, un'estensione di i anni 1960 di u municipiu. L'edifiziu classificatu hè statu rimudernizatu secondu i standard strutturali, energetichi è di prutezzione contr'à u focu attuali, è i piani di i piani sò stati adattati à i bisogni di i novi utilizatori. E lastre di calcestruzzu lavatu è i elementi di fenestre sò stati rinuvati seguitendu u disegnu originale, d'accunsentu cù l'autorità di prutezzione di i munimenti. E muraglie in muratura vista in i corridoi sò state riparate è pulite. Un novu cuncettu di culori guida i spazii publichi è i corridoi.
The Recognition
About the A' Design Award di Ferru
Jobcenter Berlin Edifiziu Amministrativu hè un vincitore di u premiu A' Design Award di Ferru, una ricunniscenza prestigiosa attribuita à i boni disegni chì rispondenu à i requisiti prufessiunali è industriali aspettati da creazioni ben cuncipite. I vincitori di Ferru dimustranu una grande abilità, una alta specializazione, una cumpresa esperta è a capacità creativa di i so creatori. Si aspetta chì Jobcenter Berlin Edifiziu Amministrativu sia una creazione assai apprezzata, ammirata è cara chì hè pratica è innuvatrice. Stu disegnu vincitore di u premiu A' Design Award di Ferru integra e migliori pratiche di u settore è hà caratteristiche tecniche cumpetenti ligate à u sapè fà è à u talentu. Jobcenter Berlin Edifiziu Amministrativu hè rispettatu per a so meticulosità è hè cuncipitu per furnisce miglioramenti di a qualità di a vita chì aiutanu à fà di u mondu un locu megliu.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- Conversion of the Bornemann High-rise into Jobcenter Berlin:
The extension of the town hall from the 1960s in Berlin was converted and technically as well as energetically updated to the latest technological standards. A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann. The conversion and interior renovation has created a striking example of preserving a building from the post-war modern era. - Dimensions & Packaging
- GFA: 8,908 square meter
GBV: 33,198 cubic meter - Tags
- High-rise, Post-war modern era, Refurbishment
- Production Technology
- When renewing the washed concrete slabs, the existing light parapets and the dark opaque outer wall surfaces of the window bands were designed as smoothly cleaned surfaces, in consultation with the monument protection authority. For reasons of carrying capacity of the existing structure and economy, this intervention had to be made in the protected facade.
- Design Challenge
- A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann.
- Research
- The ensemble today is a significant example of modern post-war architecture and is a listed building. The judgment of the jury in 1955 was: "The urban development in the large green area south of the old town hall is excellent."
- Inspiration
- Taking into account the 1960s Bornemann design, SSP Rüthnick Architekten adapted the energetic upgrade of the facades, the modernization of the building technology and the fire protection, as well as the floor plan structure to the space requirements of the new users. Structurally and in terms of energy efficiency, the 50yearold building complex no longer met the current requirements and had to be extensively repaired and rebuilt for its new use as a job center and vocational information center.
- Project Duration
- Realization: 2013-2018
Location: Berlin, Germany - Operation Flow
- The window elements, taking into account today's energy and building physics requirements, were completely renewed, according to the original model.
Inside the building, all walls made of exposed masonry remained in the hallways. They were repaired and cleaned in the course of the construction work. A new color concept is the basis of the design of public areas and corridors. - Team Members
- Frank Anacker, Sylvia Wallau, Sabine Hadrossek
- Image Credits
- Andreas Meichsner, Berlin
Kevin Fuchs, Berlin
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.