Skip to content
Kwsa Muru Cineticu by Leva Engineering
Kwsa Muru Cineticu by Leva Engineering
Kwsa Muru Cineticu by Leva Engineering
Kwsa Muru Cineticu by Leva Engineering
Kwsa Muru Cineticu by Leva Engineering

Argentu Installazione · 2025

Kwsa Muru Cineticu

by Leva Engineering

  • A' Design Award d'Argentu 2025 in Installazione
  • CLIENT: Leva Engineering
  • Estimated Number of Design Views: 29,817
  • Verification code 0DC74ADF9D · Verify this award
Email this page

Colors

About Kwsa Muru Cineticu

Kwsa hè un'installazione di muru cineticu situata in u Centru d'Innuvazione Aramco in Riyadh. L'opera copre 209 metri quadrati è hè furmata da sei muri modulari, ognunu di 6000 mm di larghezza è 7000 mm d'altezza. U muvimentu hè pruduttu da 20 000 mutori passu-passu chì aziunanu un sistema persunalizatu di vite senza fine è di leva cù una precisione di 0,1 mm. I cumpunenti fatti di tecnopulimeri autolubrificanti ùn anu micca bisognu di lubrificazione è permettenu l'accessu frontale per a manutenzione. E sequenze coreografate sò create da video in scala di grigi, induve i valori di luminosità definiscenu u gradu di muvimentu.

About the A' Design Award d'Argentu

Kwsa Muru Cineticu hè un vincitore di u premiu A' Design Award d'Argentu, una ricunniscenza straordinariamente prestigiosa attribuita à i disegni di alta gamma, splendidi è impressiunanti. I vincitori d'Argentu sò opere tremendamente brillanti è estremamente creative chì illustranu l'espertisa, u talentu è l'acutezza eccezziunali di i so disegnatori. Si aspetta chì Kwsa Muru Cineticu sia una opera maravigliosa di mostra, rimarchevulemente prufessiunale è prufondamente innuvatrice. Stu disegnu vincitore di u premiu A' Design Award d'Argentu hè una invenzione assai nutevule è ammirata chì benefizia è allarga i limiti di l'arte, di a scienza, di u disegnu è di a tecnulugia. Kwsa Muru Cineticu hè una creazione assai invidiata chì evoca disideri, introduce sentimenti pusitivi è accende stupore è maraviglia.

Press Kit

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.

Related Designs

View All

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate