The Courtyard Ripoza Spaco by Nischal Abhaykumar is a highly esteemed winner of the very prestigious 2019 Bronza A' Design Award in Dezajno de Arkitekturo, Konstruaĵoj kaj Strukturoj Competition Category.
BronzoArkitekturo· 2019
The Courtyard Ripoza Spaco
Client: M9 Design Studio
Bronza A' Design Award Winner in Arkitekturo Category
Verified Award Winner
Verify Award Status for #76233The Design
About The Courtyard Ripoza Spaco
La Korto estas ripoza kaj eventa konstruaĵo dizajnita por komunumaj kunvenoj. La dukataĝa strukturo estas rektangula laŭplane, kun plata tegmento, ondaj metalaj muroj kaj mola ŝtala kadro. Onda polikarbonata fasado ĉirkaŭbaras la multfunkcian eventan spacon en la unua etaĝo kaj enkondukas naturan lumon en la internon. Teksturitaj kurtenoj vicas la fasadon por kontroli lumon dum spektakloj. Interne, nigre pentritaj ŝtalaj traboj, videblaj kovrilaj ŝtalplatoj de la plafono kaj plankoj el betono kaj ligno restas videblaj. Mas-produktitaj komponantoj tenis la koston malalta kaj la konstruperiodon je 75 tagoj.
The Recognition
About the Bronza A' Design Award
The Courtyard Ripoza Spaco estas gajninto de la Bronza A' Design Award, tre prestiĝa rekono donata al elstaraj dezajnoj distingitaj per kreemo, ingenieco kaj sagaco. La Bronzaj gajnintoj estas abunde lertaj kaj frape kreemaj artefaktoj, kiuj aŭtentikigas la vastan sperton, imagpovon kaj elturniĝemon de siaj dezajnistoj. Oni atendas, ke The Courtyard Ripoza Spaco estu tre estimata, admirata kaj ŝatata objekto, kiu estas rimarkinde profesia kaj nova. Ĉi tiu dezajno gajninta la Bronzan A' Design Award enkorpigas plej bonajn praktikojn en arto, scienco, dezajno kaj teknologio, kaj estas bonega pro sia atento al detaloj. The Courtyard Ripoza Spaco bonege kontentigas bezonojn, tuŝas dezirojn, ĉarmas sentojn kaj allogas scivolemon.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The aim was to create a unique building using mass-produced components – cheap price and with short execution timeline. Rectangular in plan, the two-storey building features a flat roof, corrugated metal walls and a mild steel frame. Corrugated polycarbonate sheet facade encases the multi-purpose event space on the first floor. Thin and translucent material is used to replace the regular exterior walls, where natural light can be maximised in the interior space.
- Dimensions & Packaging
- Built-up area - 3500 sqft. (New building only)
Site area - 6000 sqft. - Tags
- Adaptive re-use, modern, industrial, old and new, polycarbonate box
- Production Technology
- A steel structure made up of I-beams is on show inside the building and has been painted black. Deck sheet ceilings are left exposed, while the floors encompass a mixture of concrete and timber.
- Design Challenge
- The designated space earlier comprised of a single two-storey building along with a courtyard, set in the client’s grandparents’ house. It is almost a 50-year-old residence along with a garden café that was utilised for events. In the absence of a dedicated space for various functions, the setting of the space was informal and could not generate much revenue. In order to fill the gaps in the existing design, a new structure was introduced and made sure that it would not overpower the older one in height or by use of materials.
- Research
- Public space is and has been an integral part of communities, serves as a location for people to meet, relax and exchange ideas - refreshment of ones mind or body after work that amuses or stimulates. Informal open recreational space is that which provides opportunities for more passive recreational pursuits. It may also have a scope for informal play. Participation in recreation is regarded as being essential in contributing to people's well being.
- Inspiration
- The site previously formed part of the garden of a house occupied by the clients' grandparents. The design of the new building was intended to minimise its impact on this existing house, both during and after its construction. A desire to maintain a connection with the existing house informed the decision to keepas much of the existing garden area as possible, and to position the entrance to the new building so it opens onto this space.
- Project Duration
- The building was completed in June 2018 and the duration of construction was 75 days.
- Operation Flow
- The inside of this polycarbonate sheet facade is lined by rich textured drapes to control the amount of natural light inside during specific shows and events. Windows are made from the same material as the walls, so they don't offer any additional light but can be opened to let fresh air into the building. At night, lights glowing from within transform the building into a huge light-box along the streetscape.
- Team Members
- Nischal Abhaykumar
Jesal Pathak
Preethi B Raju
Karamveer Singh - Image Credits
- Shamanth Patil Photography
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.