The Design

About Heito 1909 Kaupunkipuisto

Tällä aikakaudella rakennuksia ja tontteja on purettu ja uusittu jatkuvasti, jokainen projekti on vähän "Tabula Rasaa". Heiton transformaatio 1909 on harvinainen mukautuvan uudelleenkäytön projekti. Sen sijaan, että olisi pakkomielle ikonisiin rakennuksiin, kaikki puistossa on suunniteltu nurinpäin raunioiden jatkeeksi. Ainutlaatuinen muotoilu yhdistää rauniot ja vaurioituneet rakenteet luovasti kaupunkitiloihin, joita kansalaiset voivat kokea. Merkittävää on, että puisto tarjoaa ihmisille paikan laadukkaaseen luonnonympäristöön suurkaupunkikaupungissa.

The Recognition

About the Hopeapalkinto A' Design Award

Heito 1909 Kaupunkipuisto on Hopeapalkinnon A' Design Award -voittaja, äärimmäisen arvostettu tunnustus, joka myönnetään huippuluokan, upeille ja vaikuttaville designeille. Hopeavoittajat ovat äärimmäisen loistavia ja erittäin luovia teoksia, jotka havainnollistavat suunnittelijoidensa erinomaista asiantuntemusta, lahjakkuutta ja terävyyttä. Heito 1909 Kaupunkipuisto:n odotetaan olevan ihana, esimerkillinen teos, joka on huomattavan ammattimainen ja syvästi innovatiivinen. Tämä Hopeapalkinnon A' Design Award -voittajadesign on erittäin merkittävä, ihailtu keksintö, joka hyödyttää taiteen, tieteen, designin ja teknologian rajojen laajentamista. Heito 1909 Kaupunkipuisto on laajalti kadehdittu luomus, joka herättää haluja, tuo myönteisiä tunteita ja sytyttää hämmästystä ja ihmetystä.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
Heito 1909 is an urban park base on an abandon factory, the ruins of factories can trace back few important era, colonists era, world II, post war industrial era. The park is a first industrial landscape, adaptive reuse project in Taiwan. The project transforms an abandoned industrial ruin into an urban recreation space, also reform industrial polluted river, into natural habitat.
Tags
Taiwan, Pingtung, Landscape, Historical, Urban Design , cultural, waterfront
Production Technology
In the excavation we use "point cloud laser scanning" for precise mapping of historical remains, point cloud produce precise data for historical documentation and precise 3D drawing. For the historical remains we build pavilions in parametric design, and use (Rhino ,Grasshopper, sketchup ,Vectorwork ) for construction drawing, it helps with create gradual sequence. And Ecotect Environment analysis for urban planning.
Design Challenge
The ideal of historic preserved of an industrial park, is not popular for the public and public sector. Since it's old and ugly, lack of commercial value and highly maintained. So it took a while to come out with a scheme to be acceptable. Because what's left is all underground, it's difficult to anticipate every detail before excavation, so its constant revise the design solution, and experiment different approach of construction methods.
Research
During the excavation we discover the project had a rich history, but it was kept secret for a century, so a lot of research needed. The variety of historical research from US Nay WW2 record, and Japan colonist archives, industrial sugar factory documents. Just to find out the function of the historical remains, the stories had happened here. The story of this place gives us design a starting point, a way to juxtapose with the city that has become, and continue the story for the future.
Inspiration
During the excavation of the historical remains, stories of the place been reviled, we realize there is gaps in our history that’s being erased. Because historical building can’t be capitalized, so majority always been demolished. What was destroyed not just a building, but also multiple period of history, and that we were merely one tiny portion of this era that made this decision.
Project Duration
The project is based in Pingtung, Taiwan. And had two phases of design and construction, first started in June 2018 finished in 2020 January, excavation and landscape infrastructure. The second are the historical site reuse, from 2020 July finished in 2021 January.
Operation Flow
The project had an expected date to be finished, due to the uncertainty of what's underneath. It's difficult to finish in date with normal process. So it's Design and historical research while excavation, it's an overlap process constant modify the outcome.
Team Members
Lead Architect: Ju-Yii Joseph Lee, David Chen
Designer: Chen Yen Hsu, Sih-ci Yueh, Kai ting Hu, Po-Wei Wu
Interns:Xuan Yi Wang, Pin Rong Lai
Architect:Szu&Yu Design and Research Office
Researcher:Chih-Chieh Wang, Takamoto Yukikazu, Li-Yun Hsu
Consultants: J.A. Brennan Associates
Construction Management: Hsiehchang civil engineering consulting company
Site Management: Chen-Shuo Chang
General Contractor: Ping Nan Construction Co.,Ltd, Yao-Ching Construction Co.,Ltd
Steel Production: Xin Yi Sheng Steel CO.,Ltd.
Wood Supplier: Bolin Timber Structure Co.,Ltd.
Image Credits
Image #1: Yi-Hsien Lee and Associates
Image #2: Yi-Hsien Lee and Associates
Image #3: Yi-Hsien Lee and Associates
Image #4: Yi-Hsien Lee and Associates
Image #5: Yi-Hsien Lee and Associates

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate