Tobb Technopark Campus Parque Tecnolóxico by A Tasarim Architect is a highly esteemed winner of the very prestigious 2026 A' Design Award de Prata in Deseño de Construción e Proxectos Inmobiliarios Competition Category.
PrataInmobiliario· 2026
Tobb Technopark Campus Parque Tecnolóxico
Client: A Tasarim Mimarlik
A' Design Award de Prata Winner in Inmobiliario Category
- 12,210
- Verified Award Winner
- Verify Award Status for #182161
The Design
About Tobb Technopark Campus Parque Tecnolóxico
O Campus do Tecnoparque Tobb é un complexo de investigación e desenvolvemento situado dentro do Campus Tobb Etu en Ancara. O deseño consta de dous bloques unidos por un atrio central a nivel de planta baixa e a través dos niveis do soto. Os laboratorios, os obradoiros, o aparcadoiro e os espazos técnicos ocupan os niveis do soto, mentres que as plantas superiores albergan áreas flexibles de investigación e desenvolvemento. Cinco entradas situadas en diferentes niveis dan acceso a través do terreo en pendente. A distribución abre os espazos de traballo cara á luz natural e ao parque urbano adxacente, favorecendo a interacción e o intercambio de coñecemento.
The Recognition
About the A' Design Award de Prata
Tobb Technopark Campus Parque Tecnolóxico gañou o A' Design Award de Prata, un recoñecemento enormemente prestixioso outorgado a deseños de gama alta, fermosos e impresionantes. Os gañadores Prata son obras tremendamente brillantes e sumamente creativas que ilustran a pericia, o talento e a agudeza sobresaíntes dos seus deseñadores. Espérase que Tobb Technopark Campus Parque Tecnolóxico sexa unha obra marabillosa, escaparate de oficio, notablemente profesional e profundamente innovadora. Este deseño gañador do A' Design Award de Prata é unha invención moi notable e admirada que beneficia e fai avanzar os límites da arte, a ciencia, o deseño e a tecnoloxía. Tobb Technopark Campus Parque Tecnolóxico é unha creación moi envexada que esperta desexos, achega sentimentos positivos e prende asombro e marabilla.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The project is conceived as an integrated and adaptive system that supports continuous knowledge production, innovation and collaboration. It is defined by a clear and rational spatial organization, flexibility for future expansion, and a strong emphasis on sustainability and user-oriented functionality. The design balances technical efficiency with spatial quality, creating an environment that encourages creativity, interaction and high-performance research and development activities. Through its adaptable structure and efficient planning approach, the project responds to evolving technological needs while maintaining a cohesive and accessible architectural identity.
- Dimensions & Packaging
- The Tobb Etu Technopark is developed on a 30,000 sqm site and consists of two basement levels, a ground floor accessible from three different elevations, and six upper floors. The project is organized into two main blocks, Block A and Block B, which are interconnected through a central atrium at ground level and through the basement levels. Each block has a typical floor plate of approximately 4,000 sqm, resulting in a total gross construction area of 120,000 sqm. The basement levels accommodate laboratories, workshops, parking and technical spaces, with a clear height of 6.00 meters, while the upper floors dedicated to R&D functions have a floor height of 4.20 meters.
- Tags
- Research and Development, Technopark, Innovation, Courtyard, Landscape, Office, Laboratory, Campus
- Production Technology
- During the design of the Tobb Etu Technopark, comprehensive site analyses were conducted, taking into account topography, elevation differences, surrounding transportation networks, and pedestrian and vehicular circulation. A continuous ring road was introduced within the campus to provide access to all façades for both vehicles and pedestrians, while multiple entry points were defined at different levels to ensure seamless connectivity. Five main entrances were strategically positioned to facilitate clear and efficient access to the building. Vertical circulation systems were designed to enable the movement of users, materials, and service functions across all floors. The project establishes a strong relationship with the adjacent 30 Agustos City Park, allowing direct access from ground-level spaces and orienting work environments toward the landscape.
- Design Challenge
- The primary challenge of the design process was to achieve a coherent integration between a large-scale, high-density technopark program and the site’s complex physical and contextual conditions. The project required balancing advanced technological infrastructure with environmental sensitivity, while responding to significant topographical variations and multi-level access requirements.
Internally, the challenge involved aligning the evolving needs of research, innovation and flexible work environments with the academic and social character of the university campus. Externally, zoning regulations, laboratory requirements, construction constraints and multidisciplinary coordination played a critical role in shaping the design decisions. Addressing these conditions required an iterative and research-driven approach, combining spatial flexibility, efficient circulation strategies and sustainable design principles to create an adaptable and future-oriented environment. - Research
- This study presents the design and development process of the Tobb Etu Technopark, a 120,000 sqm science and technology facility located within the Tobb Etu Campus in Ankara. Conceived as a nature-integrated innovation environment, the project establishes a continuous relationship between the built form and the adjacent 30 Agustos City Park, promoting user well-being, creativity, and a collaborative research culture.
Comprehensive site analyses, including topography, multi-level access strategies, and pedestrian–vehicular circulation, informed the spatial organization. The development consists of two interconnected blocks structured around a central atrium, with flexible floor plates designed to accommodate R&D centers, laboratories, and workshops. High-clearance basement levels support technical and laboratory functions, while vertically integrated circulation systems enable efficient movement of people, materials, and services.
The study demonstrates how integrated planning, environmental sensitivity, and infrastructural flexibility can collectively support continuous knowledge production and innovation within contemporary technopark design. - Inspiration
- The inspiration behind the design is the idea of creating a technology-focused environment integrated with nature. The project aims to establish a balanced and continuous relationship between the built environment and the natural landscape. Natural light, green spaces and open areas are considered integral components of the design, fostering an atmosphere that enhances creativity, productivity and interaction. The design follows a holistic approach that addresses both technological advancement and environmental sensitivity, encouraging innovation through a strong connection between users, space and nature.
- Project Duration
- The project, with a total construction area of 120,000 sqm on a 30,000 sqm site, is located within the Tobb Etu Campus in Yenimahalle, Ankara. The design process commenced on 21 February 2025 and was completed on 9 September 2025.
- Operation Flow
- The project was developed through an intensive and collaborative design process involving a multidisciplinary team of approximately 50 professionals, including consultants. The spatial organization supports clear and efficient circulation, enabling smooth interaction between different functional areas. The layout promotes accessibility, connectivity and user engagement, allowing seamless movement across the building while encouraging collaboration and knowledge exchange.
- Team Members
- Architect : Ali Osman Ozturk,
Civil Engineer : Ibrahim Ozturk
Mechanical Enginner : Hakan Filinte
Electrical Engineer : Ezgi Ozkan Durmuslar
Landscape Architect : Elif Akay
Infrastructure : Murat Pekdagli
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.