Tsallaka zuwa abun ciki
Kwsa Bangon Motsi daga Leva Engineering

Zane Kwsa Bangon Motsi daga Leva Engineering mai nasara ne mai daraja sosai na 2025 Kyautar A' Design Award ta Azurfa a Rukunin Gasar Shigarwa.


AzurfaShigarwa· 2025

Kwsa Bangon Motsi

daga Leva Engineering

Abokin Ciniki: Leva Engineering

Mai Nasarar Kyautar A' Design Award ta Azurfa a Rukunin Shigarwa

30,958

Mai Nasara da Aka Tabbatar

Tabbatar da Matsayin Kyauta na #172468

Launuka

Ƙirar

Game da Kwsa Bangon Motsi

Kwsa wani shigi ne na bangon motsi wanda ke a Cibiyar Kirkire-kirkire ta Aramco a Riyadh. Aikin ya rufe murabba'in mita 209 kuma an gina shi da bangaye guda shida na tsarin moduli, kowanne yana da fadin milimita 6000 da tsayin milimita 7000. Ana samar da motsi ta hanyar stepper motors guda 20,000 wadanda ke tafiyar da tsarin lead screw da lever na musamman tare da daidaito na milimita 0.1. Sassan da aka yi da technopolymers masu shafa kansu ba sa bukatar mai kuma suna ba da damar shiga ta gaba don gyara. Ana kirkiro jerin motsi da aka tsara daga bidiyon grayscale, inda darajojin haske ke ayyana matakin motsi.

Amincewa

Game da Kyautar A' Design Award ta Azurfa

Zanen Kwsa Bangon Motsi ya lashe Kyautar A' Design Award ta Azurfa, wata karramawa mai tsananin daraja da ake bai wa zane-zane na matakin koli, masu kyau sosai kuma masu burgewa. Waɗanda suka lashe kyautar Azurfa ayyuka ne masu haske sosai da ƙirƙira mai yawa waɗanda ke nuna ƙwarewa, baiwa da kaifin tunanin masu zanensu. Ana sa ran zanen Kwsa Bangon Motsi ya zama aiki mai ban mamaki, abin koyi, mai ƙwarewa sosai kuma mai ƙirƙire-ƙirƙire mai zurfi. Wannan zane da ya lashe Kyautar A' Design Award ta Azurfa ƙirƙira ce mai abin lura sosai, da ake sha'awa, wacce ke amfanar da kuma kai iyakokin fasaha, kimiyya, zane da fasahar zamani gaba. Zanen Kwsa Bangon Motsi ƙirƙira ce da ake yi wa hassada sosai wacce ke tada sha'awa, tana kawo jin daɗi kuma tana haifar da mamaki da al'ajabi.

Bayan Ƙirar

Kayan Manema Labarai

Bayanin ƙungiyar, membobinta da cikakkun bayanai na fasaha da mai ƙirar ya bayar.

Siffofi Na Musamman
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Girma da Fakitin
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Kalmomin Alama
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Fasahar Samarwa
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Ƙalubalen Zane
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Bincike
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Wahayi
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Tsawon Lokacin Aikin
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Tsarin Aiki
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
Mambobin Ƙungiya
Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology

Tallafi

Bincika Bayan Designers.org

Gano kayayyaki, ayyuka da damammaki daga abokan tallafin mu.

Zane-Zane Masu Kyau Sun Cancanci Babban Yabo

A' Design Award lambar yabo ce ta duniya, wadda alkalai ke tantancewa don zane-zane masu kyau. Ku shiga A' Design Award don samun damar samun yabo na cancantar, suna, daraja da tallata ayyukanku. Ku gabatar da aikinku don A' Design Award ku yi fafatawa don samun kyautar A' Design Prize mai daraja.

Gabatarwa