Zane Kwsa Bangon Motsi daga Leva Engineering mai nasara ne mai daraja sosai na 2025 Kyautar A' Design Award ta Azurfa a Rukunin Gasar Shigarwa.
AzurfaShigarwa· 2025
Kwsa Bangon Motsi
daga Leva Engineering
Abokin Ciniki: Leva Engineering
Mai Nasarar Kyautar A' Design Award ta Azurfa a Rukunin Shigarwa
Mai Nasara da Aka Tabbatar
Tabbatar da Matsayin Kyauta na #172468Ƙirar
Game da Kwsa Bangon Motsi
Kwsa wani shigi ne na bangon motsi wanda ke a Cibiyar Kirkire-kirkire ta Aramco a Riyadh. Aikin ya rufe murabba'in mita 209 kuma an gina shi da bangaye guda shida na tsarin moduli, kowanne yana da fadin milimita 6000 da tsayin milimita 7000. Ana samar da motsi ta hanyar stepper motors guda 20,000 wadanda ke tafiyar da tsarin lead screw da lever na musamman tare da daidaito na milimita 0.1. Sassan da aka yi da technopolymers masu shafa kansu ba sa bukatar mai kuma suna ba da damar shiga ta gaba don gyara. Ana kirkiro jerin motsi da aka tsara daga bidiyon grayscale, inda darajojin haske ke ayyana matakin motsi.
Amincewa
Game da Kyautar A' Design Award ta Azurfa
Zanen Kwsa Bangon Motsi ya lashe Kyautar A' Design Award ta Azurfa, wata karramawa mai tsananin daraja da ake bai wa zane-zane na matakin koli, masu kyau sosai kuma masu burgewa. Waɗanda suka lashe kyautar Azurfa ayyuka ne masu haske sosai da ƙirƙira mai yawa waɗanda ke nuna ƙwarewa, baiwa da kaifin tunanin masu zanensu. Ana sa ran zanen Kwsa Bangon Motsi ya zama aiki mai ban mamaki, abin koyi, mai ƙwarewa sosai kuma mai ƙirƙire-ƙirƙire mai zurfi. Wannan zane da ya lashe Kyautar A' Design Award ta Azurfa ƙirƙira ce mai abin lura sosai, da ake sha'awa, wacce ke amfanar da kuma kai iyakokin fasaha, kimiyya, zane da fasahar zamani gaba. Zanen Kwsa Bangon Motsi ƙirƙira ce da ake yi wa hassada sosai wacce ke tada sha'awa, tana kawo jin daɗi kuma tana haifar da mamaki da al'ajabi.
Bayan Ƙirar
Kayan Manema Labarai
Bayanin ƙungiyar, membobinta da cikakkun bayanai na fasaha da mai ƙirar ya bayar.
- Siffofi Na Musamman
- Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
- Girma da Fakitin
- Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required. - Kalmomin Alama
- Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
- Fasahar Samarwa
- The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
- Ƙalubalen Zane
- A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
- Bincike
- This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
- Wahayi
- The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
- Tsawon Lokacin Aikin
- The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024. - Tsarin Aiki
- The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
- Mambobin Ƙungiya
- Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology
Tallafi
Bincika Bayan Designers.org
Gano kayayyaki, ayyuka da damammaki daga abokan tallafin mu.
Ƙarin Abubuwan Bincike
Ƙirare Masu Alaƙa
Bincika ƙarin ƙirare masu lashe kyauta daga wannan rukunin, waɗanda aka zaɓa bisa cancanta.