Skip to content
Crossing Walls Tsev Nyob, Chaw Ua Haujlwm by Satoshi Fujinaka

Crossing Walls Tsev Nyob, Chaw Ua Haujlwm by Satoshi Fujinaka is a highly esteemed winner of the very prestigious 2026 A' Design Award Tooj in Tsim Vaj Tsev, Tsev thiab Qauv Tsev Competition Category.


ToojVaj Tsev· 2026

Crossing Walls Tsev Nyob, Chaw Ua Haujlwm

by Satoshi Fujinaka

Client: Daijiro Yoshihara

A' Design Award Tooj Winner in Vaj Tsev Category

7,667

Verified Award Winner

Verify Award Status for #174571

Colors

The Design

About Crossing Walls Tsev Nyob, Chaw Ua Haujlwm

Crossing Walls yog ib lub tsev uas muab chaw ua haujlwm nyob sab hauv qab los ua ke nrog lub tsev nyob rau sab saum toj. Peb daim phab ntsa uas zoo li tus niam ntawv L sib cais thiab sib txuas ua ke, thiab ib lub duab plaub fab raug muab faib tawm los tsim cov chaw qhib thiab cov chaw kaw. Cov phab ntsa muaj kev sib raug zoo tsim nyog nrog ib puag ncig, cia qhov kaj thiab cua nkag tau los tab sis tseem ceev tau kev nyob ntiag tug. Cov qhov rais raug npaj qhov chaw kom tswj tau tshav ntuj, cov kub thiab kev pom sab nraud. Ib qho chaw qhib mus rau saum ntuj txuas sab hauv nrog sab nraud. Lub tsev raws li txoj kev ua tsev ntoo ib txwm ua raws li Nyij Pooj rau ntawm daim phiaj 910 millimeter, uas txuag tau khoom siv thiab muab tso tseg kom pom tseeb.

The Recognition

About the A' Design Award Tooj

Crossing Walls Tsev Nyob, Chaw Ua Haujlwm yog tus yeej ntawm A' Design Award Tooj, ib qho kev lees paub muaj meej mom heev uas muab rau cov qauv tsim tshwj xeeb uas txawv los ntawm kev tsim tshiab, kev txawj tsim thiab kev ntse. Cov neeg yeej Tooj yog cov khoom muaj txuj ci heev thiab tsim tshiab heev uas ua pov thawj txog kev paub ntau, kev xav thiab kev txawj ua ntawm cov kws tsim qauv. Crossing Walls Tsev Nyob, Chaw Ua Haujlwm xav tias yuav yog ib qho khoom uas neeg hwm, qhuas thiab hlub, uas tshaj lij heev thiab tsim tshiab. Cov qauv tsim yeej A' Design Award Tooj no siv cov kev coj ua zoo tshaj plaws ntawm kev kos duab, kev tshawb fawb, kev tsim qauv thiab thev naus laus zis thiab zoo heev vim nws saib xyuas cov ntsiab lus. Crossing Walls Tsev Nyob, Chaw Ua Haujlwm ua tau raws li cov kev xav tau zoo kawg, kov cov kev xav, ntxias cov kev xav thiab txhawb kev xav paub.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
We will try to solve the problem by manipulating the wall so that the office on the first floor and the life on the second floor, communication and privacy, can be compatible with each other.
The cube is disassembled and the three L shaped walls separate and intertwine with each other.
These three L shaped walls manipulate the open and closed spaces and maintain a moderate relationship with their surroundings.
Light and wind enter the building and begin to vaguely connect it to the outside.
Dimensions & Packaging
wooden Site area 176.34㎡ Total Floor area 138.37㎡ The wooden portion of the building was constructed with a 910mm x 910mm grid of pillar and beam pitches using Japanese conventional construction methods, which made the structural plan easy to understand, and also made cost and construction management easier to understand.
Tags
House , Oficce , Japan , Walls , Wood
Production Technology
The building uses a standard Japanese wooden structure with a span of 910 mm.
Most building materials in Japan follow this module, resulting in significant material and energy savings.
The wooden structure is shown in a cosmetic manner to pursue beauty and rationality.
Design Challenge
While keeping the space needed by the client within a limited area and budget,
While considering the position of sunlight and adjusting the position of windows to control the heat load,
The window arrangement is planned to control the external line of sight and to create an ambiguous connection with the outside.
Research
The research for this project is divided into two themes.
The first is a study of how to maximize the natural environment and required space on a limited site area.
The second is to consider total cost management and cost management of each material within a limited budget.
How to solve these two themes in architecture is both an interesting and difficult challenge.
Inspiration
The planned site is a borderline location where new places and old places mix.
By opening the walls to the outside, the office tried to create appropriate and diverse relationships to maintain the community and revitalize the city.
The living space blends with the exterior space through the gaps in the walls while ensuring privacy and bringing light into the interior.
And by creating a void to the sky, the entire building breathes and releases its spirit to the sky.
Project Duration
Design began in Hiroshima in 2022 and construction was completed in December 2024.
Operation Flow
This building was planned as a boundary between the newly developed environment in the newly rezoned area and the old shopping area, where the old and the new mix.
The project was planned to solve the problem of how to realize an architecture that allows people to feel close to nature while ensuring privacy, while reducing the environmental burden caused by recent climate change and improving the comfort performance of the building itself in such a location.
Team Members
Satoshi Fujinaka
Image Credits
Photo , Kenji Masunaga

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

The A' Design Award is an international, juried accolade for good design. Take part in the A' Design Award to get an opportunity to earn meritocratic recognition, gain fame, prestige and publicity for your work. Nominate your work for the A' Design Award and compete for the coveted A' Design Prize.

Nominate