The Courtyard Rekreacijski prostor by Nischal Abhaykumar is a highly esteemed winner of the very prestigious 2019 Brončana nagrada A' Design Award in Dizajn Arhitekture, Zgrada i Konstrukcija Competition Category.
BroncaArhitektura· 2019
The Courtyard Rekreacijski prostor
Client: M9 Design Studio
Brončana nagrada A' Design Award Winner in Arhitektura Category
Verified Award Winner
Verify Award Status for #76233The Design
About The Courtyard Rekreacijski prostor
Dvorište je rekreacijska i event zgrada namijenjena okupljanjima zajednice. Dvokatna građevina pravokutnog je tlocrta, s ravnim krovom, valovitim metalnim zidovima i konstrukcijom od blago legiranog čelika. Fasada od valovitog polikarbonata zatvara višenamjenski prostor za događanja na prvom katu i unosi prirodno svjetlo u unutrašnjost. Teksturirani zastori postavljeni su duž fasade radi kontrole svjetlosti tijekom priredbi. U unutrašnjosti su vidljivi crno obojeni čelični nosači, stropovi od izloženih limenih ploča te podovi od betona i drva. Serijski proizvedeni elementi omogućili su nisku cijenu izgradnje i rok izvedbe od svega 75 dana.
The Recognition
About the Brončana nagrada A' Design Award
The Courtyard Rekreacijski prostor je pobjednik Brončane nagrade A' Design Award, visoko prestižnog priznanja koje se dodjeljuje izvanrednim dizajnima što se odlikuju kreativnošću, domišljatošću i oštroumnošću. Brončani pobjednici izdašno su vješti i upečatljivo kreativni artefakti koji potvrđuju golemo iskustvo, maštu i snalažljivost svojih dizajnera. Očekuje se da The Courtyard Rekreacijski prostor bude visoko cijenjen, voljen i njegovan predmet koji je izuzetno profesionalan i inovativan. Ovaj dizajn koji je osvojio Brončanu nagradu A' Design Award uključuje najbolje prakse u umjetnosti, znanosti, dizajnu i tehnologiji i izvrstan je zbog pažnje posvećene detaljima. The Courtyard Rekreacijski prostor sjajno zadovoljava potrebe, dotiče želje, očarava osjećaje i privlači znatiželju.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The aim was to create a unique building using mass-produced components – cheap price and with short execution timeline. Rectangular in plan, the two-storey building features a flat roof, corrugated metal walls and a mild steel frame. Corrugated polycarbonate sheet facade encases the multi-purpose event space on the first floor. Thin and translucent material is used to replace the regular exterior walls, where natural light can be maximised in the interior space.
- Dimensions & Packaging
- Built-up area - 3500 sqft. (New building only)
Site area - 6000 sqft. - Tags
- Adaptive re-use, modern, industrial, old and new, polycarbonate box
- Production Technology
- A steel structure made up of I-beams is on show inside the building and has been painted black. Deck sheet ceilings are left exposed, while the floors encompass a mixture of concrete and timber.
- Design Challenge
- The designated space earlier comprised of a single two-storey building along with a courtyard, set in the client’s grandparents’ house. It is almost a 50-year-old residence along with a garden café that was utilised for events. In the absence of a dedicated space for various functions, the setting of the space was informal and could not generate much revenue. In order to fill the gaps in the existing design, a new structure was introduced and made sure that it would not overpower the older one in height or by use of materials.
- Research
- Public space is and has been an integral part of communities, serves as a location for people to meet, relax and exchange ideas - refreshment of ones mind or body after work that amuses or stimulates. Informal open recreational space is that which provides opportunities for more passive recreational pursuits. It may also have a scope for informal play. Participation in recreation is regarded as being essential in contributing to people's well being.
- Inspiration
- The site previously formed part of the garden of a house occupied by the clients' grandparents. The design of the new building was intended to minimise its impact on this existing house, both during and after its construction. A desire to maintain a connection with the existing house informed the decision to keepas much of the existing garden area as possible, and to position the entrance to the new building so it opens onto this space.
- Project Duration
- The building was completed in June 2018 and the duration of construction was 75 days.
- Operation Flow
- The inside of this polycarbonate sheet facade is lined by rich textured drapes to control the amount of natural light inside during specific shows and events. Windows are made from the same material as the walls, so they don't offer any additional light but can be opened to let fresh air into the building. At night, lights glowing from within transform the building into a huge light-box along the streetscape.
- Team Members
- Nischal Abhaykumar
Jesal Pathak
Preethi B Raju
Karamveer Singh - Image Credits
- Shamanth Patil Photography
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.