QMC Hospital Sant Tretman Jounalye by Adrian Light is a highly esteemed winner of the very prestigious 2020 A' Design Award Fè in Achitekti Competition Category.
FèAchitekti· 2020
QMC Hospital Sant Tretman Jounalye
by Adrian Light
Client: ONE20 Group Architects
A' Design Award Fè Winner in Achitekti Category
- 10,726
- Verified Award Winner
- Verify Award Status for #103631
The Design
About QMC Hospital Sant Tretman Jounalye
Lopital QMC se yon sant tretman jounalye ki sitiye sou campus Queens Medical Centre nan Nottingham, Wayòm Ini. Bilding lan gen 15 depatman, ki gen ladan yo inite dyagnostik ak sal operasyon, sou de etaj operasyonèl ki fè 9,500 mèt kare. Plan an ranje toutotou yon atriyòm santral, ki pote limyè natirèl nan enteryè a epi ki sipòte yon wo nivo dirabilite. Zòn sikilasyon yo antoure ak vè klè. Yon etid apwofondi sou espas konsiltasyon yo te fè bilding lan vin apeprè 20 pousan pi piti pase sa kritè estanda yo ta egzije.
The Recognition
About the A' Design Award Fè
QMC Hospital Sant Tretman Jounalye se yon ganyan A' Design Award Fè, yon rekonesans ki gen prestij yo bay bon design ki satisfè egzijans pwofesyonèl ak endistriyèl yo atann de kreyasyon ki byen fèt. Ganyan Fè yo montre gwo konpetans, espesyalizasyon wo, konpreyansyon ekspè ak kapasite kreyatif kreyatè yo. Yo atann QMC Hospital Sant Tretman Jounalye pou se yon kreyasyon anpil moun estime, admire e renmen ki pratik e inovatè. Design sa a ki ganyen A' Design Award Fè entegre pi bon pratik sektè a e li gen karakteristik teknik konpetan ki lye ak konnesans pratik ak talan. Yo respekte QMC Hospital Sant Tretman Jounalye pou jèntan li e li fèt pou bay amelyorasyon kalite lavi ki ede fè mond lan vin yon pi bon kote.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- Nottingham NHS DayTreatment Centre (NDTC) is part of a UK government initiative to provide modern state of
the art facilities equipped with the latest technology.
medical treatment and outpatient consultation rooms.
Including diagnostics and theatre suites there are 15 departments integrated into this building all providing day care facilities and treatment. By relocating these departments the hospital was able to free bed space for longer term care. This was opened as the largest Independent Sector Treatment Centre in Britain. - Dimensions & Packaging
- Key facts are:-
185,000 patients per annum
9,500 sq m over two operational floors
6 years from inception to opening including all bidding stages
1,000 NHS staff on secondment from QMC
Saving features to achieve energy targets of N55 gj/100cu m/annum - Tags
- Hospital,, Architecture, Sustainability, Hospital Design, NHS, Treatment Centre
- Production Technology
- The building is composed from modern building materials. The circulation areas are celebrated with clear glass. The tunnel connecting the new building to the old is a metal tube with slits that create a rythym of light as you walk along. Another level of research investigated how to provide additional teatments and reduce waiting times.
- Design Challenge
- The site was an old established hospital campus. The new building had to fit within the overall precinct, but also be a distinct element. Public art was an integral part of the brief. ONE20 established separate Art and Landscape budgets. This ensured that these elements were not lost during construction. The art was procured through design competition. The planning of the building was integral to ensuring a more efficient healthcare process. The design of treatment areas meant waiting times have been reduced and more patients have been seen than in a traditionally planned hospital.
- Research
- It is now becoming better accepted that natural light can play an important role in speeding up the recovery of patients. The decision was taken to maximise the access to natural light for all patients in the hospital; not an easy thing in a building with such a large footprint.
- Inspiration
- ONE20 designed this building around the atrium which acts as a focus for all activities and also to deliver high levels of sustainability. By looking creatively at the use of consultation space and agreeing strategy options with the consultant teams, the net building is around 20% smaller than one using standard NHS criteria.
- Project Duration
- The project is located on the campus of the Queens Medical Centre in Nottingham UK Work commenced in 2006 and has bees modified over the past 15 years. The latest work being concluded in 2019
- Operation Flow
- This is largest independent treatment centre in Britain. The Nottingham Day Treatment Centre is operated for the NHS providing high quality day case procedures. Secretary of State for Health Andrew Lansley, stated "It is providing a good care to patients on the basis of NHS principles. It made a profit of £4 million in the six-month period to 30 June 2013, up from £2.5 million. In 2016, Circle's teledermatology service was awarded a "Clinician’s Choice Award" by private healthcare industry group Hpci Media in the Building Better Healthcare Awards
- Team Members
- Adrian Light
Roger Walker
Tony Kidman
Rachel Dann
Denise Filbery
Claire Walker
Jerome Healy - Image Credits
- Photographer - Adrian Light
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.