Tianliao Estasyon Ponpye by Suiadr

Tianliao Estasyon Ponpye by Suiadr is a highly esteemed winner of the very prestigious 2021 A' Design Award Fè in Achitekti Competition Category.


FèAchitekti· 2021

Tianliao Estasyon Ponpye

by Suiadr

Client: The Institute of Architectural Design and Research, Shenzhen University

A' Design Award Fè Winner in Achitekti Category

Colors

Email this page

The Design

About Tianliao Estasyon Ponpye

Tianliao se yon estasyon ponpye ki nan Distri Guangming, Shenzhen, Lachin. Bilding lan swiv yon plan santralize epi li konbine yon bilding biwo twa etaj ak yon tou antrènman sèt etaj. Sifas total planche a se 5,039.5 mèt kare, ladan yo 3,985 mèt kare anlè tè a, epi rapò sifas planche a se 0.97. Nivo planche entèn nan leve pi wo pase wout minisipal la pou anpeche dlo lapli antre. Zòn ouvè yo mete sou etaj ki pi ba yo, konsa antrènman chak jou pa jennen. Gen jaden ki enstale nan plizyè kote sou sit la.

The Recognition

About the A' Design Award Fè

Tianliao Estasyon Ponpye se yon ganyan A' Design Award Fè, yon rekonesans ki gen prestij yo bay bon design ki satisfè egzijans pwofesyonèl ak endistriyèl yo atann de kreyasyon ki byen fèt. Ganyan Fè yo montre gwo konpetans, espesyalizasyon wo, konpreyansyon ekspè ak kapasite kreyatif kreyatè yo. Yo atann Tianliao Estasyon Ponpye pou se yon kreyasyon anpil moun estime, admire e renmen ki pratik e inovatè. Design sa a ki ganyen A' Design Award Fè entegre pi bon pratik sektè a e li gen karakteristik teknik konpetan ki lye ak konnesans pratik ak talan. Yo respekte Tianliao Estasyon Ponpye pou jèntan li e li fèt pou bay amelyorasyon kalite lavi ki ede fè mond lan vin yon pi bon kote.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
It's a new fire station with a centralized layout. The vertical design makes the station almost as tall as the Huanguang Road. The internal elevation of the station is higher than that of the municipal road, preventing rainwater from flowing into the inside. The layout meets the requirements of setback, sunshine and fire prevention, etc. The pedestrian entrance and exit are at the southwest side. The open areas are mainly at 1F and the mezzanine, making no influence on firemen's daily training.
Dimensions & Packaging
Its gross floor area is 5,039.5 sqm with 3,985 sqm above the ground. It has a 3-story office building and a 7-story training tower. The floor area ratio is 0.97. The exterior windows adopt LOW-E energy-efficient glass and thermal mortar. The roofing is paved with 50mm extruded polystyrene boards for thermal insulation. The septic tank and oil separator tank adopt integrated equipment like glass steel. The energy-saving water heating system uses solar power and air force heat pump.
Tags
Fire station, centralized layout, standardization, setback, multi-layer public building, infrastructure, The Institute of Architectural Design and Research, Shenzhen University, Z&Z STUDIO
Production Technology
1. The exterior windows adopt LOW-E energy-efficient glass and thermal mortar. The roofing is paved with 50mm extruded polystyrene boards for thermal insulation.
2. The project mainly uses reinforced concrete frame structure and the base adopts independent column-shaped and bar-shaped waterproof slabs. The roof uses cast-in-situ reinforced concrete slab system with main and secondary beams. Secondary beams are set properly to reduce the plane size of slab avoiding too much material waste.
Design Challenge
Building setback: Due to the limited land, it was possible to set back building in accordance with the official requirements. After several times of negotiation with the planning bureau, the design team reached a reasonable bargain: the plot is set back 2.3m on the east, 6.05m on the south, 2.3m on the west and 1.8m on the north. In this way, the fire station and sports fields were reasonably arranged within the limited land.
Research
The design must follow the research results of "the 2014 Shenzhen Fire Station Standardization Design Workshop". It shall establish the construction standards of Shenzhen fire stations. The experience of it can also provide reference for domestic fire stations. The design should satisfy basic needs, consider the possibility of the profession development, and embody the considerations of openness and cultural promotion of fire control. It has won a second prize awarded by SUIADR in 2020.
Inspiration
Located in Guangming District, Shenzhen, the project occupies the land of 4,099.16 m2, with the planned Huanguang Road on the west, the planned Nantian Road on the north, Nangen Road on the south and Mobi Antenna Technology (Shenzhen) Co., Ltd. on the east. As a first-class fire house, its gross floor area is 5,039.5 m2 with 3,985 m2 above the ground and 1,054.5 m2 underground. It consists of a three-story office building and a seven-story training tower.
Project Duration
Starting time: November 10, 2016
Completion time : July 20, 2020
Location: Guangming District, Shenzhen
Operation Flow
The parking garage for fire trucks faces the street. The visiting entrance and exit is at the southwest side of the plot. The open areas are at 1F and 2F, the foyer and canteen at 1F. Firemen's preparation rooms are on 2F with a bathroom and a shower room on the west. 3F houses offices and auxiliary rooms and the basement has an emergency storeroom and equipment room. Gardens are set at many places, enriching firemen’s life.
Team Members
Zhong Zhong, Zhong Botao, Wang Min, Zhong Haihuan、Zeng Yusheng、Su Xiaoyue、Deng Rixing
Liu Mu、Yong Yong、An Huijuan、Zhou Jie、Cao Jiying、Xiong Feng、He Xiaoming、Wang Wei
Ye Zhien、Wu Zhirong
Image Credits
Tian Tengfei

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate