Ajan Achitekti · 2021
Imatra GIS Fonksyon Prensipal: Sou-estasyon Elektrik
by Virkkunen and Co Architects
- A' Design Award Ajan 2021 in Achitekti
- CLIENT: Virkkunen & Co Architects
- Estimated Number of Design Views: 22,224
- Verification code DBFD899149 · Verify this award
Colors
About Imatra GIS Fonksyon Prensipal: Sou-estasyon Elektrik
Imatra GIS se yon sou-estasyon elektrik ki chita nan peyizaj rapid Imatrankoski nan Lès Fenlann. Pwojè a gen ladan yon bilding sou-estasyon ak senk pilòn ak tèminal elektrik. Bilding lan gen yon ramkad an beton ak fasad doub-po. Kouch deyò a fèt ak brik long ki fèt alamen ki poze nan yon pwofil zig-zag epi ki sipòte pa yon ramkad an asye. Estrikti transmisyon yo fèt ak pwofil an asye soude twa-fas. Konsepsyon an dekonpoze aspè kontèks bati a epi rasanble eleman yo nan yon nouvo fòm abstrè, an ekilib ak peyizaj ki antoure a.
About the A' Design Award Ajan
Imatra GIS Fonksyon Prensipal: Sou-estasyon Elektrik se yon ganyan A' Design Award Ajan, yon rekonesans ki gen yon prestij enmans yo bay design nivo siperyè, bèl anpil e enpresyonan. Ganyan Ajan yo se travay ki trè briyan e ki trè kreyatif ki montre ekspètiz, talan ak finès designer yo. Yo atann Imatra GIS Fonksyon Prensipal: Sou-estasyon Elektrik pou se yon bèl travay modèl, remakab nan pwofesyonalis e ki gen gwo inovasyon. Design sa a ki ganyen A' Design Award Ajan se yon envansyon trè remakab, admire ki pote benefis e ki pouse limit atizay, syans, design ak teknoloji. Imatra GIS Fonksyon Prensipal: Sou-estasyon Elektrik se yon kreyasyon anpil moun jalou ki reveye dezi, ki pote santiman pozitif e ki limen sipriz ak mèvèy.
Press Kit
- Unique Properties
- The project is composed of an electricity substation building and an array of five designer power pylons and terminals, set in the national landscape of Imatrankoski rapids in Eastern Finland. The new structures were designed to be in balance with the surrounding landscape. Their design breaks apart aspects of the built context and reassembles them in a new abstracted form. A combination of hand-made and industrial materials and structures is used to achieve this.
- Dimensions & Packaging
- The substation building floor area: 965 sqm. Length x width x height of the building 44,1 m x 13,2 m x 8,1 m.
- Tags
- infrastructure, architecture, landscape, electricity substation, transmission, power line, brick, concrete, steel
- Production Technology
- The substation building has a concrete frame and double-skin facades. The outermost facade layer consists of hand-made long bricks laid in a zig-zag profile. The brick cladding is supported by a steel frame fixed to the inner concrete facades. The concrete structure consists of pre-fabricated and in-situ parts. The transmission structures are made of triangular welded steel profiles. They consist of workshop-made, coated pre-fabricated sections assembled and erected on the site without welding.
- Design Challenge
- The main challenge was architectural rather than technical, due to the qualities of the surrounding landscape and the history of the area. Visual and structural coherence of the distinct parts and general sensitivity to the context were methods for overcoming this challenge. We arrived at the final design through a process of elimination. Dozens of prototype 3D models were evaluated for impact in a detailed and accurate site model based on an extensive point-cloud data set of the area.
- Research
- We used site visits and literature sources for determining visual and historical factors that would most influence and serve the design. Literature about the history of the landscape, tourism, architecture, and industry in the area was used. The finding that had the most impact on the design was based on the analysis of the external architecture of the old hydropower plant: the rhythm of the facade openings, and the materials used in the buildings.
- Inspiration
- The beautiful landscape and the historical significance of the area were the primary sources of inspiration for us. The existing, impressive industrial architecture of the context was another major factor in the design. The guiding principle has been that the new structures should form a clearly defined new historical layer. They would also have to be timeless and combine harmoniously with the context. We sought to further elevate the beauty of the site.
- Project Duration
- Project completed: 2020
Location: Imatra, Finland - Operation Flow
- Imatra electricity substation and the transmission structures are not fenced off from the surroundings and they can be approached freely. The substation is an unmanned facility that is mainly remote-controlled from a central control room located off-site. It is visited regularly for inspection and maintenance purposes by trained personnel. In the main process equipment room, the users control the switchgear equipment on a workstation designed for this purpose.
- Image Credits
- Image #1: Photographer Tuomas Kivinen, 2020.
Image #2: Photographer Tuomas Kivinen, 2021.
Image #3: Photographer Tuomas Kivinen, 2020.
Image #4: Photographer Tuomas Kivinen, 2021.
Image #5: Photographer Tuomas Kivinen, 2021.