Natatorium of Southeast University Pisin Kouvri by Zhou Qi Studio is a highly esteemed winner of the very prestigious 2024 A' Design Award Ajan in Achitekti Competition Category.
AjanAchitekti· 2024
Natatorium of Southeast University Pisin Kouvri
Client: Zhou Qi Studio
A' Design Award Ajan Winner in Achitekti Category
Verified Award Winner
Verify Award Status for #152509The Design
About Natatorium of Southeast University Pisin Kouvri
Natatorium Inivèsite Southeast la se yon pisin kouvri ki te bati pou yon kanpis inivèsite nan Nanjing, Lachin. Bilding lan bay yon espas pou naje ak antrènman, avèk yon pisin estanda 20 pa 50 mèt, sal pou chanje rad nan etaj anba a, epi yon jimnazyòm ak sal klas anwo. Yon seri ach an beton koule sou plas fòme mi yo ak twati a kòm yon sèl antye, ki repete nan sèt travé koube. Beton an rete toutouni pou montre estrikti a ak materyèl la, epi po eksteryè a kouvri ak kawo teracota wouj ki pandye sou sistèm sèk. Gwo zòn vitre konekte enteryè a ak kanpis la deyò.
The Recognition
About the A' Design Award Ajan
Natatorium of Southeast University Pisin Kouvri se yon ganyan A' Design Award Ajan, yon rekonesans ki gen yon prestij enmans yo bay design nivo siperyè, bèl anpil e enpresyonan. Ganyan Ajan yo se travay ki trè briyan e ki trè kreyatif ki montre ekspètiz, talan ak finès designer yo. Yo atann Natatorium of Southeast University Pisin Kouvri pou se yon bèl travay modèl, remakab nan pwofesyonalis e ki gen gwo inovasyon. Design sa a ki ganyen A' Design Award Ajan se yon envansyon trè remakab, admire ki pote benefis e ki pouse limit atizay, syans, design ak teknoloji. Natatorium of Southeast University Pisin Kouvri se yon kreyasyon anpil moun jalou ki reveye dezi, ki pote santiman pozitif e ki limen sipriz ak mèvèy.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The Natatorium of Southeast University is located near the east gate of the Jiulonghu Campus. It is the first indoor swimming pool in the history of Southeast University. The design uses continuous circular arches to break the body into pieces, to eliminate the sense of alienation of the volume. The arc of the building is like a flower, woven together in 7 repeating forms, which makes it look lively. The building does not have a so-called "top roof", its roof and wall as a whole.
- Dimensions & Packaging
- Land Area: 6892 square meters;
Gross Built Area: 5650 square meters;
Building Height: 10.5 meters, Width: 39 meters, Length: 91 meters;
Floors Above: 2 floors, Below: 1 - Tags
- Swimming, Fitness, Recreation, Concrete, Arch, Tile, Structure, Tectonic
- Production Technology
- Construction Method: Cast-in-place concrete, Dry-hanging terra-cotta tiles;
Performance Testing: Mechanical structure test, Material strength test, Daylighting simulation, Acoustic simulation;
Design Software: AutoCAD, Rhinoceros, Sketchup, Photoshop, V-Ray, D5 Render. - Design Challenge
- The main problems of the natatorium are span and humidity. Using concrete arches can well meet its structural requirements and concrete does not fear water. The concrete surface is free of paint and decorations, to present the most authentic state of the structure and materials. The skin of the building is dry-hung with red terracotta tiles, which are sustainable and can be replaced for 150 years. All the materials show their natural colors, so the structure is the building, and the building is the structure itself.
- Research
- In the process of construction, the natatorium used cast-in-place concrete, which requires much manual prefabrication of formwork. The scaffolding covered the whole site, which was more than 10 meters high and covered an area of 120*40 meters. Casting curved arches in mid-air is an anti-trend, anti-industrial architectural behavior. Each concrete arch meets a point when it falls to the ground and the excess is "sheared" off to form a natural arch bottom, which cannot be accomplished through assembly.
- Inspiration
- The space of the natatorium is made up of multiple curved surfaces, forming a sense of rhythm. Fluid water, moving people and static building, gray concrete and blue water, sunlight refracted by louvers and shadows formed by geometry, all of which stimulate a strong sense of place. The arch structure of concrete is in line with the mechanical requirements, and the facade uses a large area of glazing, which forms an interaction between behaviors and sights of the people inside and outside.
- Project Duration
- Year of Design: 2018;
Start of Construction: 2019.4;
End of Construction: 2022.10;
Location: Jiulonghu Campus, Southeast University, Nanjing, China - Operation Flow
- The main function of the Natatorium of Southeast University is to provide the campus with a fitness venue for swimming and training. The plane is rectangular, the swimming pool is a standard size of 20*50 meters, and the water circulation equipment and machinery are set underground. The internal space of the natatorium is organized in the manner of a regular gymnasium, with a changing room and swimming pool on the ground floor and a gym and classrooms on the second floor.
- Patents
- Copyrights belong to Architects & Engineers Co., Ltd of Southeast University-Zhou Qi Studio, 2023.
- Team Members
- Chief Architect: ZHOU Qi
Architect: YANG Jun, YANG Wenjun, HU Die, FU Xiuzhang
Others: GUO Yangbo, LI Xiang, ZHANG Benlin, MA Zhihu, ZANG Chuanguo - Image Credits
- Image #01: Zhou Qi Studio, Exterior Arches, 2023.
Image #02: Zhou Qi Studio, Exterior Elevation, 2023.
Image #03: Zhou Qi Studio, Interior Elevation, 2023.
Image #04: Zhou Qi Studio, Interior Space, 2023.
Image #05: Zhou Qi Studio, Aerial Context, 2023.
Video: Zhou Qi Studio, Natatorium of Southeast University, 2023.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.