HK Port Passenger Clearance Building Fasilitas Lintas Batas by Aedas is a highly esteemed winner of the very prestigious 2020 A' Design Award Platinum in Desain Arsitektur, Bangunan dan Struktur Competition Category.
PlatinumArsitektur· 2020
HK Port Passenger Clearance Building Fasilitas Lintas Batas
by Aedas
Client: Highways Department of HKSAR
A' Design Award Platinum Winner in Arsitektur Category
Verified Award Winner
Verify Award Status for #102048The Design
About HK Port Passenger Clearance Building Fasilitas Lintas Batas
Gedung Pemeriksaan Penumpang Pelabuhan Hong Kong merupakan fasilitas lintas batas untuk Jembatan Hong Kong-Zhuhai-Makau, sebuah penyeberangan laut yang menghubungkan Hong Kong dengan Zhuhai dan Makau. Bangunan ini berfungsi sebagai simpul transportasi sekaligus menyediakan layanan pemeriksaan bagi penumpang dan barang. Atap berbentuk gelombang sepanjang 310 meter dan selebar 162 meter menaungi bangunan tersebut. Atap ini terbuat dari konstruksi baja dan terbagi menjadi bentang-bentang struktural yang ditopang oleh lengan dengan rentang 36 kali 18 meter. Unit-unit atap modular difabrikasi terlebih dahulu di luar lokasi demi efisiensi konstruksi. Bangunan ini berdiri di atas pulau hasil reklamasi.
The Recognition
About the A' Design Award Platinum
HK Port Passenger Clearance Building Fasilitas Lintas Batas adalah pemenang A' Design Award Platinum, pengakuan yang sangat bergengsi yang diberikan kepada desain yang benar-benar luar biasa, elegan, dan megah. Pemenang Platinum adalah keajaiban kreasi, bukti batas-batas kreativitas intelektual, dan menunjukkan profesionalisme tiada tanding serta kejeniusan para desainernya. Desain-desain ini diharapkan menjadi karya paling terkenal yang mendefinisikan estetika suatu era, berkontribusi pada kesejahteraan masyarakat, dan memajukan batas-batas seni, sains, desain, dan teknologi. HK Port Passenger Clearance Building Fasilitas Lintas Batas menampilkan tingkat keunggulan yang melampaui batas dan tanpa ragu menjadikan dunia tempat yang lebih baik dengan karakteristiknya yang menguntungkan dan berharga. HK Port Passenger Clearance Building Fasilitas Lintas Batas adalah karya pemenang A' Design Award Platinum yang membangkitkan keinginan, menginspirasi, membuat bersemangat, menyenangkan, dan memercikkan kegembiraan yang besar.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The Hong Kong-Zhuhai-Macao Bridge is a large sea-crossing linking Hong Kong with Zhuhai City and Macao. The Passenger Clearance Building (PCB) serve as a transportation hub to provide clearance facilities for goods and passengers respectively using the bridge. The objective of the HKBCF is to create a new landmark building that reflects Hong Kong as a vibrant global and metropolitan city, and a gateway of Hong Kong to serve for the western part of Pearl River Delta via HZMB.
- Dimensions & Packaging
- The building is sheltered by a 310 metre long, 162 metre wide wave-form roof; the structure of which is composed of steel-work with the building zoned into a series of structured bays, supported by a casting system with arms that hold up the structure and span 36m by 18m.
- Tags
- AedasArchitects, RSH+P, Architecture, ArchitectureinHK, Transport, Bridge, Infrastructure, Pre-fabrication, Iconicroof, HongKong
- Inspiration
- The PCB is constantly filled with movement with people arriving and departing by buses, cars and taxis. It serve as a gateway for all those passing through it, providing Hong Kong with a new ‘front door’ celebrating travel and surrounded by water with views to a natural skyline of evergreen mountains and hills. The elegant modular roof form ideally lends itself to offsite pre-fabrication and has enabled an efficient construction process achieving a very high level of quality.
- Project Duration
- The PCB is located on an artificial island of approximately 150 hectares. It is reclaimed from the open waters off the northeast of the Hong Kong International Airport (HKIA). The PCB is geographically located at a convenient location with good air / road / rail / sea transportation connectivity. The project commenced in December 2010 and was opened in October 2018.
- Team Members
- Aedas and Rogers Stirk Harbour + Partners as JV Designer
Keith Griffiths (Aedas), Max Connop (Aedas) and Richard Paul (Rogers Stirk Harbour + Partners) - Image Credits
- Image #1: Aedas
Image #2: Aedas
Image #3: Aedas
Image #4: Aedas
Image #5: Aedas
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.