Skip to content
Kwsa Dinding Kinetik by Leva Engineering

Kwsa Dinding Kinetik by Leva Engineering is a highly esteemed winner of the very prestigious 2025 A' Design Award Perak in Desain Instalasi Competition Category.


PerakInstalasi· 2025

Kwsa Dinding Kinetik

by Leva Engineering

Client: Leva Engineering

A' Design Award Perak Winner in Instalasi Category

Colors

The Design

About Kwsa Dinding Kinetik

Kwsa adalah instalasi dinding kinetik yang berlokasi di Aramco Innovation Center di Riyadh. Karya ini mencakup area seluas 209 meter persegi dan terbentuk dari enam dinding modular, masing-masing selebar 6000 mm dan setinggi 7000 mm. Gerakan dihasilkan oleh 20.000 motor stepper yang menggerakkan sistem ulir penggerak dan tuas khusus dengan presisi 0,1 mm. Komponen yang terbuat dari teknopolimer swapelumas tidak memerlukan pelumasan dan memungkinkan akses dari sisi depan untuk perawatan. Rangkaian gerak terkoreografi diciptakan dari video skala abu-abu, di mana nilai kecerahan menentukan derajat pergerakan.

The Recognition

About the A' Design Award Perak

Kwsa Dinding Kinetik adalah pemenang A' Design Award Perak, pengakuan yang sangat bergengsi yang diberikan kepada desain kelas atas yang indah dan mengesankan. Pemenang Perak adalah karya yang sangat cemerlang dan sangat kreatif yang menggambarkan keahlian, bakat, dan ketajaman luar biasa para desainernya. Kwsa Dinding Kinetik diharapkan menjadi karya yang menakjubkan, etalase keahlian, sangat profesional, dan sangat inovatif. Desain pemenang A' Design Award Perak ini adalah penemuan yang sangat menonjol dan dikagumi yang bermanfaat bagi dan memajukan batas-batas seni, sains, desain, dan teknologi. Kwsa Dinding Kinetik adalah kreasi yang sangat dicemburui yang membangkitkan keinginan, membawa perasaan positif, dan memercikkan keheranan dan kekaguman.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
Team Members
Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

The A' Design Award is an international, juried accolade for good design. Take part in the A' Design Award to get an opportunity to earn meritocratic recognition, gain fame, prestige and publicity for your work. Nominate your work for the A' Design Award and compete for the coveted A' Design Prize.

Nominate