About Skyboat Ụlọ Kọfị, Ebe Nlere Anya
Skyboat bụ ụlọ nwere okpukpu abụọ e wuru n'elu olulu miri emi nke dị mita 613 na Leye, China. E debere ọnụ ụlọ ndị ọbịa nke họtel na ala ala ụlọ ahụ, ụlọ kọfị na okpukpu nke mbụ, na ebe nlere anya n'elu ụlọ ahụ. Ebe nlere anya ahụ gụnyere ala enyo a na-agafe n'elu ya nke ha mita 10 site na mita 12.5. Ụlọ a gafere ụzọ warara dị n'elu olulu ahụ ma na-agbatịpụ mita 34 na mita 22 n'akụkụ ọ bụla nke ugwu ahụ. Ebe ịdị arọ ya dị ala na-eme ka ụlọ ahụ nwee ike ịkwụsi ike n'onwe ya. Naanị ihe nkwado ise ka e ji mee ihe, nke na-ebelata mmebi na ahịhịa ndị dị n'ógbè ahụ.
About the Ihe Nrite A' Design Award nke Ọlaedo
Skyboat Ụlọ Kọfị, Ebe Nlere Anya meriri A' Design Award nke Ọlaedo, nnabata dị oke ugwu e nyere design ndị dị n'ọkwa mbụ, dị ịtụnanya ma pụtara ìhè. Ndị meriri na Ọlaedo bụ ihe e kere eke dị oke ọhụrụ, nwere ọhụụ ma na-egbu maramara nke na-egosipụta ọgụgụ isi, amamihe na nka nke ndị designer ha. A na-atụ anya na Skyboat Ụlọ Kọfị, Ebe Nlere Anya ga-abụ ihe e mepụtara kacha enweta otuto, na-edu ọnọdụ ma bụrụ ihe ncheta nke na-enye uru na-adịbeghị mgbe ọ bụla. Design a meriri A' Design Award nke Ọlaedo bụ ọrụ dị ebube, a na-asọpụrụ nke na-erite uru buru ibu ma na-ebuga oke nka, sayensị, design na teknụzụ n'ihu. Skyboat Ụlọ Kọfị, Ebe Nlere Anya na-eweta mmetụta ọchịchọ siri ike, na-akpali agụụ, na-akwado nzụlite ihe ma na-adọrọ anyị adọrọ.
Press Kit
- Unique Properties
- The structure cantilevers 36m over the 613m deep sinkhole. The top of the sinkhole is extremely narrow which can only accommodate a small passageway. Skyboat is proposed to span over the passageway and cantilever out to each side of the mountain ridge. Similar to the tumbler toys, it is proposed to lower the structure centre of gravity and utilize the minimum area (10metres by 30metres), in which way, the self-balance of the structure is therefore achieved.
- Dimensions & Packaging
- two-storey building consisting of hotel rooms at the ground floor, a café at the first floor and a roof viewing platform which contains a 10metre-by-12.5metre walk-on glass floor. The building comprises a construction area of 495m2 and covers a plan dimension of 10metres by 80metres. Both ends of the building cantilevers out by 34metres and 22metres respectively. The total steel weight used is 438 tonne.
- Tags
- Skyboat, XinY, Glass floor, Cantilever, Leye, Dashiwei
- Production Technology
- There are only five supports proposed. This minimizes the damages to the local vegetation.
To protect the local plants and rivers, hanging falsework was used during the construction stage and to have the structural members installed by pieces. - Design Challenge
- The structure cantilevers 36m over the 613m deep sinkhole. The top of the sinkhole(the site)is extremely narrow which can only accommodate a small passageway.
A long crack at the site indicates the site is not stable. Apart from grouting the existing crack, it is also proposed to have the key struts at each ends of the building inclining towards the ridge, the horizontal component forces from which then provided the embracing forces to the ridge and hence improved the stability of the site. - Research
- The structural system and component arrangements were adapted to the force distribution, perfectly aligned with the elegant architectural geometry.
By increasing the key strut lengths, the pre-cambering of the front cantilever structure is then achieved, which can compensate the deflections under the dead loads and some of the live loads. This also protects the glazings from large deformations. - Inspiration
- A big goose, a e tumbler toy.
The long crack at the top of the ridge indicates the site is not stable. Apart from grouting the existing crack, it is also proposed to have the key struts at each ends of the building inclining towards the ridge, the horizontal component forces from which then provided the embracing forces to the ridge and hence improved the stability of the site. - Project Duration
- The project started on 2018 in Leye China and finished on 2019.
- Operation Flow
- Visitors can enjoy coffee in the beauty of nature, or they can walk on the glass floor above the 600-meter deep pit to experience the shock of their heartbeats.
- Image Credits
- Image#1: Photographer Li Jin, Yongheng,2019.
Image#2: Photographer Yongheng, Yongheng,2019.
Image#3: Photographer Yongheng, Yongheng,2019.
Image#4: Photographer Xin Yuan, XinY,2019.
Image#5: Photographer Yongheng, Yongheng,2019.
Video Credits: Yongheng