Jobcenter Berlin Ụlọ Nchịkọta Ọrụ by Elisabeth Ruthnick is a highly esteemed winner of the very prestigious 2022 Ihe Nrite A' Design Award nke Igwe in Nhazi Ụlọ Owu, Ụlọ na Ihe Owuwu Competition Category.
IgweỤlọ Owu· 2022
Jobcenter Berlin Ụlọ Nchịkọta Ọrụ
Ihe Nrite A' Design Award nke Igwe Winner in Ụlọ Owu Category
Verified Award Winner
Verify Award Status for #138576The Design
About Jobcenter Berlin Ụlọ Nchịkọta Ọrụ
Jobcenter Berlin bụ ụlọ nchịkọta ọrụ dị na Berlin, Germany, nke e mepụtara site n'ịgbanwe Bornemann High-rise, nke bụ ntinye agbakwunyere n'ụlọ ọrụ obodo n'afọ 1960s. E mezigharịrị ụlọ ndị a depụtara aha ya ka o zute ụkpụrụ ọrụ owuwu, ike na nchekwa ọkụ nke oge a, e wepụtakwara atụmatụ ala ka o dabara mkpa ndị ọhụrụ na-eji ụlọ ahụ. E mezigharịrị mbadamba kọnkịrit e sachara na akụkụ windo dịka atụmatụ mbụ si dị, site n'nkwekọrịta na ụlọ ọrụ nlekọta ihe ncheta. E mezigharịkwara ma sachaa mgbidi kpọmkwem nke a na-ahụ anya n'ụzọ ime ụlọ. Atụmatụ agba ọhụrụ na-eduzi ebe mmadụ niile na-abanye na ụzọ ime ụlọ.
The Recognition
About the Ihe Nrite A' Design Award nke Igwe
Jobcenter Berlin Ụlọ Nchịkọta Ọrụ meriri A' Design Award nke Igwe, nnabata dị ugwu e nyere design ndị dị mma nke na-emezu ihe ndị a chọrọ n'ọrụ na ụlọ ọrụ nke a na-atụ anya n'ihe e kere eke ndị e mere nke ọma. Ndị meriri na Igwe na-egosi nka buru ibu, ọkachamara dị elu, nghọta ọkachamara na ikike imepụta nke ndị kere ha. A na-atụ anya na Jobcenter Berlin Ụlọ Nchịkọta Ọrụ ga-abụ ihe e kere eke a na-asọpụrụ nke ukwuu, a na-eto na a hụrụ n'anya nke bụ ihe bara uru ma dị ọhụrụ. Design a meriri A' Design Award nke Igwe na-ejikọta ụzọ kacha mma nke ụlọ ọrụ ma nwee àgwà teknụzụ kwesịrị ekwesị jikọtara na ihe ọmụma na talent. A na-asọpụrụ Jobcenter Berlin Ụlọ Nchịkọta Ọrụ maka nlezianya ya ma e mere ya ka ọ nye mmeziwanye ndụ nke na-enyere aka ime ka ụwa bụrụ ebe ka mma.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- Conversion of the Bornemann High-rise into Jobcenter Berlin:
The extension of the town hall from the 1960s in Berlin was converted and technically as well as energetically updated to the latest technological standards. A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann. The conversion and interior renovation has created a striking example of preserving a building from the post-war modern era. - Dimensions & Packaging
- GFA: 8,908 square meter
GBV: 33,198 cubic meter - Tags
- High-rise, Post-war modern era, Refurbishment
- Production Technology
- When renewing the washed concrete slabs, the existing light parapets and the dark opaque outer wall surfaces of the window bands were designed as smoothly cleaned surfaces, in consultation with the monument protection authority. For reasons of carrying capacity of the existing structure and economy, this intervention had to be made in the protected facade.
- Design Challenge
- A special influence on the plans for the transformation of the listed ensemble was the preservation of the draft character of Fritz Bornemann.
- Research
- The ensemble today is a significant example of modern post-war architecture and is a listed building. The judgment of the jury in 1955 was: "The urban development in the large green area south of the old town hall is excellent."
- Inspiration
- Taking into account the 1960s Bornemann design, SSP Rüthnick Architekten adapted the energetic upgrade of the facades, the modernization of the building technology and the fire protection, as well as the floor plan structure to the space requirements of the new users. Structurally and in terms of energy efficiency, the 50yearold building complex no longer met the current requirements and had to be extensively repaired and rebuilt for its new use as a job center and vocational information center.
- Project Duration
- Realization: 2013-2018
Location: Berlin, Germany - Operation Flow
- The window elements, taking into account today's energy and building physics requirements, were completely renewed, according to the original model.
Inside the building, all walls made of exposed masonry remained in the hallways. They were repaired and cleaned in the course of the construction work. A new color concept is the basis of the design of public areas and corridors. - Team Members
- Frank Anacker, Sylvia Wallau, Sabine Hadrossek
- Image Credits
- Andreas Meichsner, Berlin
Kevin Fuchs, Berlin
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.