Skip to content
Kwsa Mgbidi Kinetic by Leva Engineering
Kwsa Mgbidi Kinetic by Leva Engineering
Kwsa Mgbidi Kinetic by Leva Engineering
Kwsa Mgbidi Kinetic by Leva Engineering
Kwsa Mgbidi Kinetic by Leva Engineering

Ọlaọcha Nkwụnye · 2025

Kwsa Mgbidi Kinetic

by Leva Engineering

  • Ihe Nrite A' Design Award nke Ọlaọcha 2025 in Nkwụnye
  • CLIENT: Leva Engineering
  • Estimated Number of Design Views: 29,817
  • Verification code 0DC74ADF9D · Verify this award
Email this page

Colors

About Kwsa Mgbidi Kinetic

Kwsa bụ ihe arụnyere mgbidi kinetic nke dị na Aramco Innovation Center na Riyadh. Ọrụ a kpuchiri 209 square mita ma bụrụ nke e mebere site na mgbidi modular isii, nke ọ bụla dị 6000 mm n'obosara na 7000 mm n'ịdị elu. A na-emepụta mmegharị site na stepper motors 20,000 nke na-akwalite usoro lead screw na lever ahaziri ahazi nwere izi ezi nke 0.1 mm. Akụrụngwa e mere site na technopolymers na-ete onwe ha mmanụ adịghị achọ mmanụ ma na-enye ohere ịbanye n'ihu maka nlekọta. A na-emepụta usoro mmegharị ndị a haziri ahazi site na vidiyo grayscale, ebe ụkpụrụ ìhè na-akọwapụta ogo mmegharị ahụ.

About the Ihe Nrite A' Design Award nke Ọlaọcha

Kwsa Mgbidi Kinetic meriri A' Design Award nke Ọlaọcha, nnabata dị oke ugwu e nyere design ndị dị n'ọkwa kachasị elu, mara mma ma na-eju anya. Ndị meriri na Ọlaọcha bụ ọrụ na-egbu maramara nke ukwuu ma dị oke nzụlite nke na-egosi ọmarịcha ihe ọmụma, talent na nghọta nke ndị designer ha. A na-atụ anya na Kwsa Mgbidi Kinetic ga-abụ ọrụ dị ịtụnanya, ihe nlereanya, nke dị oke ọrụ ma dị omimi n'ihe ọhụrụ. Design a meriri A' Design Award nke Ọlaọcha bụ ihe e mepụtara dị oke ịrịba ama, nke a na-eto nke na-erite uru ma na-ebuga oke nka, sayensị, design na teknụzụ n'ihu. Kwsa Mgbidi Kinetic bụ ihe e kere eke ọtụtụ ndị na-ekwo ekworo ya nke na-akpali ọchịchọ, na-eweta mmetụta ọma ma na-akpali ịtụnanya.

Press Kit

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.

Related Designs

View All

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate