QMC Hospital Dagmeðferðarmiðstöð by Adrian Light is a highly esteemed winner of the very prestigious 2020 A' Design Award í járni in Arkitektúr, bygginga- og mannvirkjahönnun Competition Category.
JárnArkitektúr· 2020
QMC Hospital Dagmeðferðarmiðstöð
by Adrian Light
Client: ONE20 Group Architects
A' Design Award í járni Winner in Arkitektúr Category
Verified Award Winner
Verify Award Status for #103631The Design
About QMC Hospital Dagmeðferðarmiðstöð
QMC-sjúkrahúsið er dagmeðferðarmiðstöð staðsett á háskólasvæði Queens Medical Centre í Nottingham í Bretlandi. Byggingin hýsir 15 deildir, þar á meðal greiningar- og skurðstofur, á tveimur starfrækslu hæðum sem samtals eru 9.500 fermetrar að stærð. Skipulagið er byggt í kringum miðlægan atríumgarð sem hleypir náttúrulegri birtu inn í innviðina og stuðlar að háu sjálfbærnistigi. Umferðarsvæði eru afmörkuð með tæru gleri. Vandleg rannsókn á viðtalsrýmum gerði bygginguna um 20 prósentum minni en staðlaðar kröfur myndu að öðrum kosti krefjast.
The Recognition
About the A' Design Award í járni
QMC Hospital Dagmeðferðarmiðstöð vann A' Design Award í járni, virta viðurkenningu sem veitt er góðum hönnunarverkum sem uppfylla þær faglegu og iðnaðarlegu kröfur sem gerðar eru til vel hannaðra sköpunarverka. Sigurvegarar í járni sýna mikla færni, mikla sérhæfingu, sérfræðiskilning og skapandi getu höfunda sinna. Þess er vænst að QMC Hospital Dagmeðferðarmiðstöð sé mjög metið, dáð og elskað sköpunarverk sem er hagnýtt og nýstárlegt. Þetta hönnunarverk sem vann A' Design Award í járni sameinar bestu starfsvenjur greinarinnar og hefur hæfa tæknilega eiginleika tengda þekkingu og hæfileikum. QMC Hospital Dagmeðferðarmiðstöð er virt fyrir nákvæmni sína og er hannað til að veita lífsgæðabætur sem hjálpa til við að gera heiminn að betri stað.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- Nottingham NHS DayTreatment Centre (NDTC) is part of a UK government initiative to provide modern state of
the art facilities equipped with the latest technology.
medical treatment and outpatient consultation rooms.
Including diagnostics and theatre suites there are 15 departments integrated into this building all providing day care facilities and treatment. By relocating these departments the hospital was able to free bed space for longer term care. This was opened as the largest Independent Sector Treatment Centre in Britain. - Dimensions & Packaging
- Key facts are:-
185,000 patients per annum
9,500 sq m over two operational floors
6 years from inception to opening including all bidding stages
1,000 NHS staff on secondment from QMC
Saving features to achieve energy targets of N55 gj/100cu m/annum - Tags
- Hospital,, Architecture, Sustainability, Hospital Design, NHS, Treatment Centre
- Production Technology
- The building is composed from modern building materials. The circulation areas are celebrated with clear glass. The tunnel connecting the new building to the old is a metal tube with slits that create a rythym of light as you walk along. Another level of research investigated how to provide additional teatments and reduce waiting times.
- Design Challenge
- The site was an old established hospital campus. The new building had to fit within the overall precinct, but also be a distinct element. Public art was an integral part of the brief. ONE20 established separate Art and Landscape budgets. This ensured that these elements were not lost during construction. The art was procured through design competition. The planning of the building was integral to ensuring a more efficient healthcare process. The design of treatment areas meant waiting times have been reduced and more patients have been seen than in a traditionally planned hospital.
- Research
- It is now becoming better accepted that natural light can play an important role in speeding up the recovery of patients. The decision was taken to maximise the access to natural light for all patients in the hospital; not an easy thing in a building with such a large footprint.
- Inspiration
- ONE20 designed this building around the atrium which acts as a focus for all activities and also to deliver high levels of sustainability. By looking creatively at the use of consultation space and agreeing strategy options with the consultant teams, the net building is around 20% smaller than one using standard NHS criteria.
- Project Duration
- The project is located on the campus of the Queens Medical Centre in Nottingham UK Work commenced in 2006 and has bees modified over the past 15 years. The latest work being concluded in 2019
- Operation Flow
- This is largest independent treatment centre in Britain. The Nottingham Day Treatment Centre is operated for the NHS providing high quality day case procedures. Secretary of State for Health Andrew Lansley, stated "It is providing a good care to patients on the basis of NHS principles. It made a profit of £4 million in the six-month period to 30 June 2013, up from £2.5 million. In 2016, Circle's teledermatology service was awarded a "Clinician’s Choice Award" by private healthcare industry group Hpci Media in the Building Better Healthcare Awards
- Team Members
- Adrian Light
Roger Walker
Tony Kidman
Rachel Dann
Denise Filbery
Claire Walker
Jerome Healy - Image Credits
- Photographer - Adrian Light
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.