Argento Pianificazione Urbana · 2021
Heito 1909 Il Parco Urbano
by ECG International Landscape Consultants
- A' Design Award d'Argento 2021 in Pianificazione Urbana
- CLIENT: Pingtung County Government, Pan Men-an
- Estimated Number of Design Views: 49,038
- Verification code F734C33BAA · Verify this award
Colors
About Heito 1909 Il Parco Urbano
Edifici e terreni sono stati costantemente rimossi e ricostruiti in quest'epoca, ogni progetto è un po' di “Tabula Rasa”. Transformation of Heito 1909 è un raro progetto di riuso adattivo, invece di essere ossessionato da edifici iconici, tutto nel parco è progettato al contrario come estensione delle rovine. Il design unico incorpora in modo creativo le rovine e le strutture danneggiate nelle strutture urbane affinché i cittadini possano sperimentarle. Significativamente, il parco offre un luogo in cui le persone possono impegnarsi in ambienti naturali di qualità all'interno di una città metropolitana.
About the A' Design Award d'Argento
Heito 1909 Il Parco Urbano ha vinto l'A' Design Award d'Argento, un riconoscimento enormemente prestigioso conferito a design di fascia alta, splendidi e impressionanti. I vincitori d'Argento sono opere tremendamente brillanti ed estremamente creative che illustrano l'eccezionale competenza, il talento e l'acume dei loro designer. Ci si aspetta che Heito 1909 Il Parco Urbano sia un'opera meravigliosa, una vetrina di eccellenza, notevolmente professionale e profondamente innovativa. Questo design vincitore dell'A' Design Award d'Argento è un'invenzione molto notevole e ammirata che giova ai confini dell'arte, della scienza, del design e della tecnologia e li fa avanzare. Heito 1909 Il Parco Urbano è una creazione molto invidiata che evoca desideri, porta sentimenti positivi e accende meraviglia e stupore.
Press Kit
- Unique Properties
- Heito 1909 is an urban park base on an abandon factory, the ruins of factories can trace back few important era, colonists era, world II, post war industrial era. The park is a first industrial landscape, adaptive reuse project in Taiwan. The project transforms an abandoned industrial ruin into an urban recreation space, also reform industrial polluted river, into natural habitat.
- Tags
- Taiwan, Pingtung, Landscape, Historical, Urban Design , cultural, waterfront
- Production Technology
- In the excavation we use "point cloud laser scanning" for precise mapping of historical remains, point cloud produce precise data for historical documentation and precise 3D drawing. For the historical remains we build pavilions in parametric design, and use (Rhino ,Grasshopper, sketchup ,Vectorwork ) for construction drawing, it helps with create gradual sequence. And Ecotect Environment analysis for urban planning.
- Design Challenge
- The ideal of historic preserved of an industrial park, is not popular for the public and public sector. Since it's old and ugly, lack of commercial value and highly maintained. So it took a while to come out with a scheme to be acceptable. Because what's left is all underground, it's difficult to anticipate every detail before excavation, so its constant revise the design solution, and experiment different approach of construction methods.
- Research
- During the excavation we discover the project had a rich history, but it was kept secret for a century, so a lot of research needed. The variety of historical research from US Nay WW2 record, and Japan colonist archives, industrial sugar factory documents. Just to find out the function of the historical remains, the stories had happened here. The story of this place gives us design a starting point, a way to juxtapose with the city that has become, and continue the story for the future.
- Inspiration
- During the excavation of the historical remains, stories of the place been reviled, we realize there is gaps in our history that’s being erased. Because historical building can’t be capitalized, so majority always been demolished. What was destroyed not just a building, but also multiple period of history, and that we were merely one tiny portion of this era that made this decision.
- Project Duration
- The project is based in Pingtung, Taiwan. And had two phases of design and construction, first started in June 2018 finished in 2020 January, excavation and landscape infrastructure. The second are the historical site reuse, from 2020 July finished in 2021 January.
- Operation Flow
- The project had an expected date to be finished, due to the uncertainty of what's underneath. It's difficult to finish in date with normal process. So it's Design and historical research while excavation, it's an overlap process constant modify the outcome.
- Image Credits
- Image #1: Yi-Hsien Lee and Associates
Image #2: Yi-Hsien Lee and Associates
Image #3: Yi-Hsien Lee and Associates
Image #4: Yi-Hsien Lee and Associates
Image #5: Yi-Hsien Lee and Associates