Oro Architettura · 2022
Entry Building to Sberbank Edificio d'ingresso
- A' Design Award d'Oro 2022 in Architettura
- CLIENT: Sberbank
- Estimated Number of Design Views: 33,245
- Verification code E2ABCE5723 · Verify this award
Colors
About Entry Building to Sberbank Edificio d'ingresso
L'Entry Building di Sberbank è un edificio d'ingresso per due torri per uffici adiacenti a Mosca. L'edificio racchiude lo spazio tra le due torri con una forma a paraboloide iperbolico, realizzata con 29 archi in acciaio e coperta da una copertura vetrata triangolata. La forma consente alla luce naturale di penetrare all'interno, limitando al contempo l'ostruzione della luce solare ai piani inferiori degli uffici. Tre livelli ospitano aree di accoglienza, ristoranti, caffetterie, un centro congressi e uno spazio per eventi conformato come un anfiteatro a gradoni. Entrambe le estremità sono coronate da pannelli in acciaio inossidabile color champagne.
About the A' Design Award d'Oro
Entry Building to Sberbank Edificio d'ingresso ha vinto l'A' Design Award d'Oro, un riconoscimento immensamente prestigioso conferito a design di primissima qualità, meravigliosi e straordinari. I vincitori d'Oro sono creazioni estremamente innovative, visionarie e di un fascino abbagliante che riflettono il genio, la saggezza e l'abilità dei loro designer. Ci si aspetta che Entry Building to Sberbank Edificio d'ingresso sia un'invenzione molto elogiata, all'avanguardia e monumentale che offre un valore senza precedenti. Questo design vincitore dell'A' Design Award d'Oro è un progetto spettacolare e rispettato che giova grandemente ai confini dell'arte, della scienza, del design e della tecnologia e li fa avanzare. Entry Building to Sberbank Edificio d'ingresso crea intensi sentimenti di desiderio, risveglia la passione, incoraggia la creatività e ci affascina.
Press Kit
- Unique Properties
- Both entrances at either end of the building are crowned in a series of champagne-coloured triangulated panels in stainless steel that incline outwards over the squares, like delicate tiaras. These warm-coloured crowns create playful reflections of pedestrians arriving and leaving the towers and glow up in different shades depending on the daylight. Internally, the fully glazed dynamic shape creates interiors with an al fresco vibe that merges indoor and outdoor spaces seamlessly.
- Dimensions & Packaging
- The building consists of three floors with the total floor area of 4000 square meters or 43055 square foot and 40000 cubic meters of built volume. The building is 83 meters long, 43 meters wide, with steel arches reaching 24 meters at the highest point and 20 meters at the lowest point.
- Tags
- Sberbank City, entrance building, Moscow, hyperbolic parabolic, Evolution Design, Tanya Ruegg
- Production Technology
- The hyperbolic parabolic form is achieved with the construction of 29 steel arches that increase the height towards either end of the building. The column free space is covered by a glazed roof that consists of an intricate triangulated structure. The first and second floors are made of concrete slabs, with the middle level designed as a dynamic curved shape that delivers two restaurant terraces facing the front entrance. An oval opening in the core of the building also connects all floors.
- Design Challenge
- The primary project challenge was creating a building volume large enough to accommodate all the required functions under one roof, without compromising daylight into the lower levels of the towers. The dynamic saddle form that the architects devised solves both challenges. A representative, spacious and daylight-flooded space has been created that accommodates all the necessary functions, while minimising sunlight obstruction to the offices in the towers.
- Research
- As the primary function of the building is as a covered entrance space into the two towers, particular attention was paid to finding the best solution for an efficient and comfortable flow of 10000 people who work in the towers. The solution was spreading the badge scanner areas over two floors, in order to split the flow, and strategically placing the main canteen restaurant on the first floor, leaving the ground floor for event and conference areas that can be accessed by the general public.
- Inspiration
- Sberbank commissioned Evolution Design to create a representative entrance to two adjoining high-rise towers that are part of Sberbank City, the new campus of Sberbank. The intervention should link the two towers and create a strong design statement within the narrow space, without compromising daylight into the lower levels of the towers. The architects responded to the ambitious brief with a hyperbolic parabolic form that rises up at either end enclosing the space between the towers.
- Project Duration
- Project construction started in July 2020 and was finished in June 2021 in Moscow.
- Operation Flow
- Spread over 3 floors, the building accommodates entrance facilities for people who work in the towers, central reception, several restaurants and coffee shops, a conference centre and a large event space styled as a stepped amphitheatre. The building is not only frequented by 10000 employees who work in the two towers as an entry, meeting and socialising place, but is also a popular choice to meet for lunch among workers from other buildings on the campus, and is also open to the general public.
- Patents
- Copyrights belong to Evolution Design, 2022
- Image Credits
- Image #1: Photographer Peter Wuermli, 2022. Image #2: Photographer Peter Wuermli, 2022. Image #3: Photographer Peter Wuermli, 2022. Image #4: Photographer Peter Wuermli, 2022. Image #5: Photographer Ilya Ivanov, 2022.