Tianliao ສະຖານີດັບເພີງ by Suiadr is a highly esteemed winner of the very prestigious 2021 A' Design Award ລະດັບເຫຼັກ in ການອອກແບບສະຖາປັດຕະຍະກຳ, ອາຄານ ແລະ ໂຄງສ້າງ Competition Category.
ເຫຼັກສະຖາປັດຕະຍະກຳ· 2021
Tianliao ສະຖານີດັບເພີງ
by Suiadr
Client: The Institute of Architectural Design and Research, Shenzhen University
A' Design Award ລະດັບເຫຼັກ Winner in ສະຖາປັດຕະຍະກຳ Category
- 11,791
- Verified Award Winner
- Verify Award Status for #117138
The Design
About Tianliao ສະຖານີດັບເພີງ
ຕຽນລຽວແມ່ນສະຖານີດັບເພີງທີ່ຕັ້ງຢູ່ໃນເຂດກວາງໝິງ ເມືອງເສິນເຈິນ ປະເທດຈີນ. ອາຄານດັ່ງກ່າວອອກແບບຕາມຜັງລວມສູນ ໂດຍປະສົມປະສານລະຫວ່າງອາຄານສຳນັກງານ 3 ຊັ້ນ ກັບຫໍຝຶກອົບຮົມ 7 ຊັ້ນ. ພື້ນທີ່ໃຊ້ສອຍລວມທັງໝົດແມ່ນ 5,039.5 ຕາລາງແມັດ, ໃນນັ້ນ 3,985 ຕາລາງແມັດຢູ່ເໜືອດິນ, ແລະອັດຕາສ່ວນພື້ນທີ່ອາຄານແມ່ນ 0.97. ລະດັບພື້ນພາຍໃນຖືກຍົກສູງຂຶ້ນເໜືອຖະໜົນເທດສະບານເພື່ອປ້ອງກັນນໍ້າຝົນໄຫຼເຂົ້າ. ພື້ນທີ່ເປີດໂລ່ງຖືກຈັດວາງໄວ້ຢູ່ຊັ້ນລຸ່ມ ເພື່ອບໍ່ໃຫ້ການຝຶກອົບຮົມປະຈຳວັນຖືກລົບກວນ. ນອກຈາກນີ້ຍັງມີການຈັດວາງສວນໄວ້ຫຼາຍບ່ອນພາຍໃນພື້ນທີ່ໂຄງການ.
The Recognition
About the A' Design Award ລະດັບເຫຼັກ
Tianliao ສະຖານີດັບເພີງ ແມ່ນຜູ້ຊະນະ A' Design Award ລະດັບເຫຼັກ ເຊິ່ງເປັນການຍອມຮັບທີ່ມີກຽດສຳລັບການອອກແບບທີ່ດີ ທີ່ຕອບສະໜອງຄວາມຕ້ອງການທາງວິຊາຊີບ ແລະ ອຸດສາຫະກຳທີ່ຄາດຫວັງຈາກຜົນງານທີ່ອອກແບບມາຢ່າງດີ. ຜູ້ຊະນະລະດັບເຫຼັກສະແດງເຖິງທັກສະອັນຍິ່ງໃຫຍ່ ຄວາມຊຳນານສະເພາະສູງ ຄວາມເຂົ້າໃຈຂອງຜູ້ຊ່ຽວຊານ ແລະ ຄວາມສາມາດໃນການສ້າງສັນຂອງຜູ້ສ້າງ. Tianliao ສະຖານີດັບເພີງ ຖືກຄາດວ່າຈະເປັນຜົນງານທີ່ໄດ້ຮັບການຍົກຍ້ອງສູງ ໜ້າຊົມເຊີຍ ແລະ ເປັນທີ່ຮັກແພງ ທີ່ໃຊ້ງານໄດ້ຈິງ ແລະ ມີນະວັດຕະກຳ. ການອອກແບບທີ່ຊະນະລະດັບເຫຼັກນີ້ລວມວິທີປະຕິບັດທີ່ດີທີ່ສຸດຂອງອຸດສາຫະກຳ ແລະ ມີຄຸນລັກສະນະທາງເຕັກນິກທີ່ມີຄວາມສາມາດ ເຊື່ອມໂຍງກັບຄວາມຮູ້ ແລະ ພອນສະຫວັນ. Tianliao ສະຖານີດັບເພີງ ໄດ້ຮັບການເຄົາລົບສຳລັບຄວາມລະອຽດຮອບຄອບ ແລະ ຖືກອອກແບບເພື່ອປັບປຸງຄຸນນະພາບຊີວິດ ຊ່ວຍເຮັດໃຫ້ໂລກເປັນບ່ອນທີ່ດີຂຶ້ນ.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- It's a new fire station with a centralized layout. The vertical design makes the station almost as tall as the Huanguang Road. The internal elevation of the station is higher than that of the municipal road, preventing rainwater from flowing into the inside. The layout meets the requirements of setback, sunshine and fire prevention, etc. The pedestrian entrance and exit are at the southwest side. The open areas are mainly at 1F and the mezzanine, making no influence on firemen's daily training.
- Dimensions & Packaging
- Its gross floor area is 5,039.5 sqm with 3,985 sqm above the ground. It has a 3-story office building and a 7-story training tower. The floor area ratio is 0.97. The exterior windows adopt LOW-E energy-efficient glass and thermal mortar. The roofing is paved with 50mm extruded polystyrene boards for thermal insulation. The septic tank and oil separator tank adopt integrated equipment like glass steel. The energy-saving water heating system uses solar power and air force heat pump.
- Tags
- Fire station, centralized layout, standardization, setback, multi-layer public building, infrastructure, The Institute of Architectural Design and Research, Shenzhen University, Z&Z STUDIO
- Production Technology
- 1. The exterior windows adopt LOW-E energy-efficient glass and thermal mortar. The roofing is paved with 50mm extruded polystyrene boards for thermal insulation.
2. The project mainly uses reinforced concrete frame structure and the base adopts independent column-shaped and bar-shaped waterproof slabs. The roof uses cast-in-situ reinforced concrete slab system with main and secondary beams. Secondary beams are set properly to reduce the plane size of slab avoiding too much material waste. - Design Challenge
- Building setback: Due to the limited land, it was possible to set back building in accordance with the official requirements. After several times of negotiation with the planning bureau, the design team reached a reasonable bargain: the plot is set back 2.3m on the east, 6.05m on the south, 2.3m on the west and 1.8m on the north. In this way, the fire station and sports fields were reasonably arranged within the limited land.
- Research
- The design must follow the research results of "the 2014 Shenzhen Fire Station Standardization Design Workshop". It shall establish the construction standards of Shenzhen fire stations. The experience of it can also provide reference for domestic fire stations. The design should satisfy basic needs, consider the possibility of the profession development, and embody the considerations of openness and cultural promotion of fire control. It has won a second prize awarded by SUIADR in 2020.
- Inspiration
- Located in Guangming District, Shenzhen, the project occupies the land of 4,099.16 m2, with the planned Huanguang Road on the west, the planned Nantian Road on the north, Nangen Road on the south and Mobi Antenna Technology (Shenzhen) Co., Ltd. on the east. As a first-class fire house, its gross floor area is 5,039.5 m2 with 3,985 m2 above the ground and 1,054.5 m2 underground. It consists of a three-story office building and a seven-story training tower.
- Project Duration
- Starting time: November 10, 2016
Completion time : July 20, 2020
Location: Guangming District, Shenzhen - Operation Flow
- The parking garage for fire trucks faces the street. The visiting entrance and exit is at the southwest side of the plot. The open areas are at 1F and 2F, the foyer and canteen at 1F. Firemen's preparation rooms are on 2F with a bathroom and a shower room on the west. 3F houses offices and auxiliary rooms and the basement has an emergency storeroom and equipment room. Gardens are set at many places, enriching firemen’s life.
- Team Members
- Zhong Zhong, Zhong Botao, Wang Min, Zhong Haihuan、Zeng Yusheng、Su Xiaoyue、Deng Rixing
Liu Mu、Yong Yong、An Huijuan、Zhou Jie、Cao Jiying、Xiong Feng、He Xiaoming、Wang Wei
Ye Zhien、Wu Zhirong - Image Credits
- Tian Tengfei
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.