Skip to content
The Courtyard Poilsio erdvė by Nischal Abhaykumar

The Courtyard Poilsio erdvė by Nischal Abhaykumar is a highly esteemed winner of the very prestigious 2019 Bronzinis apdovanojimas A' Design Award in Architektūros, pastatų ir konstrukcijų dizainas Competition Category.


BronzinisArchitektūra· 2019

The Courtyard Poilsio erdvė

by Nischal Abhaykumar

Client: M9 Design Studio

Bronzinis apdovanojimas A' Design Award Winner in Architektūra Category

13,906

Verified Award Winner

Verify Award Status for #76233

Colors

The Design

About The Courtyard Poilsio erdvė

Kiemas – tai poilsio ir renginių pastatas, suprojektuotas bendruomenės susibūrimams. Dviaukštis pastatas stačiakampio plano, su plokščiu stogu, gofruotomis metalinėmis sienomis ir minkšto plieno karkasu. Gofruoto polikarbonato fasadas apjuosia daugiafunkcę renginių erdvę pirmame aukšte ir įleidžia natūralią šviesą į vidų. Fasadą dengia tekstūruotos užuolaidos, skirtos šviesai valdyti renginių metu. Viduje palikti matomi juodai dažyti plieno sijos, atviros dengto skarda lubos bei betono ir medienos grindys. Masinės gamybos elementai leido išlaikyti žemas statybos sąnaudas, o statybos laikotarpį sutrumpinti iki 75 dienų.

The Recognition

About the Bronzinis apdovanojimas A' Design Award

The Courtyard Poilsio erdvė laimėjo Bronzinį apdovanojimą A' Design Award, labai prestižinį pripažinimą, skiriamą išskirtiniams dizainams, kuriuos žymi kūrybiškumas, išradingumas ir sumanumas. Bronzos laureatai yra pakankamai įgudę ir stulbinamai kūrybingi dirbiniai, patvirtinantys jų kūrėjų didelę patirtį, vaizduotę ir išteklių gausą. Tikimasi, kad The Courtyard Poilsio erdvė bus aukštai vertinamas, žavimas ir brangus daiktas, žymiai profesionalus ir novatoriškas. Šis Bronziniu apdovanojimu įvertintas dizainas įtraukia geriausias praktikas mene, moksle, dizaine ir technologijose ir yra puikus dėl dėmesio detalėms. The Courtyard Poilsio erdvė puikiai tenkina poreikius, paliečia troškimus, žavi jausmus ir traukia smalsumą.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
The aim was to create a unique building using mass-produced components – cheap price and with short execution timeline. Rectangular in plan, the two-storey building features a flat roof, corrugated metal walls and a mild steel frame. Corrugated polycarbonate sheet facade encases the multi-purpose event space on the first floor. Thin and translucent material is used to replace the regular exterior walls, where natural light can be maximised in the interior space.
Dimensions & Packaging
Built-up area - 3500 sqft. (New building only)
Site area - 6000 sqft.
Tags
Adaptive re-use, modern, industrial, old and new, polycarbonate box
Production Technology
A steel structure made up of I-beams is on show inside the building and has been painted black. Deck sheet ceilings are left exposed, while the floors encompass a mixture of concrete and timber.
Design Challenge
The designated space earlier comprised of a single two-storey building along with a courtyard, set in the client’s grandparents’ house. It is almost a 50-year-old residence along with a garden café that was utilised for events. In the absence of a dedicated space for various functions, the setting of the space was informal and could not generate much revenue. In order to fill the gaps in the existing design, a new structure was introduced and made sure that it would not overpower the older one in height or by use of materials.
Research
Public space is and has been an integral part of communities, serves as a location for people to meet, relax and exchange ideas - refreshment of ones mind or body after work that amuses or stimulates. Informal open recreational space is that which provides opportunities for more passive recreational pursuits. It may also have a scope for informal play. Participation in recreation is regarded as being essential in contributing to people's well being.
Inspiration
The site previously formed part of the garden of a house occupied by the clients' grandparents. The design of the new building was intended to minimise its impact on this existing house, both during and after its construction. A desire to maintain a connection with the existing house informed the decision to keepas much of the existing garden area as possible, and to position the entrance to the new building so it opens onto this space.
Project Duration
The building was completed in June 2018 and the duration of construction was 75 days.
Operation Flow
The inside of this polycarbonate sheet facade is lined by rich textured drapes to control the amount of natural light inside during specific shows and events. Windows are made from the same material as the walls, so they don't offer any additional light but can be opened to let fresh air into the building. At night, lights glowing from within transform the building into a huge light-box along the streetscape.
Team Members
Nischal Abhaykumar
Jesal Pathak
Preethi B Raju
Karamveer Singh
Image Credits
Shamanth Patil Photography

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

The A' Design Award is an international, juried accolade for good design. Take part in the A' Design Award to get an opportunity to earn meritocratic recognition, gain fame, prestige and publicity for your work. Nominate your work for the A' Design Award and compete for the coveted A' Design Prize.

Nominate