About QMC Hospital Dienas ārstniecības centrs
QMC slimnīca ir dienas ārstniecības centrs, kas atrodas Queens Medical Centre teritorijā Notingemā, Apvienotajā Karalistē. Ēkā izvietotas 15 nodaļas, tostarp diagnostikas un operāciju bloki, kas izvietoti divos ekspluatācijas stāvos ar kopējo platību 9500 kvadrātmetru. Plānojums veidots ap centrālo atriju, kas ievada dabisko gaismu ēkas iekštelpās un veicina augstu ilgtspējības līmeni. Pārvietošanās zonas ir norobežotas ar caurspīdīga stikla sienām. Rūpīga konsultāciju telpu izpēte ļāva padarīt ēku par aptuveni 20 procentiem mazāku, nekā to prasītu standarta kritēriji.
The Recognition
About the Dzelzs balva A' Design Award
QMC Hospital Dienas ārstniecības centrs ir Dzelzs balvas A' Design Award ieguvējs, prestiža atzinība, ko piešķir labiem dizainiem, kas atbilst profesionālajām un rūpnieciskajām prasībām, kādas sagaidāmas no labi izstrādātiem darbiem. Dzelzs ieguvēji parāda to radītāju lielo prasmi, augsto specializāciju, ekspertu izpratni un radošo spēju. Sagaidāms, ka QMC Hospital Dienas ārstniecības centrs būs augsti vērtēts, apbrīnots un cienīts darbs, praktisks un inovatīvs. Šis ar Dzelzs balvu apbalvotais dizains integrē nozares labāko praksi un tam ir kompetentas tehniskās īpašības, kas saistītas ar zinātību un talantu. QMC Hospital Dienas ārstniecības centrs tiek cienīts par rūpību un ir izstrādāts, lai uzlabotu dzīves kvalitāti un palīdzētu padarīt pasauli labāku.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- Nottingham NHS DayTreatment Centre (NDTC) is part of a UK government initiative to provide modern state of
the art facilities equipped with the latest technology.
medical treatment and outpatient consultation rooms.
Including diagnostics and theatre suites there are 15 departments integrated into this building all providing day care facilities and treatment. By relocating these departments the hospital was able to free bed space for longer term care. This was opened as the largest Independent Sector Treatment Centre in Britain. - Dimensions & Packaging
- Key facts are:-
185,000 patients per annum
9,500 sq m over two operational floors
6 years from inception to opening including all bidding stages
1,000 NHS staff on secondment from QMC
Saving features to achieve energy targets of N55 gj/100cu m/annum - Tags
- Hospital,, Architecture, Sustainability, Hospital Design, NHS, Treatment Centre
- Production Technology
- The building is composed from modern building materials. The circulation areas are celebrated with clear glass. The tunnel connecting the new building to the old is a metal tube with slits that create a rythym of light as you walk along. Another level of research investigated how to provide additional teatments and reduce waiting times.
- Design Challenge
- The site was an old established hospital campus. The new building had to fit within the overall precinct, but also be a distinct element. Public art was an integral part of the brief. ONE20 established separate Art and Landscape budgets. This ensured that these elements were not lost during construction. The art was procured through design competition. The planning of the building was integral to ensuring a more efficient healthcare process. The design of treatment areas meant waiting times have been reduced and more patients have been seen than in a traditionally planned hospital.
- Research
- It is now becoming better accepted that natural light can play an important role in speeding up the recovery of patients. The decision was taken to maximise the access to natural light for all patients in the hospital; not an easy thing in a building with such a large footprint.
- Inspiration
- ONE20 designed this building around the atrium which acts as a focus for all activities and also to deliver high levels of sustainability. By looking creatively at the use of consultation space and agreeing strategy options with the consultant teams, the net building is around 20% smaller than one using standard NHS criteria.
- Project Duration
- The project is located on the campus of the Queens Medical Centre in Nottingham UK Work commenced in 2006 and has bees modified over the past 15 years. The latest work being concluded in 2019
- Operation Flow
- This is largest independent treatment centre in Britain. The Nottingham Day Treatment Centre is operated for the NHS providing high quality day case procedures. Secretary of State for Health Andrew Lansley, stated "It is providing a good care to patients on the basis of NHS principles. It made a profit of £4 million in the six-month period to 30 June 2013, up from £2.5 million. In 2016, Circle's teledermatology service was awarded a "Clinician’s Choice Award" by private healthcare industry group Hpci Media in the Building Better Healthcare Awards
- Team Members
- Adrian Light
Roger Walker
Tony Kidman
Rachel Dann
Denise Filbery
Claire Walker
Jerome Healy - Image Credits
- Photographer - Adrian Light
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.