Kwsa Kinētiskā siena by Leva Engineering is a highly esteemed winner of the very prestigious 2025 Sudraba balva A' Design Award in Instalāciju dizains Competition Category.
SudrabaInstalācija· 2025
Kwsa Kinētiskā siena
Client: Leva Engineering
Sudraba balva A' Design Award Winner in Instalācija Category
- 29,817
- Verified Award Winner
- Verify Award Status for #172468
The Design
About Kwsa Kinētiskā siena
Kwsa ir kinētiska sienas instalācija, kas atrodas Aramco Inovāciju centrā Rijādā. Darbs aizņem 209 kvadrātmetrus, un to veido sešas modulāras sienas, katra 6000 mm plata un 7000 mm augsta. Kustību rada 20 000 soļu motori, kas darbina pielāgotu gaitas skrūves un sviras sistēmu ar 0,1 mm precizitāti. Komponentiem, kas izgatavoti no pašeļļojošiem tehnopolimēriem, nav nepieciešama eļļošana, un tie nodrošina piekļuvi no priekšpuses apkopes veikšanai. Horeogrāfiskās secības tiek veidotas no pelēktoņu video, kur spilgtuma vērtības nosaka kustības pakāpi.
The Recognition
About the Sudraba balva A' Design Award
Kwsa Kinētiskā siena ir Sudraba balvas A' Design Award ieguvējs, ārkārtīgi prestiža atzinība, ko piešķir augstākās klases, krāšņiem un iespaidīgiem dizainiem. Sudraba ieguvēji ir ārkārtīgi spožas un ļoti radošas izpausmes, kas parāda to dizaineru izcilo kompetenci, talantu un asredzību. Sagaidāms, ka Kwsa Kinētiskā siena būs lielisks, paraugdarbs, ļoti profesionāls un dziļi inovatīvs. Šis ar Sudraba balvu apbalvotais dizains ir ievērojams, apbrīnots izgudrojums, kas palīdz paplašināt mākslas, zinātnes, dizaina un tehnoloģiju robežas. Kwsa Kinētiskā siena ir radījums, kam daudzi apskauž, kas modina vēlmes, rada pozitīvas izjūtas un raisa izbrīnu un apbrīnu.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
- Dimensions & Packaging
- Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required. - Tags
- Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
- Production Technology
- The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
- Design Challenge
- A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
- Research
- This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
- Inspiration
- The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
- Project Duration
- The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024. - Operation Flow
- The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
- Team Members
- Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.