Skip to content
Tramdepot Bern Tramvaju depo by Penzel Valier

Tramdepot Bern Tramvaju depo by Penzel Valier is a highly esteemed winner of the very prestigious 2026 Sudraba balva A' Design Award in Arhitektūras, ēku un būvju dizains Competition Category.


SudrabaArhitektūra· 2026

Tramdepot Bern Tramvaju depo

by Penzel Valier

Client: Penzel Valier

Sudraba balva A' Design Award Winner in Arhitektūra Category

Colors

Email this page

The Design

About Tramdepot Bern Tramvaju depo

Tramdepot Bern ir tramvaju depo ar apkopes un remonta zonām Bernē, Šveicē. Garenas formas halli klāj viegls stikla un alumīnija apvalks. Balts stikls, īpaša virsmas struktūra un pakāpjveida montāžas metode rada izteiksmi, kas mainās līdz ar gaismu. Naktī ēka izskatās kā spoža laterna. Šeda tipa jumts no tērauda kopnēm pārsedz stāvvietu zonu bez kolonnām. Konstruktīvā sistēma ļauj depo pakāpeniski paplašināt šaurajā zemesgabalā ar slīpiem leņķiem.

The Recognition

About the Sudraba balva A' Design Award

Tramdepot Bern Tramvaju depo ir Sudraba balvas A' Design Award ieguvējs, ārkārtīgi prestiža atzinība, ko piešķir augstākās klases, krāšņiem un iespaidīgiem dizainiem. Sudraba ieguvēji ir ārkārtīgi spožas un ļoti radošas izpausmes, kas parāda to dizaineru izcilo kompetenci, talantu un asredzību. Sagaidāms, ka Tramdepot Bern Tramvaju depo būs lielisks, paraugdarbs, ļoti profesionāls un dziļi inovatīvs. Šis ar Sudraba balvu apbalvotais dizains ir ievērojams, apbrīnots izgudrojums, kas palīdz paplašināt mākslas, zinātnes, dizaina un tehnoloģiju robežas. Tramdepot Bern Tramvaju depo ir radījums, kam daudzi apskauž, kas modina vēlmes, rada pozitīvas izjūtas un raisa izbrīnu un apbrīnu.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
The external appearance of the hall is characterised by the lightness of the glass-aluminium shell. The use of white glass, the special surface structure and the staggered installation method (halved grid) result in a changing expression depending on the light. In grazing light, the white colour of the glass and the matt shimmer of the surface create a proximity to the bare aluminium sheets, giving the building a three dimensional expression.
Dimensions & Packaging
The extensive glazing in the truss levels of the beams and in the façades also ensures optimum lighting conditions and allows the hall to be operated without a heating system thanks to the solar radiation. To prevent overheating in summer, the SHEV flaps in the lower façade area (supply air) and in the high sheds (exhaust air) can be opened for night-time cooling. Rainwater is directed from the roof into the side gutters via the sloping surfaces of the longitudinal façades, from where it is fed into the washing system. A 3,600 m2 photovoltaic system on the sloping roof surfaces complements the building‘s sustainability claim.

The geometry of the hall results from the operational need for a maximum, column- free parking area. The roofing is supported over the entire length of the hall of around 200 meters by a shed roof structure made of steel trusses with spans of up to 90m (stage 3). A single row of columns separates the parking area from the service area with car wash, wheel processing area and maintenance building. The lifting doors of the front façade with door heights of up to 10m open and close vertically. The inner and outer supports are arranged in a V-shape for longitudinal reinforcement. They form a basic design motif in the structure and rhythm of the façade and thus characterize the overall appearance of the building. The external appearance of the hall is characterized by the lightness of the glass-aluminium shell. The use of white glass, the special surface structure and the staggered installation method result in a changing sculptural expression depending on the light.

Site area: 36,500 m2
Floor space: 15,200 m2
Floor area: 16,000 m2
Number of levels: 1st floor
Length: 202 m
Width: 165 m
Hight: 6 - 17 m
Building volume: approx.165,000 m3
Tags
Engeneering Architecture, Strip-shaped hall, Glass-aluminium shell, Extensible structure, Lightness, Structural system, Translucent façade
Production Technology
The expansion of the streetcar depot was conceived in several stages as early as the 2007 competition. With the expansion of the city‘s streetcar network, a denser timetable and new, longer streetcars, the need for depot capacity increased. Ten years after completion of the first stage, construction work therefore began on the second stage. This consists of expanding the depot from seven to a total of 15 sidings in the direction of Bolligenstrasse. In a third stage - not yet scheduled - an extension of eight workshop tracks is planned.

The extension will increase the span in the stabling area from 45 to 72 meters and in the workshop area from 68 to 95 meters. The considerable span for the column- free extension of the parking area was achieved with the gradual growth of the truss girders, which then function according to the principle of crane jibs. The main forces are absorbed by a middle row of columns, while the façade columns on the shorter span side are transformed from compression members to tension members with the extension.
Design Challenge
For the Bern tram depot, we proposed the principle of an extensible structure for the optimum utilization of the narrow plot with its sharp irregular angles. Here the structural system is sized to allow a step-by-step column-free expansion of the depot.
For the extension, the existing façade facing Bolligenstrasse was demolished and the materials separated and recycled. Temporary steel supports and a wooden wall ensured the functional usability of the hall during the two-year construction period. The upper and lower chords of the shed trusses are connected with steel purlins in the longitudinal direction to form a hall. Ribbed panels made of glulam complement the purlins and form shear-resistant connections with the trusses as stiffening discs. The connection between the upright ribs and the horizontal trapezoidal timber panels was produced in the factory using press-gluing. In order to be able to produce the 250 roof and wall elements as economically as possible, series of around 30 different types were created. The element production is based on a comprehensive 3D model, which was used to plan the serial prefabrication process, from element lists and machine data to loading plans. The large quantities required sophisticated logistics. To save on interim storage, production, transport and assembly were carried out in parallel.
Research
The expansion of the tram depot in three stages was already included in the design for the 2007 competition. This requirement necessitated intensive research and planning efforts. Penzel Valier's planning work therefore began directly with an optimisation process: the track system was condensed, the oblique perimeter was incorporated into the supporting structure and outer form, and the volume of the hall was reduced.
An open dialogue between the client Bernmobil and the general planner accompanied the planning and implementation and ultimately led to the ideal result.
Inspiration
At night, the building is transformed into a light, bright lantern. Inside, the light falls in according to the rhythm of the shed glazing, sometimes directly, sometimes in multiple reflections in the spaces between the schedules, thereby modulating the atmosphere in the hall. The colour scheme in anthracite (graphite coating of the wood) and black (steel) creates a calm background against which the light sets the scene for the parked vehicles.
Project Duration
2008-2011 (1st stage), 2019-2023 (2nd stage)
Bolligenstrasse 58, 3006 Bern
Operation Flow
Tram depot with service and maintenance area, bridge over freeway (1st stage), extension (2nd stage), additional workshop and maintenance facilities (3rd stage)
The expansion of the streetcar depot was conceived in several stages as early as the 2007 competition. With the expansion of the city‘s streetcar network, a denser timetable and new, longer streetcars, the need for depot capacity increased.
Patents
Copyrights belong to Penzel Valier
Team Members
Christian Penzel
Martin Valier
Niklaus Lohri
Tobias Schaer
Gino Guntli
Christel Erdmenger
Leonore Daum
Reto Eberli
Ralf Gartmann
Gino Guntli
Claudia Loewe
Maic Neurauter
Jaffar Sabbah
Tim Schäfer
Roland Schmed
Roland Siegel
Stephanie Weiss
Martin Ulrich
Elmar Wenk
Laura Zgraggen
Enis Basartangil
Christel Erdmenger
Balazs Kutas
Sven Laubel
Marco Mayer
Heinz Rempfler
Friedrich Tellbüscher
Image Credits
Images: Dominique Uldry
Video: Dominic Büttner

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate