Interpolation Primary Function: Whare Toi by ChungYeon Won is a highly esteemed winner of the very prestigious 2021 A' Design Award Hiriwa in Hoahoa Waihanga, Whare me te Hanganga Competition Category.
HiriwaWaihanga· 2021
Interpolation Primary Function: Whare Toi
A' Design Award Hiriwa Winner in Waihanga Category
Verified Award Winner
Verify Award Status for #113155The Design
About Interpolation Primary Function: Whare Toi
He whare toi a Interpolation i hoahoatia ki roto i te Papa Roto o Seokchon i Seoul. Kei roto i te papa he roto me ngā ara mōwhiti motuhake e rua, kotahi ki roto, kotahi ki waho, kua wehea e te rerekētanga teitei e whā mita. Ka hangaia e te whare toi tētahi ara pārongo e hono ana i ngā ara e rua me te waihanga tomokanga hou ki roto i te papa. Kua whakakākahutia te tinana o te whare ki ngā panga konumohe piko, ā, kua whakaotia te papa e tūtaki ana ki te whenua ki te raima whakaatu. Ka whakaitihia te whakamahinga o te kaha e ngā pama wera nō te whenua me ngā panga hihiko whakaahua i runga i te tuanui. Ko te whāinga kia kawea mai te toi ki te oranga o ia rā.
The Recognition
About the A' Design Award Hiriwa
Ko Interpolation Primary Function: Whare Toi te toa o te A' Design Award Hiriwa, he whakaaetanga tino whai mana e hoatu ana ki ngā hoahoa taumata teitei rawa, ātaahua me te whakamīharo. Ko ngā toa Hiriwa he mahi tino kanapa, tino auaha e whakaatu ana i te mātanga, te pūmanawa me te mōhio hōhonu o ā rātou kaihoahoa. E tūmanakohia ana ko Interpolation Primary Function: Whare Toi he mahi whakamīharo, he tauira, he tino ngaio, he auaha hōhonu. Ko tēnei hoahoa i toa i te Hiriwa he hanganga rongonui, whakamīharotia e whai wāhi ana ki te whakawhānui i ngā rohe o te toi, te pūtaiao, te hoahoa me te hangarau. Ko Interpolation Primary Function: Whare Toi he mahi e hae ana te tini, e whakaara ana i ngā hiahia, e kawe mai ana i ngā kare-ā-roto pai, ā, e whakaoho ana i te mīharo.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- Lacking amenities for a cultural experience, Seoul City called for a design competition of an art museum within the Seokchon Lake Park. The proposal is a winning scheme under development; construction is expected to be completed by the end of 2021. The proposed design aims to provide a visual mark as an entry into the park. The newly introduced interpolating path connects the discontinuous outer ring path and inner ring path, bisecting the site to design a new "gateway" to the park.
- Dimensions & Packaging
- Site Area: 1,396.58㎡
Building Area: 1,543.2㎡
Floor No: Below grade 1 floor, Above grade 3 floors
Building Height: 15m - Tags
- Art Gallery, Parametric Design, Organic Form, Sustainable design, Public Interaction
- Production Technology
- The overall form, even though visually appears organic, is designed with fully developable, rationalized surfaces. The building mass will be constructed with curved aluminum panels, and the deck structure which meets the park landscape directly will be finished with exposed concrete. The project also includes various sustainability measures from ground-source heat pumps to photovoltaic panels on the roof, meeting Seoul City's zero-energy code for public buildings.
- Design Challenge
- Public projects in Korea are often limited by financial funding and complicated approval process. The project intends to be an art by itself and is going through rigorous geometrical studies for optimized fabrication and construction. Only 20% of the overall panels are required to be curved, and the use of flat panels is maximized. The project received approval from the Park Commission, considered one of the most challenging processes for buildings located in public parks.
- Inspiration
- The general concept of architectural interpolation stems from analyzing the current site conditions and context of Seokchon Lake Park. A public park located in Seoul City, it has a unique topographical character. The park is composed of a lake and (2) separate ring paths, one inner around the lake, and an outer peripheral following the city's roadways. 4m elevation difference between the two walkways separates the two with limited connections. Interpolating an organic passage through the densely landscaped sloped territory and connecting the two paths was the project's main idea.
- Project Duration
- The project competition was held in February 2019 announcing the winner on March 12th. The design is under development for construction which is scheduled to start in March 2021 and completed in February 2022.
- Operation Flow
- Considering the location of the project, the gallery's role as infusing the art in the daily life of the viewers will be as crucial as exhibiting the artwork. Through the flowing connection of the interior and exterior spaces and the organic relationship between the spaces, we expect to provide everyday artistic experiences to visitors and those passing by.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.