Ko te hoahoa Imatra GIS Mahi Matua: Teihana Iti Hiko nā Virkkunen and Co Architects he kaitoa whakahirahira o te 2021 A' Design Award Hiriwa i te Wāhanga Whakataetae Hoahoa Waihanga, Whare me te Hanganga.
HiriwaWaihanga· 2021
Imatra GIS Mahi Matua: Teihana Iti Hiko
nā Virkkunen and Co Architects
Kiritaki: Virkkunen & Co Architects
Kaitoa o te A' Design Award Hiriwa i te Wāhanga Waihanga
Kaitoa Tohu Manatokohia
Manatokohia te Tūnga Tohu mō #120944Te Hoahoa
Mō Imatra GIS Mahi Matua: Teihana Iti Hiko
Ko te Imatra GIS he teihana iti hiko kei roto i te whenua o ngā tere wai o Imatrankoski i te rāwhiti o Finland. Kei roto i te kaupapa he whare teihana iti me ngā pou hiko e rima me ngā pito. He anga raima tō te whare me ngā mata pānui-rua. Ko te paparanga o waho i mahia ki ngā pereki roa i hangaia ā-ringa, ka whakatakotoria i runga i te tauira zig-zag, ka tautokona e te anga rino. Ko ngā hanganga tuku i mahia ki ngā tapatoru rino kua whakapiria. Ka wehewehe te hoahoa i ngā āhuatanga o te horopaki hanga, ā, ka whakahiato anō i ngā wāhanga ki tētahi āhua whakaahua hou, e taurite ana ki te whenua e karapoti ana.
Te Whakamihi
Mō te A' Design Award Hiriwa
Ko Imatra GIS Mahi Matua: Teihana Iti Hiko te toa o te A' Design Award Hiriwa, he whakaaetanga tino whai mana e hoatu ana ki ngā hoahoa taumata teitei rawa, ātaahua me te whakamīharo. Ko ngā toa Hiriwa he mahi tino kanapa, tino auaha e whakaatu ana i te mātanga, te pūmanawa me te mōhio hōhonu o ā rātou kaihoahoa. E tūmanakohia ana ko Imatra GIS Mahi Matua: Teihana Iti Hiko he mahi whakamīharo, he tauira, he tino ngaio, he auaha hōhonu. Ko tēnei hoahoa i toa i te Hiriwa he hanganga rongonui, whakamīharotia e whai wāhi ana ki te whakawhānui i ngā rohe o te toi, te pūtaiao, te hoahoa me te hangarau. Ko Imatra GIS Mahi Matua: Teihana Iti Hiko he mahi e hae ana te tini, e whakaara ana i ngā hiahia, e kawe mai ana i ngā kare-ā-roto pai, ā, e whakaoho ana i te mīharo.
I Muri i te Hoahoa
Kete Pāpāho
Ngā whakamihi, ngā mema o te rōpū me ngā taipitopito hangarau i whakaratohia e te kaihoahoa.
- Āhuatanga Motuhake
- The project is composed of an electricity substation building and an array of five designer power pylons and terminals, set in the national landscape of Imatrankoski rapids in Eastern Finland. The new structures were designed to be in balance with the surrounding landscape. Their design breaks apart aspects of the built context and reassembles them in a new abstracted form. A combination of hand-made and industrial materials and structures is used to achieve this.
- Inenga & Pēketanga
- The substation building floor area: 965 sqm. Length x width x height of the building 44,1 m x 13,2 m x 8,1 m.
- Tūtohu
- infrastructure, architecture, landscape, electricity substation, transmission, power line, brick, concrete, steel
- Hangarau Whakanao
- The substation building has a concrete frame and double-skin facades. The outermost facade layer consists of hand-made long bricks laid in a zig-zag profile. The brick cladding is supported by a steel frame fixed to the inner concrete facades. The concrete structure consists of pre-fabricated and in-situ parts. The transmission structures are made of triangular welded steel profiles. They consist of workshop-made, coated pre-fabricated sections assembled and erected on the site without welding.
- Wero Hoahoa
- The main challenge was architectural rather than technical, due to the qualities of the surrounding landscape and the history of the area. Visual and structural coherence of the distinct parts and general sensitivity to the context were methods for overcoming this challenge. We arrived at the final design through a process of elimination. Dozens of prototype 3D models were evaluated for impact in a detailed and accurate site model based on an extensive point-cloud data set of the area.
- Rangahau
- We used site visits and literature sources for determining visual and historical factors that would most influence and serve the design. Literature about the history of the landscape, tourism, architecture, and industry in the area was used. The finding that had the most impact on the design was based on the analysis of the external architecture of the old hydropower plant: the rhythm of the facade openings, and the materials used in the buildings.
- Whakaaweawe
- The beautiful landscape and the historical significance of the area were the primary sources of inspiration for us. The existing, impressive industrial architecture of the context was another major factor in the design. The guiding principle has been that the new structures should form a clearly defined new historical layer. They would also have to be timeless and combine harmoniously with the context. We sought to further elevate the beauty of the site.
- Roanga o te Kaupapa
- Project completed: 2020
Location: Imatra, Finland - Rerenga Mahi
- Imatra electricity substation and the transmission structures are not fenced off from the surroundings and they can be approached freely. The substation is an unmanned facility that is mainly remote-controlled from a central control room located off-site. It is visited regularly for inspection and maintenance purposes by trained personnel. In the main process equipment room, the users control the switchgear equipment on a workstation designed for this purpose.
- Ngā Mema o te Rōpū
- Tuomas Kivinen
Anna Blomqvist
Maria Karjalainen - Whakamana Whakaahua
- Image #1: Photographer Tuomas Kivinen, 2020.
Image #2: Photographer Tuomas Kivinen, 2021.
Image #3: Photographer Tuomas Kivinen, 2020.
Image #4: Photographer Tuomas Kivinen, 2021.
Image #5: Photographer Tuomas Kivinen, 2021.
Kaitautoko
Tūhuratia i Tua Atu o Designers.org
Kimihia ngā hua, ngā ratonga me ngā āheinga mai i ā mātou hoa whakatairanga.
Ētahi Atu Hei Tūhura
Ngā Hoahoa e Hono Ana
Tūhuratia ētahi atu hoahoa whiwhi tohu mai i te kāwai kotahi, kua kōwhiria mā te kounga.