Drawor Ko te Pūnaha Whakatakoto Hanganga by Huaibo Zhu, Ziteng Li and Weihan Chen is a highly esteemed winner of the very prestigious 2025 A' Design Award Rino in Hoahoa Karetao, Pūrere Aunoa me te Aunoa Competition Category.
RinoKaretao· 2025
Drawor Ko te Pūnaha Whakatakoto Hanganga
by Huaibo Zhu, Ziteng Li and Weihan Chen
Client: Beijing Institute of Technology
A' Design Award Rino Winner in Karetao Category
- 21,388
- Verified Award Winner
- Verify Award Status for #170950
The Design
About Drawor Ko te Pūnaha Whakatakoto Hanganga
Ko Drawor he pūnaha whakatakoto hanganga i hangaia mo te tohu wāhi aunoa. Ko te pūnaha Drawor e whakakotahi ana i tētahi drone, tētahi karetao whakatakoto me tētahi tūranga ōkiko kotahi ki roto i te tukanga mahi mamati kotahi. Ko te drone e kawe ana i te karetao me te tūranga ōkiko ki te wāhi mahi. Ka whakatakotoria e te karetao ngā taputapu, ā, ka tīmata te tukanga whakatakoto. Ko te hangarau ara-rua hihiko e hono ana i te tūranga ōkiko ki tētahi puatiki e mau ana ki runga i te drone, nā reira kāore ngā ārai e ārai ana i te aro tirohanga. Ka eke te tika ki te taumata mirimita me te whakaiti o te mahi ā-ringa. I hangaia te pūnaha mo ngā taiao hanganga matatini.
The Recognition
About the A' Design Award Rino
Ko Drawor Ko te Pūnaha Whakatakoto Hanganga te toa o te A' Design Award Rino, he whakaaetanga whai mana e hoatu ana ki ngā hoahoa pai e whakatutuki ana i ngā hiahia ngaio me te ahumahi e tūmanakohia ana mai i ngā mahi kua hoahoatia pai. Ko ngā toa Rino e whakaatu ana i te pukenga nui, te tohungatanga teitei, te māramatanga mātanga me te kaha auaha o ō rātou kaihanga. E tūmanakohia ana ko Drawor Ko te Pūnaha Whakatakoto Hanganga he mahi whakanuia, whakamīharotia, aroha nui, he whaihua, he auaha hoki. Ko tēnei hoahoa i toa i te Rino e whakakotahi ana i ngā tikanga pai rawa o te ahumahi, ā, he āhuatanga hangarau pūkenga tōna e hono ana ki te mōhio me te pūmanawa. E whakahonoretia ana a Drawor Ko te Pūnaha Whakatakoto Hanganga mō tōna tōtika, ā, i hoahoatia hei whakapai ake i te kounga o te oranga me te āwhina i te ao kia pai ake.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The Drawor Construction Layout System is an intelligent unmanned solution that combines a drone, layout robot and total station for intelligent digital collaboration. The drone transports the robot to the site, where it deploys the total station and starts the layout. It uses dynamic dual-track parallel technology and drone-mounted prisms to solve visibility issues caused by obstacles during layout, achieving millimetre-level accuracy. It improves layout accuracy/efficiency, cuts costs, and adapts to complex environments.
- Dimensions & Packaging
- Dimensions (W mm x D mm x H mm)
Layout robot: 697 x 396 x 190
Drone (including propeller): 1041 x 661 x 134
Total station: 125 x 106 x 303 - Tags
- Construction layout, line-marking robot, total station, UAV deployment, unmanned construction, dynamic dual-track technology, digital construction
- Production Technology
- Drawor construction layout system integrates four core technologies: dual-track dynamic measurement, electric permanent magnet suction cup, laser SLAM navigation, and 5G real-time control to achieve millimetre-level accuracy. It adopts advanced materials such as carbon fibre drones and aerospace aluminium alloy robots to improve construction efficiency and measurement accuracy, and supports digital intelligent construction under complex working conditions.
- Design Challenge
- The challenge of this project is to achieve an intelligent and integrated technological breakthrough in the traditional construction layout model while ensuring system stability and feasibility. From a creative point of view, the goal is to break through the limitations of traditional construction layout equipment that operates independently and relies heavily on manual labour, and to design an efficient and precise solution that adapts to complex construction environments.
- Research
- This study focuses on unmanned and intelligent construction layout and optimises the plan through experiments and field tests. Dynamic dual-track technology breaks through visibility limitations, enables millimetre-level positioning of unmanned aircraft in collaboration with robots, reduces human intervention, enhances adaptability to complex environments, improves accuracy and efficiency, and reduces safety risks.
- Inspiration
- The construction industry is currently undergoing a profound change towards unmanned and automated development, and the traditional form of construction layout has been difficult to meet the high requirements of modern engineering for precision, efficiency and safety. Manual layout has the problems of large error and low efficiency, requiring workers to carry and work on multiple equipments at the same time, which is a cumbersome process and difficult to locate accurately in the complex construction environment.
- Project Duration
- The project begins in March 2024 at the BIT campus and ends in February 2025 at the campus.
- Operation Flow
- The Drawor system achieves efficient building automation line drawing solution through automated collaboration. Drones accurately deliver laying robots and total stations to the site, and the robots autonomously deploy and initiate the laying process. The dynamic dual track technology ensures real-time linkage between the total station and the drone prism, breaking through line of sight limitations and achieving millimeter level positioning. Reduce manual intervention and improve efficiency and accuracy.
- Team Members
- Huaibo Zhu
Ziteng Li
Weihan Chen
Tian Yuan
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.