Tobb Technopark Campus Технолошки парк

by A Tasarim Architect

  • Сребрена награда A' Design Award 2026 in Недвижнини
  • CLIENT: A Tasarim Mimarlik
  • Estimated Number of Design Views: 12,210
  • Verification code 282E4382C1 · Verify this award
Email this page

Colors

About Tobb Technopark Campus Технолошки парк

Кампусот Тобб Технопарк е комплекс за истражување и развој лоциран во рамките на кампусот Тобб Ету во Анкара. Дизајнот се состои од два блока поврзани со централен атриум на приземното ниво и преку подземните нивоа. Лабораториите, работилниците, паркингот и техничките простории ги зафаќаат подземните нивоа, додека горните катови содржат флексибилни простори за истражување и развој. Пет влезови поставени на различни нивоа овозможуваат пристап низ теренот со наклон. Распоредот ги отвора работните простори кон дневната светлина и соседниот градски парк, поддржувајќи интеракција и размена на знаење.

About the Сребрена награда A' Design Award

Tobb Technopark Campus Технолошки парк е добитник на Сребрената награда A' Design Award, извонредно престижно признание што се доделува на врвни, прекрасни и импресивни дизајни. Сребрените добитници се исклучително бриљантни и многу креативни дела што ја покажуваат одличната стручност, талентот и проникливоста на нивните дизајнери. Се очекува Tobb Technopark Campus Технолошки парк да биде прекрасно, примерно, извонредно професионално и длабоко иновативно дело. Овој дизајн со Сребрена награда е значаен, восхитуван пронајдок што придонесува за поместување на границите на уметноста, науката, дизајнот и технологијата. Tobb Technopark Campus Технолошки парк е творба на која многумина и завидуваат, која ги буди желбите, носи позитивни чувства и предизвикува восхит и чудење.

Press Kit

Unique Properties
The project is conceived as an integrated and adaptive system that supports continuous knowledge production, innovation and collaboration. It is defined by a clear and rational spatial organization, flexibility for future expansion, and a strong emphasis on sustainability and user-oriented functionality. The design balances technical efficiency with spatial quality, creating an environment that encourages creativity, interaction and high-performance research and development activities. Through its adaptable structure and efficient planning approach, the project responds to evolving technological needs while maintaining a cohesive and accessible architectural identity.
Dimensions & Packaging
The Tobb Etu Technopark is developed on a 30,000 sqm site and consists of two basement levels, a ground floor accessible from three different elevations, and six upper floors. The project is organized into two main blocks, Block A and Block B, which are interconnected through a central atrium at ground level and through the basement levels. Each block has a typical floor plate of approximately 4,000 sqm, resulting in a total gross construction area of 120,000 sqm. The basement levels accommodate laboratories, workshops, parking and technical spaces, with a clear height of 6.00 meters, while the upper floors dedicated to R&D functions have a floor height of 4.20 meters.
Tags
Research and Development, Technopark, Innovation, Courtyard, Landscape, Office, Laboratory, Campus
Production Technology
During the design of the Tobb Etu Technopark, comprehensive site analyses were conducted, taking into account topography, elevation differences, surrounding transportation networks, and pedestrian and vehicular circulation. A continuous ring road was introduced within the campus to provide access to all façades for both vehicles and pedestrians, while multiple entry points were defined at different levels to ensure seamless connectivity. Five main entrances were strategically positioned to facilitate clear and efficient access to the building. Vertical circulation systems were designed to enable the movement of users, materials, and service functions across all floors. The project establishes a strong relationship with the adjacent 30 Agustos City Park, allowing direct access from ground-level spaces and orienting work environments toward the landscape.
Design Challenge
The primary challenge of the design process was to achieve a coherent integration between a large-scale, high-density technopark program and the site’s complex physical and contextual conditions. The project required balancing advanced technological infrastructure with environmental sensitivity, while responding to significant topographical variations and multi-level access requirements.

Internally, the challenge involved aligning the evolving needs of research, innovation and flexible work environments with the academic and social character of the university campus. Externally, zoning regulations, laboratory requirements, construction constraints and multidisciplinary coordination played a critical role in shaping the design decisions. Addressing these conditions required an iterative and research-driven approach, combining spatial flexibility, efficient circulation strategies and sustainable design principles to create an adaptable and future-oriented environment.
Research
This study presents the design and development process of the Tobb Etu Technopark, a 120,000 sqm science and technology facility located within the Tobb Etu Campus in Ankara. Conceived as a nature-integrated innovation environment, the project establishes a continuous relationship between the built form and the adjacent 30 Agustos City Park, promoting user well-being, creativity, and a collaborative research culture.

Comprehensive site analyses, including topography, multi-level access strategies, and pedestrian–vehicular circulation, informed the spatial organization. The development consists of two interconnected blocks structured around a central atrium, with flexible floor plates designed to accommodate R&D centers, laboratories, and workshops. High-clearance basement levels support technical and laboratory functions, while vertically integrated circulation systems enable efficient movement of people, materials, and services.

The study demonstrates how integrated planning, environmental sensitivity, and infrastructural flexibility can collectively support continuous knowledge production and innovation within contemporary technopark design.
Inspiration
The inspiration behind the design is the idea of creating a technology-focused environment integrated with nature. The project aims to establish a balanced and continuous relationship between the built environment and the natural landscape. Natural light, green spaces and open areas are considered integral components of the design, fostering an atmosphere that enhances creativity, productivity and interaction. The design follows a holistic approach that addresses both technological advancement and environmental sensitivity, encouraging innovation through a strong connection between users, space and nature.
Project Duration
The project, with a total construction area of 120,000 sqm on a 30,000 sqm site, is located within the Tobb Etu Campus in Yenimahalle, Ankara. The design process commenced on 21 February 2025 and was completed on 9 September 2025.
Operation Flow
The project was developed through an intensive and collaborative design process involving a multidisciplinary team of approximately 50 professionals, including consultants. The spatial organization supports clear and efficient circulation, enabling smooth interaction between different functional areas. The layout promotes accessibility, connectivity and user engagement, allowing seamless movement across the building while encouraging collaboration and knowledge exchange.