Emas Seni Bina · 2025
Stacked Crystal Form Bangunan Pejabat dan Kilang
- A' Design Award Emas 2025 in Seni Bina
- CLIENT: Daishinku Corp
- Estimated Number of Design Views: 83,022
- Verification code CA1F6A5976 · Verify this award
Colors
About Stacked Crystal Form Bangunan Pejabat dan Kilang
Stacked Crystal Form ialah sebuah bangunan pejabat dan kilang yang menggabungkan fungsi ibu pejabat dan pengeluaran dalam satu kilang pintar. Bahagian luar bangunan terdiri daripada isipadu segi empat tepat berlapis dengan ketebalan yang berbeza-beza, diilhamkan daripada cip kristal yang bertindan. Motif yang sama diteruskan di dalam bangunan. Setiap tingkat disusun mengelilingi atrium pusat, dan tingkap bumbung membawa cahaya semula jadi ke setiap aras, menyokong keterbukaan dan hubungan antara pekerja. Pencahayaan garisan mengikut sudut potongan cip kristal. Bangunan ini mempunyai lima tingkat dan struktur kerangka keluli.
About the A' Design Award Emas
Stacked Crystal Form Bangunan Pejabat dan Kilang ialah pemenang A' Design Award Emas, pengiktirafan yang amat berprestij yang dianugerahkan kepada reka bentuk kelas pertama, menakjubkan dan cemerlang. Pemenang Emas ialah ciptaan yang sangat inovatif, berwawasan dan berkilau memukau yang mencerminkan kegeniusan, kebijaksanaan dan kepakaran pereka bentuknya. Stacked Crystal Form Bangunan Pejabat dan Kilang diharapkan menjadi ciptaan yang sangat dipuji, perintis aliran dan monumental yang memberikan nilai tanpa tandingan. Reka bentuk pemenang A' Design Award Emas ini ialah projek yang menakjubkan dan disegani yang memberi manfaat besar kepada dan memajukan batas seni, sains, reka bentuk dan teknologi. Stacked Crystal Form Bangunan Pejabat dan Kilang mencetuskan perasaan keinginan yang kuat, membangkitkan semangat, menggalakkan kreativiti dan memukau kita.
Press Kit
- Unique Properties
- This project integrates Daishinku’s head office and production functions into a smart factory. The exterior design is inspired by stacked crystal chips, with layered rectangular volumes of varying thicknesses representing Daishinku’s history of technological advancement and its future growth. The shifting shadows created by the random arrangement of these volumes recall how crystal subtly deforms under pressure and temperature changes, yet retains a stable frequency.
- Dimensions & Packaging
- Site Area: 17,225.61 square meter
Building Area: 3,563.18 square meter
Total Floor Area: 10,243.16 square meter
Number of Floors: 5 above ground
Maximum Height: 27.73 m
1st Floor Height: 5.4 m
2nd Floor Height: 5.1 m
3rd Floor Height: 4.5 m
4th Floor Height: 4.5 m
5th Floor Height: 4.4 m
Structure: Steel Frame - Tags
- architecture, office, lighting design, smart factory, quartz device
- Production Technology
- The office building's lighting design is inspired by the angle of crystal chip cuts. The thickness of a chip determines its resonant frequency, while the angle affects its stability. Based on the 35.15-degrees AT-cut, 38-degrees CT-cut, and 52-degrees DT-cut, the line lighting incorporates these angles to create an innovative lighting environment that embodies the identity of Daishinku. The design integrates circadian rhythm-based color temperature variations to enhance intellectual productivity.
- Design Challenge
- Just as a quartz chip’s thickness and angle define its frequency characteristics, the architecture was designed by layering volumes of varying thicknesses. This innovative approach integrates technology and design, creating a space that embodies the brand of Daishinku.
- Research
- Research Objective: Integrating smart factory concepts with architectural design.
Result: The spatial design reflects the thickness and angle of quartz chips, visualizing the identity of Daishinku.
Impact: This innovative approach enhances energy efficiency and intellectual productivity. - Inspiration
- Just as the thickness and angle of a crystal chip determine its specific frequency, the architecture layers volumes of varying thicknesses to shape the space. Inspired by the physical properties of crystal, the design extends the motif of stacked crystal chips throughout the building’s exterior and interior, visualizing the identity of Daishinku. The integration of architecture, interior, and lighting design creates a space where technology and design harmonize.
- Project Duration
- This project was completed in 2024 and is currently in operation. The construction site is located in Kakogawa, Hyogo, adjacent to Daishinkuʼs existing Central Laboratory. Designed as a smart factory, it integrates advanced production systems and energy-efficient technologies to minimize environmental impact.
- Operation Flow
- This project is a smart factory that integrates Daishinku’s advanced technology with innovative design. Each floor is organized around an atrium pierced through the center, with natural light from the skylight spreading across each layer. This not only enhances energy efficiency and openness but also stimulates encounters and communication among workers on different floors.
- Patents
- N/A
- Image Credits
- Image #1-#5: Photographer Nobuaki Miyashita, Variations, 2024