Skip to content
Hours on the Slope Fabbrika, Bini tal-Uffiċċji by T.E and C Architects Associates

Hours on the Slope Fabbrika, Bini tal-Uffiċċji by T.E and C Architects Associates is a highly esteemed winner of the very prestigious 2021 Premju A' Design Award tal-Bronż in Disinn tal-Arkitettura, Bini u Strutturi Competition Category.


BronżArkitettura· 2021

Hours on the Slope Fabbrika, Bini tal-Uffiċċji

by T.E and C Architects Associates

Client: T.E and C Architects Associates

Premju A' Design Award tal-Bronż Winner in Arkitettura Category

10,487

Verified Award Winner

Verify Award Status for #106869

Colors

The Design

About Hours on the Slope Fabbrika, Bini tal-Uffiċċji

Sigħat fuq l-Għoli hija kumpless ta' fabbrika u uffiċċji f'Taichung, it-Tajwan. Is-sit huwa maqsum fi tliet bini organizzati skont l-ambjent u l-orjentazzjoni. Fuq in-naħa tal-punent, fejn l-espożizzjoni għax-xemx hija għolja, twieqi skuri u erja mnaqqsa tat-twieqi jenfasizzaw is-sens ta' volum. Granit u sistema ta' kisi ekoloġika tal-bini jkopru l-ħitan esterni. Mosajk tal-ġebel naturali intgħażel għall-uċuħ mgħawweġ tal-bini tal-uffiċċji. Sistema ta' pajpijiet mdfuna tiggwida l-arja friska ta' barra ġewwa l-impjant, filwaqt li l-pannelli solari fuq il-bejt jagħtu d-dell lill-erja tal-parkeġġ fl-aħħar sular.

The Recognition

About the Premju A' Design Award tal-Bronż

Hours on the Slope Fabbrika, Bini tal-Uffiċċji huwa rebbieħ tal-Premju A' Design Award tal-Bronż, rikonoxximent prestiġjuż ħafna mogħti lil disinji eċċellenti ddistingwuti mill-kreattività, l-ingenwità u l-għaqal. Ir-rebbieħa tal-Bronż huma xogħlijiet bi ħila biżżejjed u kreattivi b'mod impressjonanti li jawtentikaw l-esperjenza vasta, l-immaġinazzjoni u l-ħila ta' riżorsi tad-disinjaturi tagħhom. Huwa mistenni li Hours on the Slope Fabbrika, Bini tal-Uffiċċji ikun oġġett imqabbar ħafna, mammirat u maħbub, notevolment professjonali u innovattiv. Dan id-disinn rebbieħ tal-Bronż jinkorporaw l-aħjar prattiki fl-arti, ix-xjenza, id-disinn u t-teknoloġija u huwa eċċellenti fl-attenzjoni għad-dettalji. Hours on the Slope Fabbrika, Bini tal-Uffiċċji jissodisfa l-ħtiġijiet b'mod eċċellenti, imiss ix-xewqat, jinċanta s-sentimenti u jattira l-kurżità.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
Dimensions & Packaging
The project is 63767 square meter.
Tags
Architecture, Factory, Office, Plant, Building
Production Technology
The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
Design Challenge
This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
Research
A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
Inspiration
The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
Project Duration
The project finished in December 2018 in Taichung, Taiwan.
Operation Flow
The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
Team Members
Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang
Image Credits
Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

The A' Design Award is an international, juried accolade for good design. Take part in the A' Design Award to get an opportunity to earn meritocratic recognition, gain fame, prestige and publicity for your work. Nominate your work for the A' Design Award and compete for the coveted A' Design Prize.

Nominate