Bronż Interjur · 2025
Hakuten Kyobashi Disinn Intern tal-Uffiċċju
- Premju A' Design Award tal-Bronż 2025 in Interjur
- CLIENT: Hakuten
- Estimated Number of Design Views: 10,548
- Verification code 9E11F60C50 · Verify this award
Colors
About Hakuten Kyobashi Disinn Intern tal-Uffiċċju
Hakuten Kyobashi huwa disinn intern tal-uffiċċju maħluq għal kumpanija tad-disinn tal-komunikazzjoni. L-ispazju jkejjel 2,400 metru kwadru u jservi 400 impjegat permezz ta' sistema ta' indirizz liberu. L-ispazji ħielsa jiffurmaw il-qofol taż-żonizzazzjoni, u kull tagħmir huwa mobbli, b'manek, kapaċità li jitqiegħdu fuq xulxin u roti (casters). L-art tal-injam taż-żona tal-kafetterija tista' titneħħa biċċa biċċa. Il-mudelli grafiċi fuq l-art jaġixxu bħala skala għal wirjiet li jinbidlu. Parti mid-disinn intern tal-kerrej ta' qabel inżammet u ngħaqdet max-xogħol il-ġdid biex jiġi limitat it-tkissir u tinżamm il-memorja.
About the Premju A' Design Award tal-Bronż
Hakuten Kyobashi Disinn Intern tal-Uffiċċju huwa rebbieħ tal-Premju A' Design Award tal-Bronż, rikonoxximent prestiġjuż ħafna mogħti lil disinji eċċellenti ddistingwuti mill-kreattività, l-ingenwità u l-għaqal. Ir-rebbieħa tal-Bronż huma xogħlijiet bi ħila biżżejjed u kreattivi b'mod impressjonanti li jawtentikaw l-esperjenza vasta, l-immaġinazzjoni u l-ħila ta' riżorsi tad-disinjaturi tagħhom. Huwa mistenni li Hakuten Kyobashi Disinn Intern tal-Uffiċċju ikun oġġett imqabbar ħafna, mammirat u maħbub, notevolment professjonali u innovattiv. Dan id-disinn rebbieħ tal-Bronż jinkorporaw l-aħjar prattiki fl-arti, ix-xjenza, id-disinn u t-teknoloġija u huwa eċċellenti fl-attenzjoni għad-dettalji. Hakuten Kyobashi Disinn Intern tal-Uffiċċju jissodisfa l-ħtiġijiet b'mod eċċellenti, imiss ix-xewqat, jinċanta s-sentimenti u jattira l-kurżità.
Press Kit
- Unique Properties
- As a communication design company, at the core of the office zoning are various free spaces that stimulate the imagination of the scene in which they are used, rather than being imposed by the current era. Everything that is placed is movable, and events are held regularly to create a space that continues to change. In terms of the environment, the lean design solves the problems of Japanese office design.
- Dimensions & Packaging
- 400 employees work in a 2,400 sq. m. space utilizing a free address system.
- Tags
- office, spacedesign, workspace, movable furniture, reception
- Production Technology
- All fixtures are movable and have handles and stacking capabilities as well as casters.
The wooden flooring in the cafe zone is removable piece by piece, combining the comfort of a comfortable environment with the advantages of a changeable temporary space.
Graphic patterns are applied to the floor at regular intervals as a scale for changing exhibits. - Design Challenge
- Free space is difficult to use if everything is free. We challenged ourselves to create comfortable limitations.
We also decided what to keep from the old office while retaining some of the old tenant space.
We challenged ourselves to remake both the space and the products, not only for environmental friendliness, but also to pass on memories and culture. - Research
- In our survey of urban offices, we found that almost all tenants sign a contract for an office with all new space and then tear down all its finishes, demolishing and refinishing the interior twice.
This is a bad business practice and a contractual problem in Japan.
Furthermore, we found that although recently there has been an increase in designs that preserve the existing environment out of environmental considerations, offices are the only area that has not been improved at all. - Inspiration
- It is true that today's urban offices are required to be more comfortable and perform better, which is why they are often dismantled from the standard specifications that were cleaned up by the restoration work associated with the contract of the former tenants.
This time, we took over part of the former tenant's interior and took on the challenge of rethinking standard specifications that, while functional, tended to look old and shunned, and integrating them with the new space. - Project Duration
- Project starts in spring 2023, construction completed in spring 2024.
- Operation Flow
- An office task force manages the place, and anyone can easily remake the space.
During the day, dozens of people meet openly in the morning.
In the afternoon, the space is used as an exhibition and cafe space for communication.
At night, it is constantly changing as a bar time, where a different kind of communication occurs. - Image Credits
- Image #1~5: Photographer Daisuke Shima,2024