Tlanāhuatīlli Kwsa Tepamitl Molinia ītēchcopa Leva Engineering cē cencā mahuizzō tēmacēhualōni īpan huēyi 2025 Mahuizolli A' Design Award Iztacteocuitlatl īpan Tlatlaliliztli Tlachihchihualiztli Nēhuilīztli Tlamantli.
IztacteocuitlatlTlatlaliliztli· 2025
Kwsa Tepamitl Molinia
īpal Leva Engineering
Tlanāhuatīlli: Leva Engineering
Mahuizolli A' Design Award Iztacteocuitlatl Tēmacēhualōni īpan Tlatlaliliztli Tlamantli
Tlaneltīlīlli Tēmacēhualōni
Xictlaneltilia Tēmacēhualli ītēchcopa #172468Tlanēxtilistli
Ītechcopa Kwsa Tepamitl Molinia
Kwsa se tepamitl tlen molinia, tlachihualli tlen moketztok itech Aramco Innovation Center ipan Riyadh. Inin tequitl quitzacua 209 metro cuadrado ihuan mochihua ica chicuace tepamitl modular, cecen quipia 6000 mm ipatlahuaca ihuan 7000 mm ihuecapan. In olinilistli mochihua ica 20,000 motores stepper tlen quiolinia se sistema tlen tornillo ihuan palanca tlachihualli san ipampa inin tequitl, ica se precisión tlen 0.1 mm. In tlamantli tlachihualli ica tecnopolímeros tlen momachiotia inselti amo monequi lubricación ihuan quicahua ma mocalaqui tlaixpan ic mopatlaz ihuan mochipahuaz. In olinilistli tlayecantli mochihua ica video tlen nextic tlapalli, campa in tlanextli ipatiuh quiixnextia quenin miac molinia.
Tēixīmachōtiliztli
Ītechcopa Mahuizolli A' Design Award Iztacteocuitlatl
Kwsa Tepamitl Molinia ca in quicuic in Mahuizolli A' Design Award Iztacteocuitlatl, hueyi tlamahuizoliztli tlen momaca in huel yectli, tlanextic ihuan mahuiztic tlachihualli. In quicuicah Iztacteocuitlatl ca cenca cualli ihuan cenca yancuic tlachihualli in quinextia in tlamatiliztli, toltecayotl ihuan ixtlamatiliztli intlachihuanime. Ca quinequi in Kwsa Tepamitl Molinia ca cenca cualli, cenca motequiuhtia ihuan yancuic. Ni dizayno in quicuic Iztacteocuitlatl quihuelitia in toltecayotl, tlamatiliztli, dizayno ihuan teknolohia. Kwsa Tepamitl Molinia quiyolchicahua in tlacah, quipaquiltia ihuan quitlamahuiztiltia.
Tlanēxtilistli Ītēixpan
Āmatl Tlanextīliztli
Tlapōhualli, tēquitqueh īwan tēchmachilīztli ōquinmaca in tlanēxtīlīlli.
- Cē Zan Ītēchcopa
- Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
- Huēyiliztli īhuān Tlacualtepēhualli
- Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required. - Tōcāitl
- Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
- Tlachīhualiztli Māchiyōtl
- The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
- Tlanāhuatīlli Nētēcahuilīztli
- A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
- Tlatēmōliztli
- This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
- Tēyōllālīliztli
- The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
- Tēquitl Cāhuitl
- The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024. - Tēquitl Ōhuitl
- The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
- Calpolli Tlācah
- Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology
Tlacōhualli
Xictlahtlachia Achi Huēca Designers.org
Xictēmoa tlanāhuatīlli, tēquitl īhuān tlanāhuatīlli ītēchcopa totlanōnōtzalcāhuān.
Ōc Cequi Tiquitta
Tlanēxtīliztli Tlanāhuatīlli
Xiquitta ōc cequi tlanēxtīliztli tēixīmachōtīlli īpan inīn tlahtlamanilistli, tlapepenalli ītechcopa īnqualli.