Hours on the Slope Fabrikk, Kontorbygg by T.E and C Architects Associates is a highly esteemed winner of the very prestigious 2021 A' Design Award i Bronse in Arkitektur-, bygnings- og strukturdesign Competition Category.


BronseArkitektur· 2021

Hours on the Slope Fabrikk, Kontorbygg

by T.E and C Architects Associates

Client: T.E and C Architects Associates

A' Design Award i Bronse Winner in Arkitektur Category

Colors

Email this page

The Design

About Hours on the Slope Fabrikk, Kontorbygg

Hours on the Slope er et fabrikk- og kontorkompleks i Taichung, Taiwan. Tomten er delt inn i tre bygninger som er plassert i tråd med omgivelsene og himmelretningen. På vestsiden, hvor solpåvirkningen er høy, fremhever mørke vinduer og reduserte vindusarealer følelsen av volum. Granitt og et grønt bygningsbelegg dekker yttervegger. Naturstein-mosaikk ble valgt for den buede overflaten på kontorbygningen. Et nedgravd rørsystem leder kjølig uteluft inn i anlegget, og solcellepaneler på taket skygger for parkeringsarealet i øverste etasje.

The Recognition

About the A' Design Award i Bronse

Hours on the Slope Fabrikk, Kontorbygg er vinner av A' Design Award i Bronse, en høyt prestisjefylt anerkjennelse som tildeles enestående design som utmerker seg ved kreativitet, oppfinnsomhet og skarpsindighet. Bronsevinnere er rikt dyktige og påfallende kreative gjenstander som bekrefter designernes store erfaring, fantasi og ressurssterkhet. Hours on the Slope Fabrikk, Kontorbygg forventes å være en høyt ansett, beundret og verdsatt gjenstand som er bemerkelsesverdig profesjonell og nyskapende. Dette designet, som har vunnet A' Design Award i Bronse, rommer beste praksis innen kunst, vitenskap, design og teknologi og utmerker seg ved sin omtanke for detaljer. Hours on the Slope Fabrikk, Kontorbygg tilfredsstiller behov på en strålende måte, berører ønsker, sjarmerer følelser og vekker nysgjerrighet.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
The entire area is mainly divided into three buildings, while the design takes into consideration the relationship between the environment and the direction, adopting dark windows while reducing window area in ordered arrangement on the west side with excessive sun exposure to highlight the sense of volume.
Dimensions & Packaging
The project is 63767 square meter.
Tags
Architecture, Factory, Office, Plant, Building
Production Technology
The factory plant with the largest area has adopted the coating system with the Green Building Mark, which contains no formaldehyde, TVOC volatile organic compounds, and hazardous substances; moreover, it is a coating system featuring low-carbon-footprint, no excessive external wall decorative wastes…etc. Due to the characteristics of the coating system such as gapless and low water absorption, etc., it can clean itself when the rain pours, making it easy to maintain.
Design Challenge
This project has also set up a rainwater recycling pool, collecting roof water for watering potted plants, it further set up an eco-pool in the alfresco retracted 20m of greenbelt, establishing water recirculation system to proceed with the conditioning of the microclimate inside the base.
Research
A large area of approximately 12,250 m2 of solar energy layout is placed on top of the roof, where besides conducting solar energy power generation, it can also act as a heat insulator for the parking lot on the top floor. The design also placed the air-conditioned factory plant underneath the parking lot, capable of completely blocking off the roof heat transmission caused by the large roof, thereby decreasing the air-conditioning energy consumption.
Inspiration
The main materials for the external wall include granite and green building coating system. To create the rock solid spirit of the enterprise and the fusion with the environment, the office building selected natural stone for the mosaic on the curved surface.
Project Duration
The project finished in December 2018 in Taichung, Taiwan.
Operation Flow
The main factory plant section is air-conditioned with the special arrangement of buried pipeline wind-guiding system, which guides in the external air at a lower temperature from the inlet/outlet on the north side together with potted plant section via the particular height difference of this base, which then cools the temperature down via the deep soil 10m underground, thereby accessing outdoor fresh air for air-conditioner cooling and exchange through the most natural cooling approach.
Team Members
Design Director: Wen Tong Hsieh
Designer: Kang Cheng Liu
Yung Chi Huang
Sheng Xiang Lin
Cheng-Tsung Chen
Ming-Hsing Su
Pei-Yu Lin
Yu-Chien Huang
Image Credits
Image #1-5: Photographer Pei Yu Lin, Hours on the Slope, 2019.

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate