Skip to content
Hangar Renovation Museumsinnredning by Piotr Pyrtek
Hangar Renovation Museumsinnredning by Piotr Pyrtek
Hangar Renovation Museumsinnredning by Piotr Pyrtek
Hangar Renovation Museumsinnredning by Piotr Pyrtek
Hangar Renovation Museumsinnredning by Piotr Pyrtek

Jern Interiør · 2023

Hangar Renovation Museumsinnredning

by Piotr Pyrtek

  • A' Design Award i Jern 2023 in Interiør
  • CLIENT: Ekotektura
  • Estimated Number of Design Views: 10,926
  • Verification code 576837B271 · Verify this award
Email this page

Colors

About Hangar Renovation Museumsinnredning

Hangarrenovering er en museumsinnredning skapt inne i en historisk flyhangar. Museet presenterer ingeniørkunst og teknologi, og lokalet er også vertskap for arrangementer og forestillinger. De nye interiørelementene følger en industriell stil knyttet til hangarens opprinnelige bruk. En mesanin med en åpen gitterkonstruksjon er hevet tre meter over gulvet. Mesaninen er plassert i avstand fra yttervegger for å bevare den opprinnelige bygningen. Stål, tegl, betong og tre er tatt i bruk. De gamle varmeovnene og deres installasjon er restaurert og vises frem til besøkende.

About the A' Design Award i Jern

Hangar Renovation Museumsinnredning er vinner av A' Design Award i Jern, en prestisjefylt anerkjennelse som tildeles gode design som oppfyller de profesjonelle og industrielle kravene man forventer av veldesignede skaperverk. Jernvinnere viser stor dyktighet, høy spesialisering, ekspertforståelse og kreativ kapasitet hos skaperne. Hangar Renovation Museumsinnredning forventes å være et høyt ansett, beundret og verdsatt skaperverk som er praktisk og nyskapende. Dette designet, som har vunnet A' Design Award i Jern, integrerer bransjens beste praksis og har kompetente tekniske egenskaper knyttet til kunnskap og talent. Hangar Renovation Museumsinnredning respekteres for sin grundighet og er utformet for å gi forbedringer i livskvalitet som bidrar til å gjøre verden til et bedre sted.

Press Kit

Unique Properties
The very design of the new interior elements has been kept in the industrial convention, which is directly associated with the original function of the Hangar. The designed mezzanine is nothing more than a bridge structure, whose expressive lattice structure catches the eye. Elevated 3m above the ground, the mezzanine was deliberately erected at a certain distance from the building's exterior walls, so as to preserve as much of the building's originality as possible.
Dimensions & Packaging
Historic aircraft hangar:
- Designed building area - 2312.39 m2
- Building height - hangar - 10.52m
- Width of the hangar building - 40,64m
- Length of the hangar building - 66,88m
- Number of above-ground floors - 1
- Number of underground floors - hangar - 1
- Volume of the hangar - 21.096 m3

Boiler room:
- Designed building area - 185,88 m2
- Building height - 7.31m
- Building width - 9.50m
- Length of the building - 19.50m
- Number of above-ground floors - 1
- Number of underground floors - 1
- Cubic capacity - 991.6 m3
Tags
Hangar, Hangar Czyżyny, Hangar Kraków, Hangar MiT, Hangar museum
Production Technology
During the design process, we placed great emphasis on period materials, mainly because the project largely involved reconstruction, or reproduction of the original character. Also when creating new elements, we tried to use materials that could have been used almost a century ago - steel, brick, concrete, wood. Even though the design of some of the interior elements seems to be contemporary, the materials used in producing them are definitely classic.
Design Challenge
The most difficult part of the project was combining the historical elements of the hangar with the new elements, which had to be stylistically adapted to each other due to their contemporary nature and technical requirements.
Research
The project was preceded by an in-depth architectural study of historical studies of this particular hangar, but also of other hangars from this period. Also, extensive research of the city archives helped to establish the final design guidelines and to proceed with the development of the documentation. All new elements that emerged at the concept stage and later in the construction project resulted directly or indirectly from the research. The entire study was agreed on an ongoing basis with the City Historic Preservation Officer and under his strict protection.
Inspiration
The historic aircraft hangar has been converted into a museum of engineering and technology. The interior has been maintained in the chrakter of the era, and the created space will be ideal for both the exposition of automotive objects, but also for the organization of various events and spectacles, as was the case at the last Sacrum Profanum in Krakow.
Project Duration
The project will begin in December 2017 and end in 2019. Construction continued until mid-2022.