Siyang Xu

Acoustic Cable Deicing Robot is a conceptual robot designed to remove ice from power cables after snowstorms. The device is mounted directly on the cable. A cylindrical heating ring inside the robot gradually warms the cable surface until the ice melts. An anti-freezing material on the outer layer prevents ice from forming again. Closed switches on both sides keep the robot attached during work. A manual interface and a mobile application let the operator preset tasks and follow progress. The robot is intended to replace manual deicing at height and reduce risk for workers.

Press Kit

Unique Properties
This is an intelligent robot that works after natural disasters.
When the snowstorm freezes the cable's outer layer in the city, the intelligent device can be used to remove the ice. The cylindrical heating ring in the middle of the deicing robot gradually heats up the cable's outer layer, and the outer layer of the cable is filled with frozen maintenance material to prevent the secondary freezing of the cable.
Dimensions & Packaging
The equipment is 310 mm long, 150 mm wide and 150 mm high.
Inner cylinder diameter 15-45 mm (adjustable according to cable diameter)
Tags
Intelligence, deicing, robot, controllable, solar energy, protection
Production Technology
High manganese steel is a high-metal material, and composite metal chromium fusion, hard and rust-proof. Titanium plating Technology can be used to enhance Surface friction
Design Challenge
It is difficult to search for deicing solutions in various countries in the process. The feedback of these programs varies greatly, and the starting point of the design should also take into account the degree of scientific and technological development of the country and whether the public can accept the arrival of new technology.
There are many disputes in the selection of materials, the materials of the equipment should take into account both high temperature and low temperature resistance, and work in different environments.
The data of cable diameter also varies from country to country, and the authors design an adjustable width of the inner diameter.
Project Duration
The design plan begins in March 2019 and ends in November 2020 in the United States.
Operation Flow
There is a symmetrical closed switch on the left and right sides of the device, which is manually used to prevent the robot from automatically opening and falling off from the cable while it is working.
One side of the robot has a manual interface on which users can preset their work.
Secondly, the deicing robot also has control of the APP.
The operator can check the progress of the equipment on APP.
If the equipment is damaged, the user can stop the robot from working in time and rush to repair it.
In the working state, the equipment will flash orange light to prevent other organisms' interference, and the color can be set on its own.
Research
The design is a conceptual design to solve the problem of production recovery under natural disasters.
The author hopes to improve the urban recovery after the snowstorm through this design.
Power outages occur in most cities after a snowstorm.
In the design process with the team members of multi-country questionnaires and disaster inquiries. These data reflect how different countries deal with the removal of cable ice. The purpose of the design is to improve some workers who work at height and reduce the risk factor at work.
Inspiration
In some extremely cold areas of various countries, power transmission is lost every year because a snowstorm freezes the cable. Let many cities into the paralysis without electricity.
And the handling of ice has always been done manually, so it is hazardous to work in the cold high air. A cable with a distance of 10 meters often takes workers 3-4 hours to clean.
Image Credits
image #1:Siyang Xu,image #2:Siyang Xu,image #3:Siyang Xu,image #3:Siyang Xu
Patents
No patent

Press releases are available in 1 languages.

Email this page to a friend

Good Design Deserves Great Recognition

Discover A' Design Award, World's Largest Design Accolade.

Learn More