Skip to content
Heito 1909 Bypark by ECG International Landscape Consultants
Heito 1909 Bypark by ECG International Landscape Consultants
Heito 1909 Bypark by ECG International Landscape Consultants
Heito 1909 Bypark by ECG International Landscape Consultants
Heito 1909 Bypark by ECG International Landscape Consultants

Sølv Byplanlegging · 2021

Heito 1909 Bypark

by ECG International Landscape Consultants

  • A' Design Award i Sølv 2021 in Byplanlegging
  • CLIENT: Pingtung County Government, Pan Men-an
  • Estimated Number of Design Views: 49,038
  • Verification code F734C33BAA · Verify this award
Email this page

Colors

About Heito 1909 Bypark

Bygninger og landområder har blitt stadig fjernet og gjenoppbygd i denne epoken, hvert prosjekt er litt av "Tabula Rasa". Transformasjon av Heito 1909 er et sjeldent prosjekt med adaptiv gjenbruk, i stedet for å være besatt av ikoniske bygninger, er alt i parken utformet som en forlengelse av ruinene. Den unike designen inkorporerer ruinene og skadede strukturer kreativt i de urbane fasilitetene for innbyggerne å oppleve. Betydelig nok gir parken et sted for folk å engasjere seg i naturmiljøer av høy kvalitet i en storby.

About the A' Design Award i Sølv

Heito 1909 Bypark er vinner av A' Design Award i Sølv, en usedvanlig prestisjefylt anerkjennelse som tildeles design i toppklassen som er nydelige og imponerende. Sølvvinnere er enormt briljante og usedvanlig kreative verk som viser designernes enestående ekspertise, talent og skarpsindighet. Heito 1909 Bypark forventes å være et praktfullt utstillingsverk som er bemerkelsesverdig profesjonelt og dypt nyskapende. Dette designet, som har vunnet A' Design Award i Sølv, er en svært bemerkelsesverdig, beundret oppfinnelse som gagner og flytter grensene for kunst, vitenskap, design og teknologi. Heito 1909 Bypark er et skaperverk mange misunner, som vekker ønsker, gir positive følelser og vekker undring og forundring.

Press Kit

Unique Properties
Heito 1909 is an urban park base on an abandon factory, the ruins of factories can trace back few important era, colonists era, world II, post war industrial era. The park is a first industrial landscape, adaptive reuse project in Taiwan. The project transforms an abandoned industrial ruin into an urban recreation space, also reform industrial polluted river, into natural habitat.
Tags
Taiwan, Pingtung, Landscape, Historical, Urban Design , cultural, waterfront
Production Technology
In the excavation we use "point cloud laser scanning" for precise mapping of historical remains, point cloud produce precise data for historical documentation and precise 3D drawing. For the historical remains we build pavilions in parametric design, and use (Rhino ,Grasshopper, sketchup ,Vectorwork ) for construction drawing, it helps with create gradual sequence. And Ecotect Environment analysis for urban planning.
Design Challenge
The ideal of historic preserved of an industrial park, is not popular for the public and public sector. Since it's old and ugly, lack of commercial value and highly maintained. So it took a while to come out with a scheme to be acceptable. Because what's left is all underground, it's difficult to anticipate every detail before excavation, so its constant revise the design solution, and experiment different approach of construction methods.
Research
During the excavation we discover the project had a rich history, but it was kept secret for a century, so a lot of research needed. The variety of historical research from US Nay WW2 record, and Japan colonist archives, industrial sugar factory documents. Just to find out the function of the historical remains, the stories had happened here. The story of this place gives us design a starting point, a way to juxtapose with the city that has become, and continue the story for the future.
Inspiration
During the excavation of the historical remains, stories of the place been reviled, we realize there is gaps in our history that’s being erased. Because historical building can’t be capitalized, so majority always been demolished. What was destroyed not just a building, but also multiple period of history, and that we were merely one tiny portion of this era that made this decision.
Project Duration
The project is based in Pingtung, Taiwan. And had two phases of design and construction, first started in June 2018 finished in 2020 January, excavation and landscape infrastructure. The second are the historical site reuse, from 2020 July finished in 2021 January.
Operation Flow
The project had an expected date to be finished, due to the uncertainty of what's underneath. It's difficult to finish in date with normal process. So it's Design and historical research while excavation, it's an overlap process constant modify the outcome.
Image Credits
Image #1: Yi-Hsien Lee and Associates
Image #2: Yi-Hsien Lee and Associates
Image #3: Yi-Hsien Lee and Associates
Image #4: Yi-Hsien Lee and Associates
Image #5: Yi-Hsien Lee and Associates

Related Designs

View All

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate