Skip to content
Acesite Park Kupanga Malo a m'Paki by Logan Group

Acesite Park Kupanga Malo a m'Paki by Logan Group is a highly esteemed winner of the very prestigious 2021 Mphoto ya Siliva ya A' Design Award in Mapangidwe a Kukonza Madera ndi Minda Competition Category.


SilivaMapangidwe a Madera· 2021

Acesite Park Kupanga Malo a m'Paki

by Logan Group

Client: Logan Group

Mphoto ya Siliva ya A' Design Award Winner in Mapangidwe a Madera Category

Colors

Email this page

The Design

About Acesite Park Kupanga Malo a m'Paki

Acesite Park ndi kapangidwe ka malo a paki ya anthu okhala ndi paki ya boma mumzinda wa Shenzhen. Pakiyi imagwiritsa ntchito njira ya mzinda wa siponji, wokhala ndi zigawo za msipu zomizidwa pansi, minda ya mvula ndi ngalande za udzu zomwe zimachepetsa liwiro ndi kusonkhanitsa madzi amvula. Poyalira pansi amagwiritsa ntchito mchenga wa silika ndi njerwa za dothi zolola madzi kudutsa, zomwe zimalola madzi kudutsa ndi kuchepetsa phokoso. Zomera ndi gawo losefera zimayeretsa madzi amvula osonkhanitsidwa kuti agwiritsidwe ntchito m'mathithi, machitidwe a nkhungu, kuthirira ndi kutsuka misewu. Malo osungiramo madzi a siponji amasunga makyubiki mita 2547.84 a madzi. Kapangidwe ka minda ya matiliyo kamapanga malo otsetsereka ndi malo otsika omwe amatsogolera kutayika kwa madzi mwapang'onopang'ono.

The Recognition

About the Mphoto ya Siliva ya A' Design Award

Acesite Park Kupanga Malo a m'Paki ndi mmodzi mwa opambana a Mphoto ya Siliva ya A' Design Award, kuzindikirika kolemekezeka modabwitsa komwe kumaperekedwa kwa mapangidwe a pamwamba, okongola ndi ochititsa chidwi. Opambana a Siliva ndi ntchito zowala kwambiri ndi zolenga kwambiri zomwe zimaonetsa ukatswiri, luso ndi nzeru zakuthwa za opanga awo. Acesite Park Kupanga Malo a m'Paki akuyembekezeka kukhala ntchito yodabwitsa yoonetsedwa, yaukatswiri wapadera ndi yatsopano kwambiri. Mapangidwe opambana Mphoto ya Siliva ya A' Design Award awa ndi chopangidwa chodziwika kwambiri ndi choyamikiridwa chomwe chimapindulitsa ndi kukulitsa malire a luso, sayansi, kapangidwe ndi ukadaulo. Acesite Park Kupanga Malo a m'Paki ndi cholengedwa chomwe anthu ambiri amachichitira nsanje, chomwe chimadzutsa zilakolako, kubweretsa maganizo abwino ndi kuyatsa kudabwa ndi chidwi.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
In order to actively respond to the national government's policy call of "low-impact development rainwater system construction", this project has vigorously promoted and implemented the "sponge city construction" technical system in the design process. Through the sunken green belt, rain garden, Glassed swale and other ecological landscape and catchment area facilities, improving the Park's ecosystem function.
Dimensions & Packaging
The water storage volume of the sponge facilities of the whole project is 2547.84 cubic meters, the total annual runoff control rate is 72%, and the pollutant reduction rate is 43%. All indicators have reached the leading level in the industry.
Tags
Landscape Design, Natural, Modern, Residence, Classical
Production Technology
The pavement of the community is paved with silica sand permeable bricks,ceramic permeable bricks and other environmental protection materials.These materials have good water permeability, pressure resistance, sound absorption and noise reduction. They work together to create a "breathing" landscape pavement, which also effectively improves the self-regulation ability of the small environment and reduces carbon dioxide emissions.
Design Challenge
The project takes "terraced fields" as the design principle,and creates a garden with slope, depression and patchwork in the landscape design, which deals with the relationship among people, land and water, and achieves the purpose of slow drainage of rainwater.The central waterscape also has the effect of water storage, creating conditions for the reuse of rainwater.
Research
This case is a large-scale complex project with private municipal park and a nine series masterpiece built by Logan Real Estate for 20 years. The TOD urban development model with light rail stations, subway transfer stations and subway stations as the core realizes efficient and mixed land use, makingthe project become the most agglomerating effect, stimulating vitality, and enhancing the value of the rich space experience and attractive urban public exchange place in Guangming New District.
Inspiration
The case hopes to use the purest natural elements to separate people who are gradually away from natural life from the busy city and return to the original nature, creating a comfortable and quiet artistic space atmosphere, showing a rich and colorful life mood, and reflecting the living atmosphere of modern East.
Project Duration
The project started in April 2016 in Shenzhen and finished in August 2019 in Shenzhen.
Operation Flow
The rich vegetation in the project and the filter layer below it purify the rainwater into recyclable water resources, and the collected and purified rainwater can be used for waterfalls, mist forest systems, plant sprinkler irrigation systems, road washing, etc. in the landscape demonstration area, which forms a good landscape ecology, and achieves water saving and emission reduction.
Patents
Copyrights belong to Logan Group, 2019.
Team Members
Huihui Wang
Song Zhang
Ni Peng
Yuyan Hu
Ming Jiang
Image Credits
Image #1: Photographer Logan Group, Acesite Park, 2019.
Image #2: Photographer Logan Group, Acesite Park, 2019.
Image #3: Photographer Logan Group, Acesite Park, 2019.
Image #4: Photographer Logan Group, Acesite Park, 2019.
Image #5: Photographer Logan Group, Acesite Park, 2019.

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate