Hangar Renovation Ntchito Yaikulu ya Kapangidwe: Kapangidwe ka Mkati mwa Nyumba Yosungiramo Zinthu Zakale by Piotr Pyrtek is a highly esteemed winner of the very prestigious 2023 Mphoto ya Chitsulo ya A' Design Award in Mapangidwe a Mkati mwa Nyumba ndi Mawonekedwe Competition Category.
ChitsuloMkati· 2023
Hangar Renovation Ntchito Yaikulu ya Kapangidwe: Kapangidwe ka Mkati mwa Nyumba Yosungiramo Zinthu Zakale
by Piotr Pyrtek
Client: Ekotektura
Mphoto ya Chitsulo ya A' Design Award Winner in Mkati Category
Verified Award Winner
Verify Award Status for #149399The Design
About Hangar Renovation Ntchito Yaikulu ya Kapangidwe: Kapangidwe ka Mkati mwa Nyumba Yosungiramo Zinthu Zakale
Malemba a Bukhu: Kukonzanso kwa Hangar ndi kapangidwe ka mkati mwa nyumba yosungiramo zinthu zakale, wopangidwa mkati mwa hangar yakale ya ndege ya mbiri yakale. Nyumba yosungiramo zinthu zakaleyi ikuwonetsa uinjiniya ndi ukadaulo, ndipo malowa amachitikanso zochitika ndi masewero. Zipangizo zatsopano za mkati zimatsatira kalembedwe ka mafakitale, kogwirizana ndi ntchito yoyambirira ya hangar. Padziwe (mezzanine) lokhala ndi njira yotseguka ya matambwe latukulidwa mamita atatu pamwamba pa pansi. Padziweli lakhazikitsidwa kutali ndi makoma akunja kuti asunge nyumba yoyambirira. Zitsulo, njerwa, konkire ndi matabwa zimagwiritsidwa ntchito. Ma sitovu akale a kutenthetsera pamodzi ndi kayikidwe kake akonzedwanso ndikuwonetsedwa kwa alendo.
The Recognition
About the Mphoto ya Chitsulo ya A' Design Award
Hangar Renovation Ntchito Yaikulu ya Kapangidwe: Kapangidwe ka Mkati mwa Nyumba Yosungiramo Zinthu Zakale ndi mmodzi mwa opambana a Mphoto ya Chitsulo ya A' Design Award, kuzindikirika kolemekezeka komwe kumaperekedwa kwa mapangidwe abwino omwe amakwaniritsa zofunika za akatswiri ndi za makampani zomwe zimayembekezeka kuchokera ku zolengedwa zopangidwa bwino. Opambana a Chitsulo amaonetsa luso lalikulu, ukatswiri wapamwamba, kumvetsetsa kwa akatswiri ndi mphamvu yolenga ya opanga awo. Hangar Renovation Ntchito Yaikulu ya Kapangidwe: Kapangidwe ka Mkati mwa Nyumba Yosungiramo Zinthu Zakale akuyembekezeka kukhala cholengedwa choyamikiridwa kwambiri, chosirira ndi chokondedwa chomwe ndi chothandiza ndi chatsopano. Mapangidwe opambana Mphoto ya Chitsulo ya A' Design Award awa amaphatikiza machitidwe abwino kwambiri a makampani ndipo ali ndi makhalidwe a ukadaulo oyenerera olumikizidwa ndi chidziwitso ndi luso. Hangar Renovation Ntchito Yaikulu ya Kapangidwe: Kapangidwe ka Mkati mwa Nyumba Yosungiramo Zinthu Zakale amalemekezedwa chifukwa cha kusamala kwake ndipo anapangidwa kuti apereke kukonza kwa moyo kumene kumathandiza kusandutsa dziko kukhala malo abwino.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The very design of the new interior elements has been kept in the industrial convention, which is directly associated with the original function of the Hangar. The designed mezzanine is nothing more than a bridge structure, whose expressive lattice structure catches the eye. Elevated 3m above the ground, the mezzanine was deliberately erected at a certain distance from the building's exterior walls, so as to preserve as much of the building's originality as possible.
- Dimensions & Packaging
- Historic aircraft hangar:
- Designed building area - 2312.39 m2
- Building height - hangar - 10.52m
- Width of the hangar building - 40,64m
- Length of the hangar building - 66,88m
- Number of above-ground floors - 1
- Number of underground floors - hangar - 1
- Volume of the hangar - 21.096 m3
Boiler room:
- Designed building area - 185,88 m2
- Building height - 7.31m
- Building width - 9.50m
- Length of the building - 19.50m
- Number of above-ground floors - 1
- Number of underground floors - 1
- Cubic capacity - 991.6 m3 - Tags
- Hangar, Hangar Czyżyny, Hangar Kraków, Hangar MiT, Hangar museum
- Production Technology
- During the design process, we placed great emphasis on period materials, mainly because the project largely involved reconstruction, or reproduction of the original character. Also when creating new elements, we tried to use materials that could have been used almost a century ago - steel, brick, concrete, wood. Even though the design of some of the interior elements seems to be contemporary, the materials used in producing them are definitely classic.
- Design Challenge
- The most difficult part of the project was combining the historical elements of the hangar with the new elements, which had to be stylistically adapted to each other due to their contemporary nature and technical requirements.
- Research
- The project was preceded by an in-depth architectural study of historical studies of this particular hangar, but also of other hangars from this period. Also, extensive research of the city archives helped to establish the final design guidelines and to proceed with the development of the documentation. All new elements that emerged at the concept stage and later in the construction project resulted directly or indirectly from the research. The entire study was agreed on an ongoing basis with the City Historic Preservation Officer and under his strict protection.
- Inspiration
- The historic aircraft hangar has been converted into a museum of engineering and technology. The interior has been maintained in the chrakter of the era, and the created space will be ideal for both the exposition of automotive objects, but also for the organization of various events and spectacles, as was the case at the last Sacrum Profanum in Krakow.
- Project Duration
- The project will begin in December 2017 and end in 2019. Construction continued until mid-2022.
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.