Skip to content
Kwsa Kuyuriq Pirqa by Leva Engineering

Kwsa Kuyuriq Pirqa by Leva Engineering is a highly esteemed winner of the very prestigious 2025 A' Design Award Qullqi Premiu in Churay Kamay Competition Category.


QullqiChuray· 2025

Kwsa Kuyuriq Pirqa

by Leva Engineering

Client: Leva Engineering

A' Design Award Qullqi Premiu Winner in Churay Category

Colors

The Design

About Kwsa Kuyuriq Pirqa

Kwsa nisqaqa huk kinetic pirqa churasqa (instalación) kaqmi, Riyadh llaqtapi Aramco Innovation Center ukhupi tarikun. Kay llamk'ayqa 209 metro cuadrado hina hatunmi, hinaspa suqta modular pirqakunawan ruwasqa, sapa hukninmi 6000 mm kinraynin hinaspa 7000 mm sayaynin kapun. Kuyuyninqa 20,000 stepper motorkunawan paqarichisqam, chaykunam huk sapaq lead screw hinaspa palanca sistemata purichinku 0.1 mm chaninchay allinkaywan. Kikinmanta llusiq technopolímero nisqamanta ruwasqa hukninkunaqa mana llusinatachu munanku, hinallataq ñawpaqmanta yaykuyta saqinku allichanapaq. Choreografiasqa kuyuykunataqa grayscale video nisqamantam paqarichinku, chaypim k'anchaypa chaninkunaqa hayk'a kuyuyta kananta willanku.

The Recognition

About the A' Design Award Qullqi Premiu

Kwsa Kuyuriq Pirqa A' Design Award Qullqi Premiu mishak kan, ancha jatun yupaychay, kayta hanak, sumak shinallatak mancharina diseñukunaman kun. Qullqi mishak kashkakunaka ancha achikyaska shinallatak ancha mushuk ruraykunami, paykunata rurakkunapak yachayta, yuyayta shinallatak ushayta rikuchinku. Kwsa Kuyuriq Pirqa ruray yachak, ñawpak shinallatak mushuk yuyayta charik sumak rurashka kanata munanku. Kay Qullqi Premiu japishka diseñuka ancha riksishka shinallatak yupaychashka yuyay kan, arti, siensia, diseñu shinallatak tekinolojía ñawpak ñankunata kichuk. Kwsa Kuyuriq Pirqa achka runakunapak munashka rurashka kan, munayta kallarichin, alli yuyaykunata kun shinallatak mancharichin.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
Team Members
Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate