The Courtyard Spațiu Recreațional by Nischal Abhaykumar is a highly esteemed winner of the very prestigious 2019 A' Design Award de Bronz in Design de Arhitectură, Clădiri și Structuri Competition Category.
BronzArhitectură· 2019
The Courtyard Spațiu Recreațional
Client: M9 Design Studio
A' Design Award de Bronz Winner in Arhitectură Category
Verified Award Winner
Verify Award Status for #76233The Design
About The Courtyard Spațiu Recreațional
Curtea este o clădire recreațională și de evenimente, concepută pentru întâlniri comunitare. Structura cu două niveluri are un plan dreptunghiular, cu acoperiș plat, pereți din metal ondulat și un cadru din oțel moale. O fațadă din policarbonat ondulat delimitează spațiul multifuncțional pentru evenimente de la primul etaj și aduce lumină naturală în interior. Draperii texturate căptușesc fațada pentru a controla lumina în timpul spectacolelor. În interior, grinzile din oțel vopsite în negru, tavanele din tablă cutată aparentă și pardoselile din beton și lemn sunt lăsate vizibile. Componentele produse în serie au menținut costurile scăzute și perioada de construcție la 75 de zile.
The Recognition
About the A' Design Award de Bronz
The Courtyard Spațiu Recreațional a câștigat A' Design Award de Bronz, o recunoaștere extrem de prestigioasă acordată designurilor remarcabile care se disting prin creativitate, ingeniozitate și istețime. Câștigătorii Bronzului sunt artefacte din plin pricepute și izbitor de creative, care atestă experiența vastă, imaginația și resursele designerilor lor. Se așteaptă ca The Courtyard Spațiu Recreațional să fie un obiect foarte apreciat, admirat și prețuit, remarcabil de profesionist și inovator. Acest design câștigător al A' Design Award de Bronz încorporează cele mai bune practici din artă, știință, design și tehnologie și este excelent prin atenția la detalii. The Courtyard Spațiu Recreațional satisface splendid nevoile, atinge dorințele, vrăjește sentimentele și stârnește curiozitatea.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The aim was to create a unique building using mass-produced components – cheap price and with short execution timeline. Rectangular in plan, the two-storey building features a flat roof, corrugated metal walls and a mild steel frame. Corrugated polycarbonate sheet facade encases the multi-purpose event space on the first floor. Thin and translucent material is used to replace the regular exterior walls, where natural light can be maximised in the interior space.
- Dimensions & Packaging
- Built-up area - 3500 sqft. (New building only)
Site area - 6000 sqft. - Tags
- Adaptive re-use, modern, industrial, old and new, polycarbonate box
- Production Technology
- A steel structure made up of I-beams is on show inside the building and has been painted black. Deck sheet ceilings are left exposed, while the floors encompass a mixture of concrete and timber.
- Design Challenge
- The designated space earlier comprised of a single two-storey building along with a courtyard, set in the client’s grandparents’ house. It is almost a 50-year-old residence along with a garden café that was utilised for events. In the absence of a dedicated space for various functions, the setting of the space was informal and could not generate much revenue. In order to fill the gaps in the existing design, a new structure was introduced and made sure that it would not overpower the older one in height or by use of materials.
- Research
- Public space is and has been an integral part of communities, serves as a location for people to meet, relax and exchange ideas - refreshment of ones mind or body after work that amuses or stimulates. Informal open recreational space is that which provides opportunities for more passive recreational pursuits. It may also have a scope for informal play. Participation in recreation is regarded as being essential in contributing to people's well being.
- Inspiration
- The site previously formed part of the garden of a house occupied by the clients' grandparents. The design of the new building was intended to minimise its impact on this existing house, both during and after its construction. A desire to maintain a connection with the existing house informed the decision to keepas much of the existing garden area as possible, and to position the entrance to the new building so it opens onto this space.
- Project Duration
- The building was completed in June 2018 and the duration of construction was 75 days.
- Operation Flow
- The inside of this polycarbonate sheet facade is lined by rich textured drapes to control the amount of natural light inside during specific shows and events. Windows are made from the same material as the walls, so they don't offer any additional light but can be opened to let fresh air into the building. At night, lights glowing from within transform the building into a huge light-box along the streetscape.
- Team Members
- Nischal Abhaykumar
Jesal Pathak
Preethi B Raju
Karamveer Singh - Image Credits
- Shamanth Patil Photography
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.