ᱥᱳᱱᱟ ᱱᱚᱜᱚᱨ ᱭᱚᱡᱚᱱᱟ · 2021
Scenic Path Along Guixeres ᱵᱩᱨᱩ ᱫᱤᱥᱚᱢ ᱫᱚᱦᱲᱟ ᱵᱮᱱᱟᱣ
- A' Design Award ᱥᱳᱱᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ 2021 in ᱱᱚᱜᱚᱨ ᱭᱚᱡᱚᱱᱟ
- CLIENT: Batlle I Roig Arquitectura
- Estimated Number of Design Views: 74,897
- Verification code 72FF29E786 · Verify this award
Colors
About Scenic Path Along Guixeres ᱵᱩᱨᱩ ᱫᱤᱥᱚᱢ ᱫᱚᱦᱲᱟ ᱵᱮᱱᱟᱣ
ᱜᱩᱭᱮᱠᱥᱮᱨᱮᱥ ᱥᱮᱫ ᱛᱮ ᱧᱮᱞᱞᱟᱹᱜᱤᱫ ᱦᱚᱨ (Scenic Path Along Guixeres) ᱫᱚ ᱥᱯᱮᱱ ᱨᱮᱭᱟᱜ ᱤᱜᱩᱟᱞᱟᱰᱟ ᱨᱮ ᱢᱟᱲᱟᱝ ᱨᱮᱭᱟᱜ ᱡᱤᱯᱥᱟᱢ ᱵᱟᱦᱟᱞ ᱡᱟᱭᱜᱟ ᱪᱮᱛᱟᱱ ᱨᱮ ᱵᱮᱱᱟᱣᱟᱠᱟᱱ ᱛᱟᱲᱟᱢ ᱟᱨ ᱥᱟᱭᱠᱮᱞ ᱦᱚᱨ ᱠᱟᱱᱟ᱾ ᱱᱚᱶᱟ ᱦᱚᱨ ᱫᱚ ᱥᱟᱦᱟᱨ ᱥᱟᱶᱛᱮ ᱛᱮ ᱵᱮᱱᱟᱣ ᱞᱟᱹᱜᱤᱫ ᱠᱟᱛᱷᱟᱛᱮ ᱦᱟᱨᱭᱟᱲ ᱢᱩᱫᱟᱹᱢ ᱨᱮᱭᱟᱜ ᱢᱤᱫ ᱦᱟᱹᱴᱤᱧ ᱠᱟᱱᱟ᱾ ᱯᱩᱨᱟᱹᱣᱟᱠᱟᱱ ᱦᱟᱹᱴᱤᱧ ᱫᱚ ᱘᱐᱐ ᱢᱤᱴᱟᱨ ᱡᱤᱞᱤᱧ ᱟᱨ ᱕,᱖᱐᱐ ᱵᱚᱨᱜᱚ ᱢᱤᱴᱟᱨ ᱡᱟᱭᱜᱟ ᱮ ᱦᱟᱛᱟᱣᱟᱫᱟ᱾ ᱯᱮᱭᱟ ᱥᱚᱢᱟᱱ ᱛᱮ ᱥᱮᱱᱚᱜ ᱯᱟᱴᱴᱤ ᱦᱚᱨ ᱨᱩᱯ ᱮᱢ ᱠᱟᱱᱟ᱾ ᱛᱟᱞᱟ ᱨᱮᱭᱟᱜ ᱜᱨᱟᱱᱟᱭᱴ ᱜᱤᱛᱤᱞ ᱦᱚᱨ, ᱯᱮᱭᱟ ᱢᱤᱴᱟᱨ ᱚᱥᱟᱨ, ᱡᱟᱸᱦᱟᱸ ᱛᱮ ᱦᱚᱨ ᱫᱚ ᱵᱟᱭ ᱴᱩᱴᱩᱜᱼᱟ᱾ ᱵᱟᱦᱨᱮ ᱥᱮᱫ ᱨᱮᱭᱟᱜ ᱥᱤᱢᱮᱱᱴ ᱦᱚᱨ, ᱑.᱒ ᱢᱤᱴᱟᱨ ᱚᱥᱟᱨ, ᱟᱭᱩᱵ ᱚᱠᱛᱚ ᱨᱮ ᱧᱮᱞ ᱞᱟᱹᱜᱤᱫ ᱛᱮ ᱢᱟᱨᱥᱟᱞ ᱮᱢᱚᱜ ᱫᱷᱤᱨᱤ ᱥᱟᱶ ᱵᱮᱱᱟᱣᱟᱠᱟᱱᱟ ᱟᱨ ᱡᱤᱨᱟᱹᱣ ᱡᱟᱭᱜᱟ ᱥᱟᱶ ᱢᱤᱫ ᱧᱮᱞᱡᱟᱭᱜᱟ ᱮ ᱵᱮᱱᱟᱣᱟᱫᱟ᱾ ᱵᱷᱤᱛᱨᱤ ᱥᱮᱫ ᱨᱮᱭᱟᱜ ᱫᱟᱨᱮ ᱜᱟᱰᱟ ᱫᱚ ᱫᱟᱜ ᱞᱤᱱᱟᱹᱜᱤᱫ ᱦᱚᱨ ᱮᱢᱚᱜᱼᱟ ᱟᱨ ᱦᱩᱰᱤᱧ ᱵᱩᱨᱩ ᱧᱩᱨᱩᱜ ᱮ ᱛᱷᱟᱢᱠᱟᱣᱮᱫᱟ᱾
About the A' Design Award ᱥᱳᱱᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ
Scenic Path Along Guixeres ᱵᱩᱨᱩ ᱫᱤᱥᱚᱢ ᱫᱚᱦᱲᱟ ᱵᱮᱱᱟᱣ ᱫᱚ A' Design Award ᱥᱳᱱᱟ ᱯᱩᱨᱚᱥᱠᱟᱨ ᱧᱟᱢ ᱟᱠᱟᱱᱟ, ᱱᱚᱶᱟ ᱫᱚ ᱵᱷᱟᱞᱟᱭ ᱛᱮ ᱵᱷᱟᱞᱟᱭ ᱟᱨ ᱥᱩᱱᱫᱚᱨ ᱰᱤᱡᱟᱭᱤᱱ ᱠᱚ ᱞᱟᱹᱜᱤᱫ ᱮᱢ ᱟᱠᱟᱱ ᱥᱚᱢᱟᱱ ᱠᱟᱱᱟ᱾ ᱱᱚᱶᱟ ᱠᱚ ᱫᱚ ᱰᱤᱡᱟᱭᱤᱱᱟᱨ ᱠᱚ ᱨᱮᱭᱟᱜ ᱵᱷᱟᱵᱱᱟ ᱟᱨ ᱵᱷᱟᱞᱟᱭ ᱠᱟᱢᱤ ᱡᱷᱟᱞᱠᱟᱣ ᱠᱚ᱾ Scenic Path Along Guixeres ᱵᱩᱨᱩ ᱫᱤᱥᱚᱢ ᱫᱚᱦᱲᱟ ᱵᱮᱱᱟᱣ ᱫᱚ ᱠᱚᱞᱟ, ᱣᱤᱜᱭᱟᱱ, ᱰᱤᱡᱟᱭᱤᱱ ᱟᱨ ᱴᱮᱠᱱᱚᱞᱚᱡᱤ ᱨᱮᱭᱟᱜ ᱥᱤᱢᱟ ᱵᱟᱲᱦᱟᱣ ᱟᱨ ᱫᱩᱱᱤᱭᱟ ᱵᱷᱟᱞᱟᱭ ᱞᱟᱹᱜᱤᱫ ᱜᱚᱲᱚ ᱮᱢ ᱠᱟᱱᱟ᱾
Press Kit
- Unique Properties
- The project has two main goals: first, connectivity, achieving the continuity of this global project around the whole city (the green ring). Second, landscape and biodiversity recovery, establishing the necessary elements to generate a new dynamic on the site that will progressively improve its environmental conditions through the use of collected water. In this sense, the proposal creates a typical section with three clearly differentiated strips that adapt to the different situations of the layout, addressing the problems of the site as well as developing its potential.
- Dimensions & Packaging
- 5.600 sqm / 800 meters long
- Tags
- Landscape Recovery, Pedestrian Path, Cyclable Lane, Rest Areas, Viewpoint, Architecture Landscape, Biodiversity
- Production Technology
- The central strip, with the main 3-metre-wide granitic-sand track, guarantees the continuity of the Green Ring. The outer strip is a linear lookout overlooking the city. A 1.2-metre-wide track paved with concrete to ensure the accessibility and using luminescent aggregate to improve visibility during the evening. The layout of this linear scenic viewpoint recognises the principal existing landmarks, vegetation and trees by widening and creating rest areas. The inner strip acts as a plant ditch, to channel runoff and generates a safety strip to stop minor landslips. These same fallen rocks are used to build a sequence of retaining areas to filter and rechannel this water to new points where vegetation has been planted to colonise the place.
- Design Challenge
- The project was born and built during the crisis, for which we had a very small budget available. We were asked just to solve a new path through that location in order to ensure the continuity of the Igualada Green Ring, but the knowledge acquired about the site and its values forced us to take the whole former gypsum mines as our scope of work. We did not want to design a project of a simple path, oblivious to everything observed and its potentials. Our desire was to recover the entire area, historically abandoned, and integrate it into the green and social infrastructure of the city.
- Research
- The proposal’s innovation lies in the result of this process of analysis and synthesis that concludes with the technification of conventional solutions for path construction, in order to accomplish greater performance regarding accessibility, visibility, durability and re naturalization of the environment, with an optimum cost ratio and maximum efficiency regarding environmental footprint.
- Inspiration
- The project is framed within Igualada’s Green Ring, creating a set of pedestrian and bicycle paths as a belt around the city. This new green sustainable mobility infrastructure aims at establishing a network of free spaces, apt for environmentally friendly leisure activities, adapting and recovering, to great extent, currently underused or degraded spaces. In this context, the gypsum mines path implies the adaptation of a 1,65km section, of which 800 meters have already been accomplished.
- Project Duration
- The project, located in Igualada (next to Barcelona, Spain) started in May 2017 and finished in January 2018.
- Operation Flow
- The intervention creates a landmark visible from afar (the viewpoint) that acts as a reclamation for the whole city and encourages the use of space. Also, the path is completed with a number of small living areas strategically placed on the most privileged areas. This section of the path ends in a final observation deck cantilevering over the mountain providing a panoramic view of the Anoia and Montserrat Mountain. The project has had an exceptional reception from the citizens. They flock to stroll and practice sports in their leisure time. This has motivated the municipality to go on with additional segments of the track to continue extending this Green Path around the city.
- Patents
- Copyrights belong to Batlle i Roig Arquitectura, 2020.
- Image Credits
- Image #1: Photographer Jordi Surroca, Guixeres (1), 2018. Image #2: Photographer Jordi Surroca, Guixeres (2), 2018. Image #3: Photographer Jordi Surroca, Guixeres (3), 2018. Image #4: Photographer Jordi Surroca, Guixeres (4), 2018. Image #5: Photographer Jordi Surroca, Guixeres (5), 2018.