About Songpingshan Gasilska postaja
Songpingshan je gasilska postaja v Shenzhenu na Kitajskem. Postaja 1. razreda ima površino parcele 3.660,1 kvadratnih metrov in bruto tlorisno površino 5.791,64 kvadratnih metrov ter sprejme sedem gasilskih vozil. Razporeditev z notranjim dvoriščem zmanjšuje hrup s ceste na severni strani. V pritličju so nameščeni garaža za gasilska vozila, vhodna avla, jedilnica in komunikacijska soba. Zgornja nadstropja zavzemajo prostori za pripravljenost dežurnih ekip, operativni prostori in pomožni prostori. Poti za obiskovalce potekajo po hodniku na mezaninu, tako da vsakodnevno usposabljanje in dežurne poti niso motene.
The Recognition
About the Bronasta nagrada A' Design Award
Songpingshan Gasilska postaja je prejemnik Bronaste nagrade A' Design Award, zelo prestižnega priznanja, ki se podeljuje izjemnim oblikovanjem, ki se odlikujejo po ustvarjalnosti, iznajdljivosti in bistrosti. Prejemniki Bronaste nagrade so v celoti spretni in presenetljivo ustvarjalni artefakti, ki potrjujejo bogate izkušnje, domišljijo in zvitost svojih oblikovalcev. Od Songpingshan Gasilska postaja se pričakuje, da bo visoko cenjen, občudovan in ljubljen predmet, opazno profesionalen in inovativen. To oblikovanje, nagrajeno z Bronasto nagrado A' Design Award, vključuje najboljše prakse v umetnosti, znanosti, oblikovanju in tehnologiji ter je odlično po pozornosti do podrobnosti. Songpingshan Gasilska postaja sijajno zadovoljuje potrebe, se dotika želja, očara čustva in vzbuja radovednost.
Behind the Design
Press Kit
Credits, team members and technical details provided by the designer.
- Unique Properties
- The main entrance and exit is set at the southeast corner of the site, through which firefighters and visitors enter the fire station. The fire garage faces the square. Fire garage, entrance hall, canteen and communication room are arranged on 1F, firefighters duty preparation room and lavatory are organized on 2F, and operation room and auxiliary room are set on 3F, 4F and 5F. Basement mainly accommodates equipment rooms. Multiple rest platforms are arranged to enrich the lives of firefighters.
- Dimensions & Packaging
- The project is a Grade-1 fire station with a plot area of 3,660.1 square meters and a gross floor area of 5,791.64 square meters, which can accommodate 7 fire trucks. Fire garage, entrance hall, canteen and communication room are arranged on 1F, firefighters duty preparation room and lavatory are organized on 2F, and operation room and auxiliary room are set on 3F, 4F and 5F.
- Tags
- Inner courtyard-style layout, Grade-1 fire station, Special set-back line, Overlapping circulation routes, Shading structure, Green design, Sponge city technologies
- Production Technology
- The forms of each building feature a simple style and the building bodies have reasonable coefficient. The window-to-wall ratio and the area of curtain wall and external window meet relevant regulations and requirements. Each building is designed based on facades and adopts shading structure.
Green architecture and sponge city technologies are applied to roof fruit garden. Concave green area is set for rainwater absorption, storage and seepage, controlling the rainwater runoff within the site. - Design Challenge
- Limited land area: The building set-back lines cannot be fully in accordance with the requirements of Shenzhen local regulations. After several times of negotiations with the planning bureau about set-back lines, the design team reached a reasonable bargain: the plot is set back at least 1.0m on the east side, 2.3m on the south side, 38.1m on the west side, and at least 8.15m on the north side. In this way, the fire station and the sports field are reasonably arranged within the limited land.
- Research
- Due to the Songpingshan Gas Vaporizing Station on the northwest corner, the building should be set back for 50m according to relevant regulations, which has a great impact on the spatial layout. On the basis of satisfying the requirements of set-back line, the design creates a curved screen wall to unfold a "dialogue" with the gas vaporizing station.
In response to the serious noise interference from Beihuan Avenue on the north, the project adopts an inner courtyard-style layout. - Inspiration
- The project is designed according to the research results of "2014 Shenzhen Fire Station Standardization Design Workshop". The experience of this project will be utilized to establish construction standards on fire stations in Shenzhen, so as to satisfy the requirements of building more fire stations and provide a reference for domestic fire station constructions.
- Project Duration
- The project started in September 2016 and finished in December 2019 at the intersection of Baoshen Road and Keyuan Road, Nanshan District in Shenzhen, China.
- Operation Flow
- Fire trucks leave the station via an exit nearby the street, greatly improving response efficiency.
Overlapping circulation routes: Public participation is encouraged. Visiting areas open for citizens are mainly organized on 1F and mezzanine. Visitors' circulation routes pass through the mezzanine corridor, without affecting the internal daily training and duty circulation routes of firefighters. - Team Members
- Zhong Zhong
Zhong Botao
Ma Ying
Wei Qijing
Zhang Zilu
Wang Min
Yong Yong
Xiong Feng
Wu Zirong
He Xiaoming
Liu Mu
Tang Jin - Image Credits
- Inter_mountain
Sponsored
Explore Beyond Designers.org
Discover products, services and opportunities from our advertising partners.
More to Explore
Related Designs
Explore more award-winning designs from the same category, selected by merit.