Dhizaini Greenland Bund Centre Primary Function: Chivakwa cheKushandiswa Kwakasanganiswa naRongpu XU ndiye mukundi anokudzwa zvikuru wemubairo unoremekedza we2021 Mubairo weSirivha we A' Design Award muChikwata cheKukwikwidza cheKuvaka neMapurojekiti eZvivako.
SirivhaZvivako· 2021
Greenland Bund Centre Primary Function: Chivakwa cheKushandiswa Kwakasanganiswa
na Rongpu XU
Mutengi: Greenland Bund Centre
Mukundi weMubairo weSirivha we A' Design Award muChikwata cheZvivako
Mukundi weMubairo Akasimbiswa
Simbisa Mamiriro eMubairo we#107260Dhizaini
Nezvekwa Greenland Bund Centre Primary Function: Chivakwa cheKushandiswa Kwakasanganiswa
Greenland Bund Centre chivakwa chekushandiswa kwakasanganiswa chiri paSouth Bund yeShanghai. Nzvimbo iyi ine masikweya mita zvuru zana nemakumi maviri nezvitanhatu nemazana manomwe (126,700), ine yakazara nzvimbo yekuvaka yemasikweya mita miriyoni imwe nezvikamu zviviri (1.2 miriyoni). Nhare dzemahofisi eKirasi A, dzimba dzekugara, nzvimbo dzekutengesa, nzvimbo dzetsika nenzvimbo dzeruzhinji zvakasanganiswa nezvivakwa zvenhoroondo zvakachengetwa. Zvivakwa zvidiki nenzira dzevanhu vanofamba netsoka zvinobatanidza chivakwa ichi kudhorobha rekare riri pedyo. Musimboti wechinyorwa chekumabvazuva-kumadokero uye musimboti wetsika wekuchamhembe-kumaodzanyemba zvinobatanidza mahombekombe erwizi nedunhu rakapoteredza.
Kuzivikanwa
Nezve Mubairo weSirivha we A' Design Award
Mubairo weSirivha we A' Design Award wakahwinwa ne Greenland Bund Centre Primary Function: Chivakwa cheKushandiswa Kwakasanganiswa, rukudzo rwakakwirira zvikuru runopiwa kumadhizaini epamusoro, anonaka uye anofadza. Vakunda veSirivha mabasa anopenya kwazvo uye ane kugadzira kwakasiyana anoratidza unyanzvi, hunyanzvi hwekusikwa nekungwara kwevagadziri vawo. Greenland Bund Centre Primary Function: Chivakwa cheKushandiswa Kwakasanganiswa inotarisirwa kuva basa rinoshamisa, rinotangira vamwe, rine hunyanzvi hunoonekwa uye zvitsva zvakadzika. Dhizaini iyi yakahwina Mubairo weSirivha we A' Design Award chigadzirwa chinoshamisa, chinokudzwa chinobatsira uye chinosundira mberi miganhu yehunyanzvi, sayenzi, dhizaini netekinoroji. Greenland Bund Centre Primary Function: Chivakwa cheKushandiswa Kwakasanganiswa chigadzirwa chinoshuvirwa nevazhinji, chinomutsa zvishuvo, chinouya nemanzwiro akanaka uye chinomutsa kushamisika.
Shure kweDhizaini
Bepa Renhau
Zvikwereti, nhengo dzetiimu nezvimwe zvakadzama zvakapihwa nemudhizaina.
- Hunhu Hwakasiyana
- Greenland Bund Centre is a mixed-use complex on South Bund of Shanghai. The 127,000-sq.-meter site contains world-class office and residential towers and an array of historic structures, retail, cultural and public spaces, forming a 24/7 environment that reflects the highest values of contemporary society. The concept is destined to become an international model.
- Kukura & Kupakiwa
- Located in Shanghai’s South Bund, Greenland Bund Centre covers 126,700 m2 with a total construction area of 1.2 million m2 containing super-tall Class A office towers and world-class residential buildings.
- Matagi
- Greenland Bund Centre , a landmark destination, mixed-use complex, 24/7 environment, 5G integrated ecosystem
- Tekinoroji Yekugadzira
- Working with industry, universities, research bodies and technology companies, the project produced a number of innovations including a high-performance composite structure, innovative structural state monitoring technology and the first experimental site for a 5G integrated ecosystem, to name just a few.
- Changamire yeDhizaini
- The key design challenge is to harmonize scale on site and with surrounding context while also relating to the E/W green axis and N/S cultural axis to create a 24/7 public environment. Goals aim to serve functions of a modern financial center in a pedestrian space and create an urban landscape that attends both to history and development. A public space strategy integrates the riverside and open space into the project. Green space flows into the neighborhood forming public space at the intersection centered on the Dongjiadu Catholic Church. To emphasize relationship with the city surroundings, the axis continues the fish-bone layout of the Dongjiadu area and connects to the green belt. The Arts Center intersects with a major public activity zone of the South Bund.
- Tsvakurudzo
- The goal of the project is to create a small-scale mixed-use, dynamic and orderly architectural form, and an embedded urban texture closely combined with the Old Town environment by adopting the public space strategy of riverside and hinterland infiltration and integration.
In using the small-scaled building language, it is to create an international urban form; a people-oriented block space serving the modern functions of compound financial center; and a three-dimensional, ecological and diversified urban landscape by balancing the tradition elements and new development.
The east/west axis is the principle landscape axis running through office towers, a landscaped park, a garden-style centralized commerce, riverside CBDs, and waterfront nodes between east and west. The north/south axis is mainly a green landscape axis connecting the Dongjiadu Catholic Church, the Greenland Cultural Corridor, the Merchant Shipping Guild Hall and other historical and cultural elements from north to south.
In terms of spatial form, it is to create an agreeable small, public and vibrant space easy for management with complex functions. The garden-style centralized commerce, on the other hand, embodies the organic combination of commercial functions, green landscape system and elevated pedestrian system. - Chikurudziro
- Linking historical inheritance to future trends, the Bund Centre is set to become a landmark development within the Financial Cluster Zone along the Shanghai's Bund. The project expands on the economic foundation of the historic Dongjiadu port that launched Shanghai as a commercial center. Also, the project maintains historical integrity and the social fabric of the area by preserving the status of the Shanghai old town districts.
- Nguva yePurojekiti
- The project began in September 2016 and is scheduled for completion in December 2022. The Class A office buildings were completed in March 2020. The landmark tower will be completed in June 2022.
Location:No. 998, Zhongshan South Road, Huangpu District, Shanghai - Nhengo dzeTimu
- Chairman and General manager: Rongpu XU
Producer:Ran DUAN
Director:Hongliang CHEN
Architect:Robert Whitlock
Jamie von Klemperer
Jeff Kenoff
Yakatsigirwa
Ongorora Kupfuura Designers.org
Wana zvigadzirwa, masevhisi nemikana kubva kuvatengesi vedu vekushambadza.
Zvimwe Zvekuongorora
Dhizaini Dzakafanana
Ongorora dzimwe dhizaini dzakawana mibairo kubva mudunhu rimwe chete, dzakasarudzwa nekuda kwehunhu hwadzo.